메뉴 건너뛰기




Volumn 55, Issue 4, 2008, Pages 758-765

Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation

Author keywords

Defectives products; EPQ inventory model and algebraic development; Rework process

Indexed keywords

DIFFERENTIATION (CALCULUS); DISTRIBUTION OF GOODS; INDUSTRIAL ENGINEERING; INVENTORY CONTROL; OPTIMAL SYSTEMS; SOLUTIONS;

EID: 55649099841     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2007.07.017     Document Type: Article
Times cited : (137)

References (7)
  • 1
    • 34447260758 scopus 로고    scopus 로고
    • On optimal manufacturing batch size with rework process at single-stage production system
    • Cárdenas-Barrón L.E. On optimal manufacturing batch size with rework process at single-stage production system. Computers and Industrial Engineering 53 1 (2007) 196-198
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 196-198
    • Cárdenas-Barrón, L.E.1
  • 3
    • 0035906315 scopus 로고    scopus 로고
    • The economic production quantity (EPQ) with shortage derived algebraically
    • Cárdenas-Barrón L.E. The economic production quantity (EPQ) with shortage derived algebraically. International Journal of Production Economics 70 3 (2001) 289-292
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 289-292
    • Cárdenas-Barrón, L.E.1
  • 5
    • 0043026623 scopus 로고    scopus 로고
    • Material requirements planning and manufacturing resource planning
    • Warner M. (Ed), Routledge, London
    • Grubbström R.W. Material requirements planning and manufacturing resource planning. In: Warner M. (Ed). International encyclopedia of business and management (1996), Routledge, London
    • (1996) International encyclopedia of business and management
    • Grubbström, R.W.1
  • 6
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at single-stage production system
    • Jamal A.A.M., Sarker B.R., and Mondal S. Optimal manufacturing batch size with rework process at single-stage production system. Computers and Industrial Engineering 47 1 (2004) 77-89
    • (2004) Computers and Industrial Engineering , vol.47 , Issue.1 , pp. 77-89
    • Jamal, A.A.M.1    Sarker, B.R.2    Mondal, S.3
  • 7
    • 34548565651 scopus 로고    scopus 로고
    • Optimal batch sizing in a multi-stage production system with rework consideration
    • Sarker B.R., Jamal A.A.M., and Mondal S. Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research 184 3 (2008) 915-929
    • (2008) European Journal of Operational Research , vol.184 , Issue.3 , pp. 915-929
    • Sarker, B.R.1    Jamal, A.A.M.2    Mondal, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.