메뉴 건너뛰기




Volumn 138, Issue 7, 2012, Pages 854-863

Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm

Author keywords

Construction management; Optimization; Resource allocation; Resource leveling; Scheduling

Indexed keywords

OPTIMIZATION; RESOURCE ALLOCATION;

EID: 84869080389     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000492     Document Type: Article
Times cited : (36)

References (47)
  • 2
    • 77950952082 scopus 로고    scopus 로고
    • A simulated annealing hyperheuristic for construction resource levelling
    • Anagnostopoulos, K. P., and Koulinas, G. K. (2010). "A simulated annealing hyperheuristic for construction resource levelling." Constr. Manage. Econ, 28(2), 163-175.
    • (2010) Constr. Manage. Econ , vol.28 , Issue.2 , pp. 163-175
    • Anagnostopoulos, K.P.1    Koulinas, G.K.2
  • 3
    • 84859559015 scopus 로고    scopus 로고
    • Resource-constrained critical path scheduling by a GRASP based hyperheuristic
    • (none) (Mar. 12, 2011)
    • Anagnostopoulos, K., and Koulinas, G. (2011). "Resource-constrained critical path scheduling by a GRASP based hyperheuristic." J. Comput. Civ. Eng., xxx(none), xxx-xxx. 10.1061/(ASCE)CP1943-5487.0000116 (Mar. 12, 2011).
    • (2011) J. Comput. Civ. Eng. , vol.30 , pp. xxx
    • Anagnostopoulos, K.1    Koulinas, G.2
  • 4
    • 0028518189 scopus 로고
    • Optimal resource leveling using non-serial dynamic programming
    • Bandelloni, M., Tucci, M., and Rinaldi, R. (1994). "Optimal resource leveling using non-serial dynamic programming." Eur. J. Oper. Res., 78(2), 162-177.
    • (1994) Eur. J. Oper. Res. , vol.78 , Issue.2 , pp. 162-177
    • Bandelloni, M.1    Tucci, M.2    Rinaldi, R.3
  • 5
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor, F. F. (1990). "Some efficient multi-heuristic procedures for resource-constrained project scheduling." Eur. J. Oper. Res., 49(1), 3-13.
    • (1990) Eur. J. Oper. Res. , vol.49 , Issue.1 , pp. 3-13
    • Boctor, F.F.1
  • 6
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor, F. F. (1996). "Resource-constrained project scheduling by simulated annealing." Int. J. Prod. Res., 34(8), 2335-2351.
    • (1996) Int. J. Prod. Res. , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.F.1
  • 7
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen, K., and Lecocq, H. (2003). "A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version." Eur. J. Oper. Res., 149(2), 268-281.
    • (2003) Eur. J. Oper. Res. , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 8
    • 0032096810 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource constrained project scheduling problem
    • Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). "A branch-and-bound algorithm for the resource constrained project scheduling problem." Eur. J. Oper. Res., 107(2), 272-288.
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.2 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 9
    • 0002679297 scopus 로고
    • Variation in activity level on a cyclic arrow diagram
    • Burgess, A. R., and Killebrew, J. B. (1962). "Variation in activity level on a cyclic arrow diagram." Ind. Eng., 13(2), 76-83.
    • (1962) Ind. Eng. , vol.13 , Issue.2 , pp. 76-83
    • Burgess, A.R.1    Killebrew, J.B.2
  • 10
    • 3042708858 scopus 로고    scopus 로고
    • Hyperheuristics: An emerging direction in modern search technology
    • F. Glover and G A. Kochenberger, eds., Kluwer Academic Publishers, Dordrecht
    • Burke, E., Kendall, G, Newall, J., Hart, E., Ross, P., and Schulenburg, S. (2003a). "Hyperheuristics: An emerging direction in modern search technology." Handbook of Metaheuristics, F. Glover and G A. Kochenberger, eds., Kluwer Academic Publishers, Dordrecht, 457-74.
    • (2003) Handbook of Metaheuristics , pp. 457-474
    • Burke, E.1    Kendall, G.2    Newall, J.3    Hart, E.4    Ross, P.5    Schulenburg, S.6
  • 11
    • 1442283467 scopus 로고    scopus 로고
    • A tabu Search hyperheuristic for timetabling and rostering
