A simulated annealing hyperheuristic for construction resource levelling
-
Anagnostopoulos, K. P., and Koulinas, G. K. (2010). "A simulated annealing hyperheuristic for construction resource levelling." Constr. Manage. Econ, 28(2), 163-175.
-
(2010)
Constr. Manage. Econ
, vol.28
, Issue.2
, pp. 163-175
-
-
Anagnostopoulos, K.P.1
Koulinas, G.K.2
-
3
-
-
84859559015
-
Resource-constrained critical path scheduling by a GRASP based hyperheuristic
-
(none) (Mar. 12, 2011)
-
Anagnostopoulos, K., and Koulinas, G. (2011). "Resource-constrained critical path scheduling by a GRASP based hyperheuristic." J. Comput. Civ. Eng., xxx(none), xxx-xxx. 10.1061/(ASCE)CP1943-5487.0000116 (Mar. 12, 2011).
-
(2011)
J. Comput. Civ. Eng.
, vol.30
, pp. xxx
-
-
Anagnostopoulos, K.1
Koulinas, G.2
-
4
-
-
0028518189
-
Optimal resource leveling using non-serial dynamic programming
-
Bandelloni, M., Tucci, M., and Rinaldi, R. (1994). "Optimal resource leveling using non-serial dynamic programming." Eur. J. Oper. Res., 78(2), 162-177.
-
(1994)
Eur. J. Oper. Res.
, vol.78
, Issue.2
, pp. 162-177
-
-
Bandelloni, M.1
Tucci, M.2
Rinaldi, R.3
-
5
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F. F. (1990). "Some efficient multi-heuristic procedures for resource-constrained project scheduling." Eur. J. Oper. Res., 49(1), 3-13.
-
(1990)
Eur. J. Oper. Res.
, vol.49
, Issue.1
, pp. 3-13
-
-
Boctor, F.F.1
-
6
-
-
0030216966
-
Resource-constrained project scheduling by simulated annealing
-
Boctor, F. F. (1996). "Resource-constrained project scheduling by simulated annealing." Int. J. Prod. Res., 34(8), 2335-2351.
-
(1996)
Int. J. Prod. Res.
, vol.34
, Issue.8
, pp. 2335-2351
-
-
Boctor, F.F.1
-
7
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
-
Bouleimen, K., and Lecocq, H. (2003). "A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version." Eur. J. Oper. Res., 149(2), 268-281.
-
(2003)
Eur. J. Oper. Res.
, vol.149
, Issue.2
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
8
-
-
0032096810
-
A branch-and-bound algorithm for the resource constrained project scheduling problem
-
Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). "A branch-and-bound algorithm for the resource constrained project scheduling problem." Eur. J. Oper. Res., 107(2), 272-288.
-
(1998)
Eur. J. Oper. Res.
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
9
-
-
0002679297
-
Variation in activity level on a cyclic arrow diagram
-
Burgess, A. R., and Killebrew, J. B. (1962). "Variation in activity level on a cyclic arrow diagram." Ind. Eng., 13(2), 76-83.
-
(1962)
Ind. Eng.
, vol.13
, Issue.2
, pp. 76-83
-
-
Burgess, A.R.1
Killebrew, J.B.2
-
10
-
-
3042708858
-
Hyperheuristics: An emerging direction in modern search technology
-
F. Glover and G A. Kochenberger, eds., Kluwer Academic Publishers, Dordrecht
-
Burke, E., Kendall, G, Newall, J., Hart, E., Ross, P., and Schulenburg, S. (2003a). "Hyperheuristics: An emerging direction in modern search technology." Handbook of Metaheuristics, F. Glover and G A. Kochenberger, eds., Kluwer Academic Publishers, Dordrecht, 457-74.
-
(2003)
Handbook of Metaheuristics
, pp. 457-474
-
-
Burke, E.1
Kendall, G.2
Newall, J.3
Hart, E.4
Ross, P.5
Schulenburg, S.6
-
11
-
-
1442283467
-
A tabu Search hyperheuristic for timetabling and rostering
-
Burke, E., Kendall, G, and Soubeiga, E. (2003b). "A tabu search hyperheuristic for timetabling and rostering." J. Heuristics, 9(6), 451-70.
