-
1
-
-
78049444992
-
A neurogenetic approach for the resource-constrained project scheduling problem
-
A. Agarwal, S. Colak, and S. Erenguc A neurogenetic approach for the resource-constrained project scheduling problem Comput. Oper. Res. 38 1 2011 44 50
-
(2011)
Comput. Oper. Res.
, vol.38
, Issue.1
, pp. 44-50
-
-
Agarwal, A.1
Colak, S.2
Erenguc, S.3
-
2
-
-
84864467088
-
Particle swarm based hyper-heuristic for tackling real world examinations scheduling problem
-
A. Ahmed, M. Ali, A. Sajid, and A.H.S. Bukhari Particle swarm based hyper-heuristic for tackling real world examinations scheduling problem Aust. J. Basic Appl. Sci. 5 10 2011 1406 1413
-
(2011)
Aust. J. Basic Appl. Sci.
, vol.5
, Issue.10
, pp. 1406-1413
-
-
Ahmed, A.1
Ali, M.2
Sajid, A.3
Bukhari, A.H.S.4
-
3
-
-
0042287689
-
A robust genetic algorithm for resource allocation in project scheduling
-
J. Alcaraz, and C. Maroto A robust genetic algorithm for resource allocation in project scheduling Ann. Oper. Res. 102 1-4 2001 83 109
-
(2001)
Ann. Oper. Res.
, vol.102
, Issue.14
, pp. 83-109
-
-
Alcaraz, J.1
Maroto, C.2
-
4
-
-
84870299834
-
Hybrid particle swarm optimization transplanted into a hyper-heuristic structure for solving examination timetabling problem
-
M. Alinia Ahandani, M.T. Vakil Baghmisheh, M.A. Badamchi Zadeh, and S. Ghaemi Hybrid particle swarm optimization transplanted into a hyper-heuristic structure for solving examination timetabling problem Swarm Evol. Comput. 7 December 2012 21 34
-
(2012)
Swarm Evol. Comput.
, vol.7
, Issue.DECEMBER
, pp. 21-34
-
-
Alinia Ahandani, M.1
Vakil Baghmisheh, M.T.2
Badamchi Zadeh, M.A.3
Ghaemi, S.4
-
5
-
-
77950952082
-
A simulated annealing hyperheuristic for construction resource levelling
-
K.P. Anagnostopoulos, and G.K. Koulinas A simulated annealing hyperheuristic for construction resource levelling Constr. Manage. Econ. 28 2 2010 163 175
-
(2010)
Constr. Manage. Econ.
, vol.28
, Issue.2
, pp. 163-175
-
-
Anagnostopoulos, K.P.1
Koulinas, G.K.2
-
7
-
-
84859559015
-
Resource-constrained critical path scheduling by a GRASP based hyperheuristic
-
K. Anagnostopoulos, and G. Koulinas Resource-constrained critical path scheduling by a GRASP based hyperheuristic ASCE J. Comput. Civil Eng. 26 2 2012 204 213
-
(2012)
ASCE J. Comput. Civil Eng.
, vol.26
, Issue.2
, pp. 204-213
-
-
Anagnostopoulos, K.1
Koulinas, G.2
-
8
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
J. Blazewicz, J.K. Lenstra, and A.H.G. Rinnooy Kan Scheduling subject to resource constraints: classification and complexity Discrete Appl. Math. 5 1 1983 11 24
-
(1983)
Discrete Appl. Math.
, vol.5
, Issue.1
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
9
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
-
K. Bouleimen, and H. Lecocq A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version Eur. J. Oper. Res. 149 2 2003 268 281
-
(2003)
Eur. J. Oper. Res.
, vol.149
, Issue.2
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
10
-
-
0032096810
-
A branch-and-bound algorithm for the resource constrained project scheduling problem
-
P. Brucker, S. Knust, A. Schoo, and O. Thiele A branch-and-bound algorithm for the resource constrained project scheduling problem Eur. J. Oper. Res. 107 2 1998 272 288
-
(1998)
Eur. J. Oper. Res.