    • Burke, E., Kendall, G, and Soubeiga, E. (2003b). "A tabu search hyperheuristic for timetabling and rostering." J. Heuristics, 9(6), 451-70.
    • (2003) J. Heuristics , vol.9 , Issue.6 , pp. 451-470
    • Burke, E.1    Kendall, G.2    Soubeiga, E.3
  • 12
    • 27144531258 scopus 로고    scopus 로고
    • An ant algorithm hyperheuristic for the project presentation scheduling problem
    • IEEE Computer Society Press, Edinburgh, Scotland
    • Burke, E. K, Kendall, G, Landa-Silva, D., O'Brien, R., and Soubeiga, E. (2005). "An ant algorithm hyperheuristic for the project presentation scheduling problem." Proc, 2005 IEEE Congr. on Evol. Comput. (CEC 2005), IEEE Computer Society Press, Edinburgh, Scotland, 2263-2270.
    • (2005) Proc, 2005 IEEE Congr. On Evol. Comput. (CEC 2005) , pp. 2263-2270
    • Burke, E.K.1    Kendall, G.2    Landa-Silva, D.3    O'Brien, R.4    Soubeiga, E.5
  • 14
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • Chan, W., Chua, D. K. H, and Kannan, G (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.1    Chua, D.K.H.2    Kannan, G.3
  • 15
    • 73349109790 scopus 로고    scopus 로고
    • Scheduling resource-constrained projects with ant colony optimization artificial agents
    • Christodoulou, S. (2010). "Scheduling resource-constrained projects with ant colony optimization artificial agents." J. Comput. Civ. Eng., 24(1), 45-55.
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 45-55
    • Christodoulou, S.1
  • 17
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E., and Herroelen, W. (1992). "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem." Manage. Sci., 38(12), 1803-1818.
    • (1992) Manage. Sci. , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 19
    • 0029215084 scopus 로고
    • Evolution based learning in a job shop scheduling environment
    • Dorndorf, U., and Pesch, E. (1995). "Evolution based learning in a job shop scheduling environment." Comput. Oper. Res., 22(1), 25-40.
    • (1995) Comput. Oper. Res. , vol.22 , Issue.1 , pp. 25-40
    • Dorndorf, U.1    Pesch, E.2
  • 20
    • 33845941176 scopus 로고    scopus 로고
    • A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation
    • Dowsland, K A., Soubeiga, E., and Burke, E. (2007). "A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation." Eur. J. Oper. Res., 179(3), 759-774.
    • (2007) Eur. J. Oper. Res. , vol.179 , Issue.3 , pp. 759-774
    • Dowsland, K.A.1    Soubeiga, E.2    Burke, E.3
  • 21
    • 25144482720 scopus 로고
    • Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing
    • Dueck, G (1990). "Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing." J. Comput. Phys., 90(1), 161-175.
    • (1990) J. Comput. Phys. , vol.90 , Issue.1 , pp. 161-175
    • Dueck, G.1
  • 22
    • 0001195356 scopus 로고
    • Resource leveling in construction by optimization
    • Easa, S. M. (1989). "Resource leveling in construction by optimization." J. Constr. Eng. Manage., 115(2), 302-316.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.2 , pp. 302-316
    • Easa, S.M.1
  • 23
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local job shop scheduling rules
    • J. F. Muth and G L. Thompson, eds, Prentice Hall, Englewood Cliffs
    • Fisher, H, and Thompson, G L. (1963). "Probabilistic learning combinations of local job shop scheduling rules." Industrial Scheduling, J. F. Muth and G L. Thompson, eds, Prentice Hall, Englewood Cliffs, 225-251.
    • (1963) Industrial Scheduling , pp. 225-251
    • Fisher, H.1    Thompson, G.L.2
  • 24
    • 0001424551 scopus 로고
    • Algorithms for multi-resource generalized assignment problem
    • Gavish, B., and Pirkul, H. (1991). "Algorithms for multi-resource generalized assignment problem." Manage. Sci. J., 37(6), 695-713.
    • (1991) Manage. Sci. J. , vol.37 , Issue.6 , pp. 695-713
    • Gavish, B.1    Pirkul, H.2
  • 25
    • 11244351342 scopus 로고    scopus 로고
    • An investigation of a tabu assisted hyperheuristic genetic algorithm
    • IEEE Computer Society Press, Canberra, Australia