-
(2003)
J. Heuristics
, vol.9
, Issue.6
, pp. 451-470
-
-
Burke, E.1
Kendall, G.2
Soubeiga, E.3
-
12
-
-
27144531258
-
An ant algorithm hyperheuristic for the project presentation scheduling problem
-
IEEE Computer Society Press, Edinburgh, Scotland
-
Burke, E. K, Kendall, G, Landa-Silva, D., O'Brien, R., and Soubeiga, E. (2005). "An ant algorithm hyperheuristic for the project presentation scheduling problem." Proc, 2005 IEEE Congr. on Evol. Comput. (CEC 2005), IEEE Computer Society Press, Edinburgh, Scotland, 2263-2270.
-
(2005)
Proc, 2005 IEEE Congr. On Evol. Comput. (CEC 2005)
, pp. 2263-2270
-
-
Burke, E.K.1
Kendall, G.2
Landa-Silva, D.3
O'Brien, R.4
Soubeiga, E.5
-
13
-
-
45949085601
-
Hyperheuristics: Recent developments
-
C. Cotta, M. Sevaux and K. Sorensen, eds. Springer, Berlin
-
Chakhlevitch, K, and Cowling, P. (2008). "Hyperheuristics: Recent developments." Adaptive and Multilevel Metaheuristics, Studies in Computational Intelligence, C. Cotta, M. Sevaux and K. Sorensen, eds., Vol. 136, Springer, Berlin, 3-29.
-
(2008)
Adaptive and Multilevel Metaheuristics, Studies in Computational Intelligence
, vol.136
, pp. 3-29
-
-
Chakhlevitch, K.1
Cowling, P.2
-
14
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W., Chua, D. K. H, and Kannan, G (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.1
Chua, D.K.H.2
Kannan, G.3
-
15
-
-
73349109790
-
Scheduling resource-constrained projects with ant colony optimization artificial agents
-
Christodoulou, S. (2010). "Scheduling resource-constrained projects with ant colony optimization artificial agents." J. Comput. Civ. Eng., 24(1), 45-55.
-
(2010)
J. Comput. Civ. Eng.
, vol.24
, Issue.1
, pp. 45-55
-
-
Christodoulou, S.1
-
16
-
-
84889585310
-
A hyperheuristic approach to scheduling a sales summit
-
E. Burke and W. Erben, eds. Springer, Heidelberg
-
Cowling, P., Kendall, G, and Soubeiga, E. (2001). "A hyperheuristic approach to scheduling a sales summit." Practice and Theory of Automated Timetabling III, Lecture Notes in Computer Science, E. Burke and W. Erben, eds., Vol. 2079, Springer, Heidelberg, 176-190.
-
(2001)
Practice and Theory of Automated Timetabling III, Lecture Notes in Computer Science
, vol.2079
, pp. 176-190
-
-
Cowling, P.1
Kendall, G.2
Soubeiga, E.3
-
17
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E., and Herroelen, W. (1992). "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem." Manage. Sci., 38(12), 1803-1818.
-
(1992)
Manage. Sci.
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
19
-
-
0029215084
-
Evolution based learning in a job shop scheduling environment
-
Dorndorf, U., and Pesch, E. (1995). "Evolution based learning in a job shop scheduling environment." Comput. Oper. Res., 22(1), 25-40.
-
(1995)
Comput. Oper. Res.
, vol.22
, Issue.1
, pp. 25-40
-
-
Dorndorf, U.1
Pesch, E.2
-
20
-
-
33845941176
-
A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation
-
Dowsland, K A., Soubeiga, E., and Burke, E. (2007). "A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation." Eur. J. Oper. Res., 179(3), 759-774.
-
(2007)
Eur. J. Oper. Res.
, vol.179
, Issue.3
, pp. 759-774
-
-
Dowsland, K.A.1
Soubeiga, E.2
Burke, E.3
-
21
-
-
25144482720
-
Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing
-
Dueck, G (1990). "Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing." J. Comput. Phys., 90(1), 161-175.
-
(1990)
J. Comput. Phys.
, vol.90
, Issue.1
, pp. 161-175
-
-
Dueck, G.1
-
22
-
-
0001195356
-
Resource leveling in construction by optimization
-
Easa, S. M. (1989). "Resource leveling in construction by optimization." J. Constr. Eng. Manage., 115(2), 302-316.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.2
, pp. 302-316
-
-
Easa, S.M.1
-
23
-
-
0001947856
-
Probabilistic learning combinations of local job shop scheduling rules
-
J. F. Muth and G L. Thompson, eds, Prentice Hall, Englewood Cliffs
-
Fisher, H, and Thompson, G L. (1963). "Probabilistic learning combinations of local job shop scheduling rules." Industrial Scheduling, J. F. Muth and G L. Thompson, eds, Prentice Hall, Englewood Cliffs, 225-251.