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
11
-
-
3042708858
-
Hyper-heuristics: An emerging direction in modern search technology
-
F. Glover, G.A. Kochenberger, Kluwer Academic Publishers Dordrecht
-
E. Burke, G. Kendall, J. Newall, E. Hart, P. Ross, and S. Schulenburg Hyper-heuristics: an emerging direction in modern search technology F. Glover, G.A. Kochenberger, Handbook of Metaheuristics 2003 Kluwer Academic Publishers Dordrecht 457 474
-
(2003)
Handbook of Metaheuristics
, pp. 457-474
-
-
Burke, E.1
Kendall, G.2
Newall, J.3
Hart, E.4
Ross, P.5
Schulenburg, S.6
-
12
-
-
1442283467
-
A tabu search hyperheuristic for timetabling and rostering
-
E. Burke, G. Kendall, and E. Soubeiga A tabu search hyperheuristic for timetabling and rostering J. Heuristics 9 6 2003 451 470
-
(2003)
J. Heuristics
, vol.9
, Issue.6
, pp. 451-470
-
-
Burke, E.1
Kendall, G.2
Soubeiga, E.3
-
13
-
-
27144531258
-
An ant algorithm hyper-heuristic for the project presentation scheduling problem
-
IEEE Computer Society Press Edinburgh, Scotland
-
E.K. Burke, G. Kendall, D. Landa-Silva, R. O'Brien, and E. Soubeiga An ant algorithm hyper-heuristic for the project presentation scheduling problem Proceedings of the 2005 IEEE Congress on Evolutionary Computation, CEC 2005 2005 IEEE Computer Society Press Edinburgh, Scotland 2263 2270
-
(2005)
Proceedings of the 2005 IEEE Congress on Evolutionary Computation, CEC 2005
, pp. 2263-2270
-
-
Burke, E.K.1
Kendall, G.2
Landa-Silva, D.3
O'Brien, R.4
Soubeiga, E.5
-
14
-
-
79955748288
-
-
School of Computer Science and Information Technology, University of Nottingham, Computer Science Technical Report No. NOTTCS-TR-SUB-0906241418-2747
-
E.K. Burke, M. Hyde, G. Kendall, G. Ochoa, E. Ozcan, R. Qu, Hyper-Heuristics: A Survey of the State of the Art, School of Computer Science and Information Technology, University of Nottingham, Computer Science Technical Report No. NOTTCS-TR-SUB-0906241418-2747, 2010. < http://www.cs.nott.ac.uk/ ~gxo/papers/hhsurvey.pdf >.
-
(2010)
Hyper-Heuristics: A Survey of the State of the Art
-
-
Burke, E.K.1
Hyde, M.2
Kendall, G.3
Ochoa, G.4
Ozcan, E.5
Qu, R.6
-
15
-
-
78149247678
-
A classification of hyper-heuristic approaches
-
M. Gendreau, J-Y. Potvin, International Series in Operations Research & Management Science Springer
-
E.K. Burke, M. Hyde, G. Kendall, G. Ochoa, E. Ozcan, and J. Woodward A classification of hyper-heuristic approaches M. Gendreau, J-Y. Potvin, Handbook of Metaheuristics International Series in Operations Research & Management Science vol. 146 2010 Springer 449 468
-
(2010)
Handbook of Metaheuristics
, vol.146
, pp. 449-468
-
-
Burke, E.K.1
Hyde, M.2
Kendall, G.3
Ochoa, G.4
Ozcan, E.5
Woodward, J.6
-
16
-
-
45949085601
-
Hyperheuristics: Recent developments
-
C. Cotta, M. Sevaux, K. Sorensen, Springer Berlin
-
K. Chakhlevitch, and P. Cowling Hyperheuristics: recent developments C. Cotta, M. Sevaux, K. Sorensen, Adaptive and Multilevel Metaheuristics, Studies in Computational Intelligence vol. 136 2008 Springer Berlin 3 29
-
(2008)
Adaptive and Multilevel Metaheuristics, Studies in Computational Intelligence
, vol.136
, pp. 3-29
-
-
Chakhlevitch, K.1
Cowling, P.2
-
17
-
-
73149125765
-
An efficient hybrid algorithm for resource-constrained project scheduling
-
W. Chen, Y.-j. Shi, H.-f. Teng, X.-p. Lan, and L-c. Hu An efficient hybrid algorithm for resource-constrained project scheduling Inf. Sci. 180 6 2010 1031 1039
-
(2010)
Inf. Sci.
