-
1
-
-
0003515463
-
-
Prentice Hall Upper Saddle River, NJ
-
R. Ahuja, J. Orlin, and T. Magnanti Network Flows: Theory, Algorithms, and Applications 1993 Prentice Hall Upper Saddle River, NJ
-
(1993)
Network Flows: Theory, Algorithms, and Applications
-
-
Ahuja, R.1
Orlin, J.2
Magnanti, T.3
-
2
-
-
0001049772
-
Strategies for the probabilistic lot-sizing problem with service-level constraints
-
J.H. Bookbinder, and J.Y. Tan Strategies for the probabilistic lot-sizing problem with service-level constraints Management Science 34 9 1988 1096 1108
-
(1988)
Management Science
, vol.34
, Issue.9
, pp. 1096-1108
-
-
Bookbinder, J.H.1
Tan, J.Y.2
-
3
-
-
0000462003
-
Elements of large-scale mathematical programming. Part i: Concepts
-
A.M. Geoffrion Elements of large-scale mathematical programming. Part i: Concepts Management Science 16 11 1970 652 675
-
(1970)
Management Science
, vol.16
, Issue.11
, pp. 652-675
-
-
Geoffrion, A.M.1
-
4
-
-
1642338367
-
-
Sybex, Inc., 2021 Challenger Driver, Suite 100, Alameda, CA 94501, USA
-
Philip Heller, Simon Roberts. Java 2 Developer's Handbook. Sybex, Inc., 2021 Challenger Driver, Suite 100, Alameda, CA 94501, USA, 1999.
-
(1999)
Java 2 Developer's Handbook
-
-
Heller, P.1
Roberts, S.2
-
5
-
-
52949121426
-
A global chance-constraint for stochastic inventory systems under service level constraints
-
R. Rossi, S.A. Tarim, B. Hnich, and S. Prestwich A global chance-constraint for stochastic inventory systems under service level constraints Constraints 13 2008 490 517
-
(2008)
Constraints
, vol.13
, pp. 490-517
-
-
Rossi, R.1
Tarim, S.A.2
Hnich, B.3
Prestwich, S.4
-
7
-
-
0005041648
-
Dynamic lot sizing with random demand and non-stationary costs
-
PII S0167637797000059
-
C.R. Sox Dynamic lot sizing with random demand and non-stationary costs Operations Research Letters 20 1997 155 164 (Pubitemid 127427673)
-
(1997)
Operations Research Letters
, vol.20
, Issue.4
, pp. 155-164
-
-
Sox, C.R.1
-
8
-
-
0742266961
-
The stochastic dynamic production/inventory lot-sizing problem with service-level constraints
-
S.A. Tarim, and B.G. Kingsman The stochastic dynamic production/inventory lot-sizing problem with service-level constraints International Journal of Production Economics 88 1 2004 105 119
-
(2004)
International Journal of Production Economics
, vol.88
, Issue.1
, pp. 105-119
-
-
Tarim, S.A.1
Kingsman, B.G.2
-
9
-
-
40849133916
-
Constraint programming for computing non-stationary (R, S) inventory policies
-
DOI 10.1016/j.ejor.2006.11.048, PII S0377221707006728
-
S.A. Tarim, and B. Smith Constraint programming for computing non-stationary (R, S) inventory policies European Journal of Operational Research 189 3 2008 1004 1021 (Pubitemid 351400591)
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1004-1021
-
-
Tarim, S.A.1
Smith, B.M.2
-
10
-
-
33847293780
-
On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints
-
H. Tempelmeier On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints European Journal of Operational Research 181 2007 184 194
-
(2007)
European Journal of Operational Research
, vol.181
, pp. 184-194
-
-
Tempelmeier, H.1
-
11
-
-
63349104845
-
An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model
-
V. Vargas An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model European Journal of Operational Research 198 2009 447 451
-
(2009)
European Journal of Operational Research
, vol.198
, pp. 447-451
-
-
Vargas, V.1
|