-
(1963)
Industrial Scheduling
, pp. 225-251
-
-
Fisher, H.1
Thompson, G.L.2
-
24
-
-
0001424551
-
Algorithms for multi-resource generalized assignment problem
-
Gavish, B., and Pirkul, H. (1991). "Algorithms for multi-resource generalized assignment problem." Manage. Sci. J., 37(6), 695-713.
-
(1991)
Manage. Sci. J.
, vol.37
, Issue.6
, pp. 695-713
-
-
Gavish, B.1
Pirkul, H.2
-
25
-
-
11244351342
-
An investigation of a tabu assisted hyperheuristic genetic algorithm
-
IEEE Computer Society Press, Canberra, Australia
-
Han, L., and Kendall, G (2003). "An investigation of a tabu assisted hyperheuristic genetic algorithm." Proc, 2003 IEEE Congr. on Evol. Comput. (CEC 2003), IEEE Computer Society Press, Canberra, Australia, 2230-2237.
-
(2003)
Proc, 2003 IEEE Congr. On Evol. Comput. (CEC 2003)
, pp. 2230-2237
-
-
Han, L.1
Kendall, G.2
-
26
-
-
0025444361
-
Packing method for resource leveling (PACK)
-
Harris, R. B. (1990). "Packing method for resource leveling (PACK)." J. Constr. Eng. Manage., 116(2), 331-350.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 331-350
-
-
Harris, R.B.1
-
27
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann, S. (1998). "A competitive genetic algorithm for resource-constrained project scheduling." Nav. Res. Logist. Q., 45(7), 733-750.
-
(1998)
Nav. Res. Logist. Q.
, vol.45
, Issue.7
, pp. 733-750
-
-
Hartmann, S.1
-
28
-
-
77953872383
-
A survey of variants and extensions of the resource constrained project scheduling problem
-
Hartmann, S., and Briskorn, D. (2010). "A survey of variants and extensions of the resource constrained project scheduling problem." Eur. J. Oper. Res., 207(1), 1-14.
-
(2010)
Eur. J. Oper. Res.
, vol.207
, Issue.1
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
29
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
30
-
-
0034227663
-
Modification of minimum moment approach in resource leveling
-
Hiyassat, M. A. S. (2000). "Modification of minimum moment approach in resource leveling." J. Constr. Eng. Manage., 126(4), 278-284.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 278-284
-
-
Hiyassat, M.A.S.1
-
31
-
-
0030231487
-
Efficient priority rules for the resource-constrained project scheduling problem
-
Kolisch, R. (1996). "Efficient priority rules for the resource-constrained project scheduling problem." J. Oper. Manage., 14(3), 179-192.
-
(1996)
J. Oper. Manage.
, vol.14
, Issue.3
, pp. 179-192
-
-
Kolisch, R.1
-
32
-
-
0034324916
-
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
-
Leu, S. S., Yang, C. H, and Huang, J. C. (2000). "Resource leveling in construction by genetic algorithm-based optimization and its decision support system application." Autom. Constr., 10(1), 27-41.
-
(2000)
Autom. Constr.
, vol.10
, Issue.1
, pp. 27-41
-
-
Leu, S.S.1
Yang, C.H.2
Huang, J.C.3
-
33
-
-
58949096631
-
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
-
Lova, A., Tormos, P., Cervantes, M., and Barber, F. (2009). "An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes." Int. J. Prod. Econ., 117(2), 302-316.
-
(2009)
Int. J. Prod. Econ.
, vol.117
, Issue.2
, pp. 302-316
-
-
Lova, A.1
Tormos, P.2
Cervantes, M.3
Barber, F.4
-
35
-
-
0032657381
-
Resource leveling for projects with schedule-dependent time windows
-
Neumann, K., and Zimmermann, J. (1999). "Resource leveling for projects with schedule-dependent time windows." Eur. J. Oper. Res., 117(3), 591-605.
-
(1999)
Eur. J. Oper. Res.
, vol.117
, Issue.3
, pp. 591-605
-
-
Neumann, K.1
Zimmermann, J.2
-
36
-
-
0034559447
-
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
-
Neumann, K., and Zimmermann, J. (2000). "Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints." Eur. J. Oper. Res., 127(2), 425-443.
-
(2000)
Eur. J. Oper. Res.