, vol.180
, Issue.6
, pp. 1031-1039
-
-
Chen, W.1
Shi, H.-F.2
Teng, X.-P.3
-
18
-
-
79951581770
-
Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
-
R.M. Chen Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem Expert Syst. Appl. 38 6 2011 7102 7111
-
(2011)
Expert Syst. Appl.
, vol.38
, Issue.6
, pp. 7102-7111
-
-
Chen, R.M.1
-
19
-
-
84872015521
-
Parameter tuning of a choice-function based hyperheuristic using Particle Swarm Optimization
-
B. Crawford, R. Soto, E. Monfroy, W. Palma, C. Castro, and F. Paredes Parameter tuning of a choice-function based hyperheuristic using Particle Swarm Optimization Expert Syst. Appl. 40 5 2013 1690 1695
-
(2013)
Expert Syst. Appl.
, vol.40
, Issue.5
, pp. 1690-1695
-
-
Crawford, B.1
Soto, R.2
Monfroy, E.3
Palma, W.4
Castro, C.5
Paredes, F.6
-
20
-
-
70349999421
-
Particle swarm topologies for resource constrained project scheduling
-
N. Krasnogor, Springer-Verlag Berlin, Heildeberg
-
J. Czogalla, and A. Fink Particle swarm topologies for resource constrained project scheduling N. Krasnogor, Nature Inspired Cooperative Strategies for Optimization 2009 Springer-Verlag Berlin, Heildeberg 61 73
-
(2009)
Nature Inspired Cooperative Strategies for Optimization
, pp. 61-73
-
-
Czogalla, J.1
Fink, A.2
-
21
-
-
25444456205
-
A hybrid scatter search/electromagnetism metaheuristic for project scheduling
-
D. Debels, B. De Reyck, R. Leus, and M. Vanhoucke A hybrid scatter search/electromagnetism metaheuristic for project scheduling Eur. J. Oper. Res. 169 2 2006 638 653
-
(2006)
Eur. J. Oper. Res.
, vol.169
, Issue.2
, pp. 638-653
-
-
Debels, D.1
De Reyck, B.2
Leus, R.3
Vanhoucke, M.4
-
22
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
E. Demeulemeester, and W. Herroelen A branch-and-bound procedure for the multiple resource-constrained project scheduling problem Manage. Sci. 38 12 1992 1803 1818
-
(1992)
Manage. Sci.
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
24
-
-
0029215084
-
Evolution based learning in a job shop scheduling environment
-
U. Dorndorf, and E. Pesch Evolution based learning in a job shop scheduling environment Comput. Oper. Res. 22 1 1995 25 40
-
(1995)
Comput. Oper. Res.
, vol.22
, Issue.1
, pp. 25-40
-
-
Dorndorf, U.1
Pesch, E.2
-
25
-
-
33845941176
-
A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation
-
K.A. Dowsland, E. Soubeiga, and E. Burke A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation Eur. J. Oper. Res. 179 3 2007 759 774
-
(2007)
Eur. J. Oper. Res.
, vol.179
, Issue.3
, pp. 759-774
-
-
Dowsland, K.A.1
Soubeiga, E.2
Burke, E.3
-
26
-
-
80052261681
-
An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
-
C. Fang, and L. Wang An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem Comput. Oper. Res. 39 5 2012 890 901
-
(2012)
Comput. Oper. Res.
