메뉴 건너뛰기




Volumn 11, Issue 4, 2011, Pages 3720-3733

On the performance of bee algorithms for resource-constrained project scheduling problem

Author keywords

Artificial bee colony; Bee algorithm; Bee swarm optimization; RCPSP

Indexed keywords

ARTIFICIAL BEE COLONIES; BEE ALGORITHM; BEE SWARM OPTIMIZATION; CONSTRAINT HANDLING; HONEY BEE; INITIAL POPULATION; INTELLIGENT BEHAVIOR; LOCAL SEARCH METHOD; OTHER ALGORITHMS; RCPSP; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; SEARCH SPACES; SIMULATION RESULT; SWARM OPTIMIZATION; TERMINATION CONDITION;

EID: 79954620287     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2011.02.002     Document Type: Article
Times cited : (128)

References (54)
  • 1
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: classification and complexity
    • DOI 10.1016/0166-218X(83)90012-4
    • J. Blazewicz, J.K. Lenstra, and A.H.G. Rinnooy Kan Scheduling projects to resource constraints: classification and complexity Discrete Applied Mathematics 5 1983 11 24 (Pubitemid 13554158)
    • (1981) Discrete Applied Mathematics , vol.5 , Issue.1 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 3
    • 35148821762 scopus 로고    scopus 로고
    • A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm
    • DOI 10.1007/s10898-007-9149-x
    • D. Karaboga, and B. Basturk A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm Journal of Global Optimization 39 2007 459 471 (Pubitemid 47551831)
    • (2007) Journal of Global Optimization , vol.39 , Issue.3 , pp. 459-471
    • Karaboga, D.1    Basturk, B.2
  • 8
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • S. Hartmann, and D. Ane Briskorn A survey of variants and extensions of the resource-constrained project scheduling problem European Journal of Operational Research 207 2010 1 14
    • (2010) European Journal of Operational Research , vol.207 , pp. 1-14
    • Hartmann, S.1    Ane Briskorn, D.2
  • 10
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • E. Demeulemeester, and W. Herroelen New benchmark results for the resource-constrained project scheduling problem Management Science 43 11 1997 1485 1492 (Pubitemid 127606206)
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 11
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project scheduling problem
    • PII S0377221797003354
    • P. Brucker, S. Knust, A. Schoo, and O. Thiele A branch & bound algorithm for the resource-constrained project scheduling problem European Journal of Operational Research 107 2 1998 272 288 (Pubitemid 128407543)
    • (1998) European Journal of Operational Research , vol.107 , Issue.2 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 12
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
    • A. Mingozzi, V. Maniezzo, S. Ricciardelli, and L. Bianco An exact algorithm for project scheduling with resource constraints based on new mathematical formulation Management Science 44 5 1998 714 729 (Pubitemid 128596875)
    • (1998) Management Science , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 13
    • 0038708604 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • DOI 10.1007/s001860000091
    • U. Dorndorf, E. Pesch, and T. Phan-Huy A branch-and-bound algorithm for the resource-constrained project scheduling problem Mathematical Methods of Operations Research 52 2000 413 439 (Pubitemid 33675621)
    • (2000) Mathematical Methods of Operations Research , vol.52 , Issue.3 , pp. 413-439
    • Dorndorf, U.1    Pesch, E.2    Phan-Huy, T.3
  • 14
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • A.A.B. Pritsker, L.J. Watters, and P.M. Wolfe Multiproject scheduling with limited resources: a zero-one programming approach Management Science 16 1969 93 107
    • (1969) Management Science , vol.16 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 15
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • J.H. Patterson, and W.D. Huber A horizon-varying, zero-one approach to project scheduling Management Science 20 1974 990 998
    • (1974) Management Science , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 16
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • J.H. Patterson, and G.W. Roth Scheduling a project under multiple resource constraints: a zero-one programming approach AIIE Transactions 8 1976 449 455
    • (1976) AIIE Transactions , vol.8 , pp. 449-455
    • Patterson, J.H.1    Roth, G.W.2
  • 17
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • S. Hartmann, and R. Kolisch Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem European Journal of Operational Research 127 2000 394 407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 18
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • DOI 10.1016/j.ejor.2005.01.065, PII S0377221705002596
    • R. Kolisch, and S. Hartmann Experimental investigation of heuristics for resource-constrained project scheduling: an update European Journal of Operational Research 174 2006 23 37 (Pubitemid 44866841)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 19
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • R. Kolisch, and S. Hartmann Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis J. Weglarz, Project Scheduling: Recent Models, Algorithms and Applications 1999 Kluwer Academic Publishers Berlin 147 178