    • Han, L., and Kendall, G (2003). "An investigation of a tabu assisted hyperheuristic genetic algorithm." Proc, 2003 IEEE Congr. on Evol. Comput. (CEC 2003), IEEE Computer Society Press, Canberra, Australia, 2230-2237.
    • (2003) Proc, 2003 IEEE Congr. On Evol. Comput. (CEC 2003) , pp. 2230-2237
    • Han, L.1    Kendall, G.2
  • 26
    • 0025444361 scopus 로고
    • Packing method for resource leveling (PACK)
    • Harris, R. B. (1990). "Packing method for resource leveling (PACK)." J. Constr. Eng. Manage., 116(2), 331-350.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.2 , pp. 331-350
    • Harris, R.B.1
  • 27
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann, S. (1998). "A competitive genetic algorithm for resource-constrained project scheduling." Nav. Res. Logist. Q., 45(7), 733-750.
    • (1998) Nav. Res. Logist. Q. , vol.45 , Issue.7 , pp. 733-750
    • Hartmann, S.1
  • 28
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource constrained project scheduling problem
    • Hartmann, S., and Briskorn, D. (2010). "A survey of variants and extensions of the resource constrained project scheduling problem." Eur. J. Oper. Res., 207(1), 1-14.
    • (2010) Eur. J. Oper. Res. , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 29
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., 125(3), 167-175.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 30
    • 0034227663 scopus 로고    scopus 로고
    • Modification of minimum moment approach in resource leveling
    • Hiyassat, M. A. S. (2000). "Modification of minimum moment approach in resource leveling." J. Constr. Eng. Manage., 126(4), 278-284.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 278-284
    • Hiyassat, M.A.S.1
  • 31
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch, R. (1996). "Efficient priority rules for the resource-constrained project scheduling problem." J. Oper. Manage., 14(3), 179-192.
    • (1996) J. Oper. Manage. , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 32
    • 0034324916 scopus 로고    scopus 로고
    • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    • Leu, S. S., Yang, C. H, and Huang, J. C. (2000). "Resource leveling in construction by genetic algorithm-based optimization and its decision support system application." Autom. Constr., 10(1), 27-41.
    • (2000) Autom. Constr. , vol.10 , Issue.1 , pp. 27-41
    • Leu, S.S.1    Yang, C.H.2    Huang, J.C.3
  • 33
    • 58949096631 scopus 로고    scopus 로고
    • An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    • Lova, A., Tormos, P., Cervantes, M., and Barber, F. (2009). "An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes." Int. J. Prod. Econ., 117(2), 302-316.
    • (2009) Int. J. Prod. Econ. , vol.117 , Issue.2 , pp. 302-316
    • Lova, A.1    Tormos, P.2    Cervantes, M.3    Barber, F.4
  • 35
    • 0032657381 scopus 로고    scopus 로고
    • Resource leveling for projects with schedule-dependent time windows
    • Neumann, K., and Zimmermann, J. (1999). "Resource leveling for projects with schedule-dependent time windows." Eur. J. Oper. Res., 117(3), 591-605.
    • (1999) Eur. J. Oper. Res. , vol.117 , Issue.3 , pp. 591-605
    • Neumann, K.1    Zimmermann, J.2
  • 36
    • 0034559447 scopus 로고    scopus 로고
    • Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
    • Neumann, K., and Zimmermann, J. (2000). "Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints." Eur. J. Oper. Res., 127(2), 425-443.
    • (2000) Eur. J. Oper. Res. , vol.127 , Issue.2 , pp. 425-443
    • Neumann, K.1    Zimmermann, J.2
  • 37
    • 0038527513 scopus 로고    scopus 로고
    • Formulation and tabu Search algorithm for the resource constrained project scheduling problem
    • C. C. Ribeiro and P. Hansen, eds., Kluwer Academic Publishers, Dordrecht
    • Nonobe, K., and Ibaraki, T. (2001). "Formulation and tabu search algorithm for the resource constrained project scheduling problem." Essays and Surveys in Metaheuristics, C. C. Ribeiro and P. Hansen, eds., Kluwer Academic Publishers, Dordrecht, 557-588.
    • (2001) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 38