, vol.39
, Issue.5
, pp. 890-901
-
-
Fang, C.1
Wang, L.2
-
27
-
-
84880924661
-
An evolutionary-based hyper-heuristic approach for optimal construction of group method of data handling networks
-
J. Gascón-Moreno, S. Salcedo-Sanz, B. Saavedra-Moreno, L. Carro-Calvo, and A. Portilla-Figueras An evolutionary-based hyper-heuristic approach for optimal construction of group method of data handling networks Inf. Sci. 247 2013 94 108
-
(2013)
Inf. Sci.
, vol.247
, pp. 94-108
-
-
Gascón-Moreno, J.1
Salcedo-Sanz, S.2
Saavedra-Moreno, B.3
Carro-Calvo, L.4
Portilla-Figueras, A.5
-
28
-
-
80053573347
-
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
-
J.F. Goncalves, M.G.C. Resende, and J.J.M. Mendes A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem J. Heuristics 17 5 2011 467 486
-
(2011)
J. Heuristics
, vol.17
, Issue.5
, pp. 467-486
-
-
Goncalves, J.F.1
Resende, M.G.C.2
Mendes, J.J.M.3
-
29
-
-
11244351342
-
An investigation of a tabu assisted hyper-heuristic genetic algorithm
-
IEEE Computer Society Press Canberra, Australia
-
L. Han, and G. Kendall An investigation of a tabu assisted hyper-heuristic genetic algorithm Proceedings of the 2003 IEEE Congress on Evolutionary Computation, CEC 2003 2003 IEEE Computer Society Press Canberra, Australia 2230 2237
-
(2003)
Proceedings of the 2003 IEEE Congress on Evolutionary Computation, CEC 2003
, pp. 2230-2237
-
-
Han, L.1
Kendall, G.2
-
30
-
-
84878601846
-
A heuristic combination method for solving job-shop scheduling problems
-
A.E. Eiben, T. Back, M. Schoenauer, H.P. Schwefel, Lecture Notes in Computer Science Springer Heidelberg
-
E. Hart, and P. Ross A heuristic combination method for solving job-shop scheduling problems A.E. Eiben, T. Back, M. Schoenauer, H.P. Schwefel, Parallel Problem Solving from Nature - PPSN V Lecture Notes in Computer Science vol. 1498 1998 Springer Heidelberg 845 854
-
(1998)
Parallel Problem Solving from Nature - PPSN v
, vol.1498
, pp. 845-854
-
-
Hart, E.1
Ross, P.2
-
31
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
S. Hartmann A competitive genetic algorithm for resource-constrained project scheduling Nav. Res. Log. 45 7 1998 733 750
-
(1998)
Nav. Res. Log.
, vol.45
, Issue.7
, pp. 733-750
-
-
Hartmann, S.1
-
32
-
-
0036684673
-
A self-adapting genetic algorithm for project scheduling under resource constraints
-
S. Hartmann A self-adapting genetic algorithm for project scheduling under resource constraints Nav. Res. Log. 49 5 2002 433 448
-
(2002)
Nav. Res. Log.
, vol.49
, Issue.5
, pp. 433-448
-
-
Hartmann, S.1
-
33
-
-
77953872383
-
A survey of variants and extensions of the resource constrained project scheduling problem
-
S. Hartmann, and D. Briskorn A survey of variants and extensions of the resource constrained project scheduling problem Eur. J. Oper. Res. 207 1 2010 1 14
-
(2010)
Eur. J. Oper. Res.
, vol.207
, Issue.1
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
34
-
-
0036807111
-
An evolutionary algorithm for resource-constrained project scheduling
-
K.S. Hindi, H. Yang, and K. Fleszar An evolutionary algorithm for resource-constrained project scheduling IEEE Trans. Evol. Comput. 6 5 2002 512 518
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.5
, pp. 512-518
-
-
Hindi, K.S.1
Yang, H.2
Fleszar, K.3
-
35
-
-
36749094527
-
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
-
B. Jarboui, N. Damak, P. Siarry, and A. Rebai A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Appl. Math. Comput. 195 1 2008 299 308
-
(2008)
Appl. Math. Comput.