, vol.127
, Issue.2
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
37
-
-
0038527513
-
Formulation and tabu Search algorithm for the resource constrained project scheduling problem
-
C. C. Ribeiro and P. Hansen, eds., Kluwer Academic Publishers, Dordrecht
-
Nonobe, K., and Ibaraki, T. (2001). "Formulation and tabu search algorithm for the resource constrained project scheduling problem." Essays and Surveys in Metaheuristics, C. C. Ribeiro and P. Hansen, eds., Kluwer Academic Publishers, Dordrecht, 557-588.
-
(2001)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
38
-
-
78049530134
-
A cooperative hyperheuristic search framework
-
Ouelhadj, D., and Petrovic, S. (2010). "A cooperative hyperheuristic search framework." J. Heuristics, 16(6), 835-857.
-
(2010)
J. Heuristics
, vol.16
, Issue.6
, pp. 835-857
-
-
Ouelhadj, D.1
Petrovic, S.2
-
39
-
-
52949090841
-
A study of project scheduling optimization using tabu Search algorithm
-
Pan, N. H, Hsaio, P. W., and Chen, K. Y (2008). "A study of project scheduling optimization using Tabu Search algorithm." Eng. Appl. Artif. Intell, 21(7), 1101-1112.
-
(2008)
Eng. Appl. Artif. Intell
, vol.21
, Issue.7
, pp. 1101-1112
-
-
Pan, N.H.1
Hsaio, P.W.2
Chen, K.Y.3
-
40
-
-
68649104753
-
Hybridizations within a graph-based hyperheuristic framework for univ. Timetabling problems
-
Qu, R., and Burke, E. K. (2009). "Hybridizations within a graph-based hyperheuristic framework for univ. timetabling problems." J. Oper. Res. Soc, 60(9), 1273-1285.
-
(2009)
J. Oper. Res. Soc
, vol.60
, Issue.9
, pp. 1273-1285
-
-
Qu, R.1
Burke, E.K.2
-
41
-
-
0030216667
-
Construction resource leveling using neural networks
-
Savin, D., Alkass, S., and Fazio, P. (1996). "Construction resource leveling using neural networks." Can. J. Civ. Eng., 23(4), 917-925.
-
(1996)
Can. J. Civ. Eng.
, vol.23
, Issue.4
, pp. 917-925
-
-
Savin, D.1
Alkass, S.2
Fazio, P.3
-
42
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
Senouci, A. B., and Eldin, N. N. (2004). "Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 130(6), 869-877.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
43
-
-
0000799803
-
Problem and heuristic search space strategies for job shop scheduling
-
Storer, R. H, Wu, S. D., and Vaccari, R. (1995). "Problem and heuristic search space strategies for job shop scheduling." ORSA J. Comput., 7(4), 453-467.
-
(1995)
ORSA J. Comput.
, vol.7
, Issue.4
, pp. 453-467
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
44
-
-
77955559839
-
Project scheduling with finite or infinite number of activity processing modes - A survey
-
Weglarz, J., Jozefowska, J., Mika, M., and Waligora, G. (2011). "Project scheduling with finite or infinite number of activity processing modes - A survey." Eur. J. Oper. Res., 208(3), 177-205.
-
(2011)
Eur. J. Oper. Res.
, vol.208
, Issue.3
, pp. 177-205
-
-
Weglarz, J.1
Jozefowska, J.2
Mika, M.3
Waligora, G.4
-
45
-
-
34548266359
-
The threshold accepting optimization algorithm in economics and statistics
-
E. J. Kontoghiorghes and C. Gatu, eds., Springer, Berlin
-
Winker, P., and Maringer, D. (2007). "The threshold accepting optimization algorithm in economics and statistics." Optimization, Econometric and Financial Analysis, E. J. Kontoghiorghes and C. Gatu, eds., Springer, Berlin, 107-125.
-
(2007)
Optimization, Econometric and Financial Analysis
, pp. 107-125
-
-
Winker, P.1
Maringer, D.2
-
46
-
-
32944459555
-
Permutation-based particle swarm optimization for resource-constrained project scheduling
-
Zhang, H, Li, H, and Tam, C. M. (2006a). "Permutation-based particle swarm optimization for resource-constrained project scheduling." J. Comput. Civ. Eng., 20(2), 141-149.
-
(2006)
J. Comput. Civ. Eng.
, vol.20
, Issue.2
, pp. 141-149
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
47
-
-
32944474678
-
Particle swarm optimization for preemptive scheduling under break and resource-constraints
-
Zhang, H, Li, H., and Tam, C. M. (2006b). "Particle swarm optimization for preemptive scheduling under break and resource-constraints." J. Constr. Eng. Manage., 132(3), 259-267.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.3
, pp. 259-267
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
|