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 20
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • DOI 10.1016/S0305-0483(00)00046-3, PII S0305048300000463
    • R. Kolisch, and R. Padman An integrated survey of deterministic project scheduling Omega 29 2001 249 272 (Pubitemid 33662608)
    • (2001) Omega , vol.29 , Issue.3 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 21
    • 0032117729 scopus 로고    scopus 로고
    • A Tabu Search Approach for the Resource Constrained Project Scheduling Problem
    • P.R. Thomas, and S. Salhi A tabu search approach for the resource constrained project scheduling problem Journal of Heuristics 4 1998 123 139 (Pubitemid 128514873)
    • (1998) Journal of Heuristics , vol.4 , Issue.2 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 22
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • F.F. Boctor An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems International Journal of Production Research 34 1996 2335 2351 (Pubitemid 126525300)
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.F.1
  • 23
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • S. Hartmann A competitive genetic algorithm for resource-constrained project scheduling Naval Research Logistics 45 1998 733 750 (Pubitemid 128587349)
    • (1998) Naval Research Logistics , vol.45 , Issue.7 , pp. 733-750
    • Hartmann, S.1
  • 24
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • DOI 10.1002/nav.10029
    • S. Hartmann A self-adapting genetic algorithm for project scheduling under resource constraints Naval Research Logistics 49 2002 433 448 (Pubitemid 34878877)
    • (2002) Naval Research Logistics , vol.49 , Issue.5 , pp. 433-448
    • Hartmann, S.1
  • 25
    • 44849140428 scopus 로고    scopus 로고
    • A random key based genetic algorithm for the resource constrained project scheduling problem
    • J.J.M. Mendes, J.F. Goncalves, and M.G.C. Resende A random key based genetic algorithm for the resource constrained project scheduling problem Computers and Operations Research 36 2009 92 109
    • (2009) Computers and Operations Research , vol.36 , pp. 92-109
    • Mendes, J.J.M.1    Goncalves, J.F.2    Resende, M.G.C.3
  • 26
    • 38649127603 scopus 로고    scopus 로고
    • Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
    • DOI 10.1016/j.amc.2007.07.022, PII S0096300307007412
    • M. Ranjbar, F. Kianfar, and S. Shadrokh Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm Applied Mathematics and Computation 196 2008 879 888 (Pubitemid 351174345)
    • (2008) Applied Mathematics and Computation , vol.196 , Issue.2 , pp. 879-888
    • Ranjbar, M.1    Kianfar, F.2    Shadrokh, S.3
  • 27
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • DOI 10.1109/TEVC.2002.802450, PII 1011092002802450
    • D. Merkle, M. Middendorf, and H. Schmeck Ant colony optimization for resource-constrained project scheduling IEEE Transactions on Evolutionary Computation 6 2002 333 346 (Pubitemid 35032735)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 28
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
    • B. Jarboui, N. Damak, P. Siarry, and A. Rebai A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Applied Mathematics and Computation 195 2008 299 308 (Pubitemid 350213083)
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 29
    • 34047225813 scopus 로고    scopus 로고
    • An improved PSO algorithm for resource-constrained project scheduling problem
    • DOI 10.1109/WCICA.2006.1713022, 1713022, Proceedings of the World Congress on Intelligent Control and Automation (WCICA)
    • X. Luo, D. Wang, J. Tang, and Y. Tu An improved PSO algorithm for resource constrained project scheduling problem, intelligent control and automation Sixth World Congress on WCICA 1 2006 3514 3518 (Pubitemid 46533442)
    • (2006) Proceedings of the World Congress on Intelligent Control and Automation (WCICA) , vol.1 , pp. 3514-3518
    • Luo, X.1    Wang, D.2    Tang, J.3    Tu, Y.4
  • 30
    • 52049124538 scopus 로고    scopus 로고
    • An improved particle swarm optimization algorithm for flowshop scheduling problem
    • C Zhang, J. Sun, X. Zhu, and Q. Yang An improved particle swarm optimization algorithm for flowshop scheduling problem Information Processing Letters 108 4 2008 204 209
    • (2008) Information Processing Letters , vol.108 , Issue.4 , pp. 204-209
    • Zhang, C.1    Sun, J.2    Zhu, X.3    Yang, Q.4
  • 31
    • 33748439560 scopus 로고    scopus 로고
    • A hybrid metaheuristic for the resource-constrained project scheduling problem
    • L.Y. Tseng, and S.C. Chen A hybrid metaheuristic for the resource-constrained project scheduling problem European Journal of Operational Research 175 2006 707 721
    • (2006) European Journal of Operational Research , vol.175 , pp. 707-721
    • Tseng, L.Y.1    Chen, S.C.2
  • 32
    • 73149125765 scopus 로고    scopus 로고
    • An efficient hybrid algorithm for resource-constrained project scheduling
    • W. Chen, Y.J. Shi, H.F. Teng, X.P. Lan, and L.C. Hu An efficient hybrid algorithm for resource-constrained project scheduling Information Sciences 180 2010 1031 1039
    • (2010) Information Sciences , vol.180 , pp. 1031-1039