, vol.195
, Issue.1
, pp. 299-308
-
-
Jarboui, B.1
Damak, N.2
Siarry, P.3
Rebai, A.4
-
36
-
-
0002866635
-
The critical-path method: Resources planning and scheduling
-
J.F. Muth, G.L. Thompson, Prentice-Hall Englewood Cliffs, NJ
-
J.E. Kelley The critical-path method: resources planning and scheduling J.F. Muth, G.L. Thompson, Industrial Scheduling 1963 Prentice-Hall Englewood Cliffs, NJ 347 365
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.E.1
-
37
-
-
69249217757
-
Particle swarm optimization: A study of particle displacement for solving continuous and combinatorial optimization problems
-
S. Kemmoe-Tchomte, and M. Gourgand Particle swarm optimization: a study of particle displacement for solving continuous and combinatorial optimization problems Int. J. Prod. Econ. 121 1 2009 57 67
-
(2009)
Int. J. Prod. Econ.
, vol.121
, Issue.1
, pp. 57-67
-
-
Kemmoe-Tchomte, S.1
Gourgand, M.2
-
38
-
-
0029535737
-
Particle swarm optimization
-
Perth, Australia
-
J. Kennedy, R.C. Eberhart, Particle swarm optimization, in: Proceedings of the Fourth IEEE Conference on Neural Networks, Perth, Australia, 1995, pp. 1942-1948.
-
(1995)
Proceedings of the Fourth IEEE Conference on Neural Networks
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
40
-
-
0034634797
-
Project scheduling with time-varying resource constraints
-
R. Klein Project scheduling with time-varying resource constraints Int. J. Prod. Res. 38 16 2000 3937 3952
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.16
, pp. 3937-3952
-
-
Klein, R.1
-
42
-
-
0030231487
-
Efficient priority rules for the resource-constrained project scheduling problem
-
R. Kolisch Efficient priority rules for the resource-constrained project scheduling problem J. Oper. Manage. 14 3 1996 179 192
-
(1996)
J. Oper. Manage.
, vol.14
, Issue.3
, pp. 179-192
-
-
Kolisch, R.1
-
43
-
-
0030788844
-
PSPLIB - A project scheduling problem library
-
R. Kolisch, and A. Sprecher PSPLIB - a project scheduling problem library Eur. J. Oper. Res. 96 1 1997 205 216
-
(1997)
Eur. J. Oper. Res.
, vol.96
, Issue.1
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
44
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
R. Kolisch, and S. Hartmann Experimental investigation of heuristics for resource-constrained project scheduling: an update Eur. J. Oper. Res. 174 1 2006 23 37
-
(2006)
Eur. J. Oper. Res.
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
45
-
-
84869080389
-
Construction resource allocation and leveling using a threshold accepting based hyperheuristic algorithm
-
G.K. Koulinas, and K.P. Anagnostopoulos Construction resource allocation and leveling using a threshold accepting based hyperheuristic algorithm ASCE J. Constr. Eng. Manage. 138 7 2012 854 863
-
(2012)
ASCE J. Constr. Eng. Manage.
, vol.138
, Issue.7
, pp. 854-863
-
-
Koulinas, G.K.1
Anagnostopoulos, K.P.2
-
46
-
-
58949096631
-
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
-
A. Lova, P. Tormos, M. Cervantes, and F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes Int. J. Prod. Econ. 117 2 2009 302 316
-
(2009)
Int. J. Prod. Econ.
, vol.117
, Issue.2
, pp. 302-316
-
-
Lova, A.1
Tormos, P.2
Cervantes, M.3
Barber, F.4
-
47
-
-
44849140428
-
A random key based genetic algorithm for the resource constrained project scheduling problem
-
J.J.M. Mendes, J.F. Goncalves, and M.G.C. Resende A random key based genetic algorithm for the resource constrained project scheduling problem Comput. Oper. Res. 36 1 2009 92 109
-
(2009)
Comput. Oper. Res.