    • 78049530134 scopus 로고    scopus 로고
    • A cooperative hyperheuristic search framework
    • Ouelhadj, D., and Petrovic, S. (2010). "A cooperative hyperheuristic search framework." J. Heuristics, 16(6), 835-857.
    • (2010) J. Heuristics , vol.16 , Issue.6 , pp. 835-857
    • Ouelhadj, D.1    Petrovic, S.2
  • 39
    • 52949090841 scopus 로고    scopus 로고
    • A study of project scheduling optimization using tabu Search algorithm
    • Pan, N. H, Hsaio, P. W., and Chen, K. Y (2008). "A study of project scheduling optimization using Tabu Search algorithm." Eng. Appl. Artif. Intell, 21(7), 1101-1112.
    • (2008) Eng. Appl. Artif. Intell , vol.21 , Issue.7 , pp. 1101-1112
    • Pan, N.H.1    Hsaio, P.W.2    Chen, K.Y.3
  • 40
    • 68649104753 scopus 로고    scopus 로고
    • Hybridizations within a graph-based hyperheuristic framework for univ. Timetabling problems
    • Qu, R., and Burke, E. K. (2009). "Hybridizations within a graph-based hyperheuristic framework for univ. timetabling problems." J. Oper. Res. Soc, 60(9), 1273-1285.
    • (2009) J. Oper. Res. Soc , vol.60 , Issue.9 , pp. 1273-1285
    • Qu, R.1    Burke, E.K.2
  • 41
    • 0030216667 scopus 로고    scopus 로고
    • Construction resource leveling using neural networks
    • Savin, D., Alkass, S., and Fazio, P. (1996). "Construction resource leveling using neural networks." Can. J. Civ. Eng., 23(4), 917-925.
    • (1996) Can. J. Civ. Eng. , vol.23 , Issue.4 , pp. 917-925
    • Savin, D.1    Alkass, S.2    Fazio, P.3
  • 42
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • Senouci, A. B., and Eldin, N. N. (2004). "Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 130(6), 869-877.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 43
    • 0000799803 scopus 로고
    • Problem and heuristic search space strategies for job shop scheduling
    • Storer, R. H, Wu, S. D., and Vaccari, R. (1995). "Problem and heuristic search space strategies for job shop scheduling." ORSA J. Comput., 7(4), 453-467.
    • (1995) ORSA J. Comput. , vol.7 , Issue.4 , pp. 453-467
    • Storer, R.H.1    Wu, S.D.2    Vaccari, R.3
  • 44
    • 77955559839 scopus 로고    scopus 로고
    • Project scheduling with finite or infinite number of activity processing modes - A survey
    • Weglarz, J., Jozefowska, J., Mika, M., and Waligora, G. (2011). "Project scheduling with finite or infinite number of activity processing modes - A survey." Eur. J. Oper. Res., 208(3), 177-205.
    • (2011) Eur. J. Oper. Res. , vol.208 , Issue.3 , pp. 177-205
    • Weglarz, J.1    Jozefowska, J.2    Mika, M.3    Waligora, G.4
  • 45
    • 34548266359 scopus 로고    scopus 로고
    • The threshold accepting optimization algorithm in economics and statistics
    • E. J. Kontoghiorghes and C. Gatu, eds., Springer, Berlin
    • Winker, P., and Maringer, D. (2007). "The threshold accepting optimization algorithm in economics and statistics." Optimization, Econometric and Financial Analysis, E. J. Kontoghiorghes and C. Gatu, eds., Springer, Berlin, 107-125.
    • (2007) Optimization, Econometric and Financial Analysis , pp. 107-125
    • Winker, P.1    Maringer, D.2
  • 46
    • 32944459555 scopus 로고    scopus 로고
    • Permutation-based particle swarm optimization for resource-constrained project scheduling
    • Zhang, H, Li, H, and Tam, C. M. (2006a). "Permutation-based particle swarm optimization for resource-constrained project scheduling." J. Comput. Civ. Eng., 20(2), 141-149.
    • (2006) J. Comput. Civ. Eng. , vol.20 , Issue.2 , pp. 141-149
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 47
    • 32944474678 scopus 로고    scopus 로고
    • Particle swarm optimization for preemptive scheduling under break and resource-constraints
    • Zhang, H, Li, H., and Tam, C. M. (2006b). "Particle swarm optimization for preemptive scheduling under break and resource-constraints." J. Constr. Eng. Manage., 132(3), 259-267.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.3 , pp. 259-267
    • Zhang, H.1    Li, H.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.