    • Chen, W.1    Shi, Y.J.2    Teng, H.F.3    Lan, X.P.4    Hu, L.C.5
  • 33
    • 78049444992 scopus 로고    scopus 로고
    • A neurogenetic approach for the resource-constrained project scheduling problem
    • A. Agarwal, S. Colak, and S. Erenguc A neurogenetic approach for the resource-constrained project scheduling problem Computers and Operations Research 38 2011 44 50
    • (2011) Computers and Operations Research , vol.38 , pp. 44-50
    • Agarwal, A.1    Colak, S.2    Erenguc, S.3
  • 34
    • 34648837872 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the resource-constrained project scheduling problem
    • DOI 10.1016/j.ejor.2006.12.033, PII S0377221707000616
    • V. Valls, F. Ballestin, and S. Quintanilla A hybrid genetic algorithm for the resource-constrained project scheduling problem European Journal of Operational Research 185 2008 495 508 (Pubitemid 47454671)
    • (2008) European Journal of Operational Research , vol.185 , Issue.2 , pp. 495-508
    • Valls, V.1    Ballestin, F.2    Quintanilla, S.3
  • 37
    • 26444559584 scopus 로고    scopus 로고
    • Engineering optimizations via nature-inspired virtual bee algorithms
    • Springer (GmbH)
    • X.S. Yang Engineering optimizations via nature-inspired virtual bee algorithms Lecture Notes in Computer Science 2005 Springer (GmbH) pp. 317-323
    • (2005) Lecture Notes in Computer Science
    • Yang, X.S.1
  • 40
    • 13244273704 scopus 로고    scopus 로고
    • Particle swarm optimization-based schemes for resource-constrained project scheduling
    • DOI 10.1016/j.autcon.2004.08.006, PII S0926580504001128, International Conference for Construction Information Technology
    • H. Zhang, X. Li, H. Li, and F. Huang Particle swarm optimization-based schemes for resource-constrained project scheduling Journal of Automation in Construction 14 2005 393 404 (Pubitemid 40183430)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 393-404
    • Zhang, H.1    Li, X.2    Li, H.3    Huang, F.4
  • 41
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • K. Bouleimen, and H. Lecocq A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version European Journal of Operational Research 149 2003 268 281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 42
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • S. Hartmann A competitive genetic algorithm for resource-constrained project scheduling Naval Research Logistics 45 1998 279 302
    • (1998) Naval Research Logistics , vol.45 , pp. 279-302
    • Hartmann, S.1
  • 43
    • 79954577568 scopus 로고    scopus 로고
    • Case-based Reasoning and Parameterized Random Sampling for Project Scheduling
    • University of Kiel, Germany
    • A. Schirmer, S. Riesenberg, Case-based Reasoning and Parameterized Random Sampling for Project Scheduling, Technical Report, University of Kiel, Germany, 1998.
    • (1998) Technical Report
    • Schirmer, A.1    Riesenberg, S.2
  • 45
    • 0001896880 scopus 로고    scopus 로고
    • Adaptative search for solving hard project scheduling problems
    • R. Kolisch, and A. Drexl Adaptative search for solving hard project scheduling problems Naval Research Logistics 43 1996 23 43
    • (1996) Naval Research Logistics , vol.43 , pp. 23-43
    • Kolisch, R.1    Drexl, A.2
  • 46
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolisch Serial and parallel resource-constrained project scheduling methods revisite: theory and computation European Journal of Operational Research 90 1996 320 333 (Pubitemid 126652217)
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 320-333
    • Kolisch, R.1
  • 48
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • DOI 10.1016/0272-6963(95)00032-1
    • R. Kolisch Efficient priority rules for the resource-constrained project scheduling problem Journal of Operations Management 14 1996 179 192 (Pubitemid 126365433)
    • (1996) Journal of Operations Management , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 49
    • 33845274958 scopus 로고
    • Strength and adaptability of problem-space based neighborhoods for resource constrained scheduling
    • V.J. Leon, and B. Ramamoorthy Strength and adaptability of problem-space based neighborhoods for resource constrained scheduling Operations Research Spektrum 17 1995 173 182
    • (1995) Operations Research Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Ramamoorthy, B.2
  • 51
    • 24944527635 scopus 로고    scopus 로고
    • Integrating Heuristics for Resource Constrained Project Scheduling: One Step Forward
    • Department of Statistics and Operations Research, Universidad Politecnica de Valencia
    • P. Tormos, A. Lova, Integrating Heuristics for Resource Constrained Project Scheduling: One Step Forward, Technical Report, Department of Statistics and Operations Research, Universidad Politecnica de Valencia, 2003.
    • (2003) Technical Report
    • Tormos, P.1    Lova, A.2
  • 52
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • K. Nonobe, and T. Ibaraki Formulation and tabu search algorithm for the resource constrained project scheduling problem C.C. Ribeiro, P. Hansen, Essays and Surveys in Metaheuristics 2002 Kluwer Academic Publishers Dordrecht 557 588
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.