, vol.36
, Issue.1
, pp. 92-109
-
-
Mendes, J.J.M.1
Goncalves, J.F.2
Resende, M.G.C.3
-
48
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
D. Merkle, M. Middendorf, and H. Schmeck Ant colony optimization for resource-constrained project scheduling IEEE Trans. Evol. Comput. 6 4 2002 333 346
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
49
-
-
0032070635
-
An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation
-
A. Mingozzi, V. Maniezzo, S. Ricciardelli, and L. Bianco An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation Manage. Sci. 44 5 1998 714 729
-
(1998)
Manage. Sci.
, vol.44
, Issue.5
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
50
-
-
78751634245
-
An Artificial Immune Algorithm for the project scheduling problem under resource constraints
-
M. Mobini, Z. Mobini, and M. Rabbani An Artificial Immune Algorithm for the project scheduling problem under resource constraints Appl. Soft Comput. 11 2 2011 1975 1982
-
(2011)
Appl. Soft Comput.
, vol.11
, Issue.2
, pp. 1975-1982
-
-
Mobini, M.1
Mobini, Z.2
Rabbani, M.3
-
51
-
-
84888782064
-
Formulation and tabu search algorithm for the resource constrained project scheduling problem
-
C.C. Ribeiro, P. Hansen, Kluwer Academic Publishers Dordrecht
-
K. Nonobe, and T. Ibaraki Formulation and tabu search algorithm for the resource constrained project scheduling problem C.C. Ribeiro, P. Hansen, Essays and Surveys in Metaheuristics 2002 Kluwer Academic Publishers Dordrecht 557 588
-
(2002)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
52
-
-
78049530134
-
A cooperative hyper-heuristic search framework
-
D. Ouelhadj, and S. Petrovic A cooperative hyper-heuristic search framework J. Heuristics 16 6 2010 835 857
-
(2010)
J. Heuristics
, vol.16
, Issue.6
, pp. 835-857
-
-
Ouelhadj, D.1
Petrovic, S.2
-
53
-
-
4444294743
-
LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
-
M. Palpant, C. Artigues, and P. Michelon LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search Ann. Oper. Res. 131 1-4 2004 237 257
-
(2004)
Ann. Oper. Res.
, vol.131
, Issue.14
, pp. 237-257
-
-
Palpant, M.1
Artigues, C.2
Michelon, P.3
-
54
-
-
79951905049
-
A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem
-
S. Proon, and M. Jin A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem Nav. Res. Log. 58 2 2011 73 82
-
(2011)
Nav. Res. Log.
, vol.58
, Issue.2
, pp. 73-82
-
-
Proon, S.1
Jin, M.2
-
55
-
-
68649104753
-
Hybridizations within a graph-based hyper-heuristic framework for university timetabling problems
-
R. Qu, and E.K. Burke Hybridizations within a graph-based hyper-heuristic framework for university timetabling problems J. Oper. Res. Soc. 60 9 2009 1273 1285
-
(2009)
J. Oper. Res. Soc.
, vol.60
, Issue.9
, pp. 1273-1285
-
-
Qu, R.1
Burke, E.K.2
-
56
-
-
0000799803
-
Problem and heuristic search space strategies for job shop scheduling
-
R.H. Storer, S.D. Wu, and R. Vaccari Problem and heuristic search space strategies for job shop scheduling INFORMS J. Comput. 7 4 1995 453 467
-
(1995)
INFORMS J. Comput.
, vol.7
, Issue.4
, pp. 453-467
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
57
-
-
0037475094
-
The particle swarm optimization algorithm: Convergence analysis and parameter selection
-
I.C. Trelea The particle swarm optimization algorithm: convergence analysis and parameter selection Inf. Process. Lett. 85 6 2003 317 325
-
(2003)
Inf. Process. Lett.
, vol.85
, Issue.6
, pp. 317-325
-
-
Trelea, I.C.1
-
58
-
-
0035617605
-
A competitive heuristic solution technique for resource-constrained project scheduling
-
P. Tormos, and A. Lova A competitive heuristic solution technique for resource-constrained project scheduling Ann. Oper. Res. 102 1-4 2001 65 81
-
(2001)
Ann. Oper. Res.
, vol.102
, Issue.14
, pp. 65-81
-
-
Tormos, P.1
Lova, A.2
-
59
-
-
0242364615
-
An efficient multi-pass heuristic for project scheduling with constrained resources
-
P. Tormos, and A. Lova An efficient multi-pass heuristic for project scheduling with constrained resources Int. J. Prod. Res. 41 5 2003 1071 1086
-
(2003)
Int. J. Prod. Res.
, vol.41
, Issue.5
, pp. 1071-1086
-
-
Tormos, P.1
Lova, A.2
-
62
-
-
80255137472
-
A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
-
L. Wang, and C. Fang A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem Expert Syst. Appl. 39 3 2012 2451 2460
-
(2012)
Expert Syst. Appl.
, vol.39
, Issue.3
, pp. 2451-2460
-
-
Wang, L.1
Fang, C.2
-
63
-
-
77955559839
-
Project scheduling with finite or infinite number of activity processing modes - A survey
-
J. Weglarz, J. Jozefowska, M. Mika, and G. Waligora Project scheduling with finite or infinite number of activity processing modes - a survey Eur. J. Oper. Res. 208 3 2011 177 205
-
(2011)
Eur. J. Oper. Res.
, vol.208
, Issue.3
, pp. 177-205
-
-
Weglarz, J.1
Jozefowska, J.2
Mika, M.3
Waligora, G.4
-
64
-
-
84886726615
-
Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups
-
A.S. Xanthopoulos, D.E. Koulouriotis, V.D. Tourassis, and D.M. Emiris Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups Appl. Soft Comput. 13 12 2013 4704 4717
-
(2013)
Appl. Soft Comput.
, vol.13
, Issue.12
, pp. 4704-4717
-
-
Xanthopoulos, A.S.1
Koulouriotis, D.E.2
Tourassis, V.D.3
Emiris, D.M.4
-
65
-
-
84857790552
-
Multi-objective optimization of vehicle crashworthiness using a new particle swarm based approach
-
A.R. Yildiz, and K.N. Solanki Multi-objective optimization of vehicle crashworthiness using a new particle swarm based approach Int. J. Adv. Manuf. Technol. 59 1-4 2012 367 376
-
(2012)
Int. J. Adv. Manuf. Technol.
, vol.59
, Issue.14
, pp. 367-376
-
-
Yildiz, A.R.1
Solanki, K.N.2
-
66
-
-
59749087555
-
A novel particle swarm optimization approach for product design and manufacturing
-
A.R. Yildiz A novel particle swarm optimization approach for product design and manufacturing Int. J. Adv. Manuf. Technol. 40 5-6 2009 617 628
-
(2009)
Int. J. Adv. Manuf. Technol.
, vol.40
, Issue.56
, pp. 617-628
-
-
Yildiz, A.R.1
-
67
-
-
32944459555
-
Permutation-based particle swarm optimization for resource-constrained project scheduling
-
H. Zhang, H. Li, and C.M. Tam Permutation-based particle swarm optimization for resource-constrained project scheduling J. Comput. Civil Eng. 20 2 2006 141 149
-
(2006)
J. Comput. Civil Eng.
, vol.20
, Issue.2
, pp. 141-149
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
68
-
-
77950948337
-
Multi-objective particle swarm optimization for construction time-cost tradeoff problems
-
H. Zhang, and H. Li Multi-objective particle swarm optimization for construction time-cost tradeoff problems Constr. Manage. Econ. 28 1 2010 75 88
-
(2010)
Constr. Manage. Econ.
, vol.28
, Issue.1
, pp. 75-88
-
-
Zhang, H.1
Li, H.2
-
69
-
-
79954620287
-
On the performance of bee algorithms for resource-constrained project scheduling problem
-
K. Ziarati, R. Akbari, and V. Zeighami On the performance of bee algorithms for resource-constrained project scheduling problem Appl. Soft Comput. 11 4 2011 3720 3733
-
(2011)
Appl. Soft Comput.
, vol.11
, Issue.4
, pp. 3720-3733
-
-
Ziarati, K.1
Akbari, R.2
Zeighami, V.3
|