-
1
-
-
33947217417
-
Software project management with GAs
-
Alba E., and Chicano J.F. Software project management with GAs. Information Sciences 177 (2007) 2380-2401
-
(2007)
Information Sciences
, vol.177
, pp. 2380-2401
-
-
Alba, E.1
Chicano, J.F.2
-
2
-
-
0038522575
-
Insertion techniques for static and dynamic resource-constrained project scheduling
-
Artigues C., Michelon P., and Reusser S. Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149 (2003) 249-267
-
(2003)
European Journal of Operational Research
, vol.149
, pp. 249-267
-
-
Artigues, C.1
Michelon, P.2
Reusser, S.3
-
5
-
-
34047265638
-
Applying fuzzy method for measuring criticality in project network
-
Chen C.-T., and Huang S.-F. Applying fuzzy method for measuring criticality in project network. Information Sciences 177 (2007) 2448-2458
-
(2007)
Information Sciences
, vol.177
, pp. 2448-2458
-
-
Chen, C.-T.1
Huang, S.-F.2
-
7
-
-
73149120779
-
-
Comparative analysis of meta-heuristics for the resource constrained project scheduling problem, Department of Civil Engineering, Instituto Superior Tecnico, Portugal
-
J.S. Coelho, L.V. Tavares, Comparative analysis of meta-heuristics for the resource constrained project scheduling problem, Department of Civil Engineering, Instituto Superior Tecnico, Portugal, 2003.
-
(2003)
-
-
Coelho, J.S.1
Tavares, L.V.2
-
8
-
-
45849083126
-
Time series forecasting with a non-linear model and the scatter search meta-heuristic
-
da Silva C.G. Time series forecasting with a non-linear model and the scatter search meta-heuristic. Information Sciences 178 (2008) 3288-3299
-
(2008)
Information Sciences
, vol.178
, pp. 3288-3299
-
-
da Silva, C.G.1
-
9
-
-
60349124753
-
Differential evolution for solving multi-mode resource-constrained project scheduling problems
-
Damak N., Jarboui B., Siarry P., and Loukil T. Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers & Operations Research 36 (2009) 2653-2659
-
(2009)
Computers & Operations Research
, vol.36
, pp. 2653-2659
-
-
Damak, N.1
Jarboui, B.2
Siarry, P.3
Loukil, T.4
-
11
-
-
38549091692
-
A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
-
Debels D., and Vanhoucke M. A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem. Operations Research 55 (2007) 457-469
-
(2007)
Operations Research
, vol.55
, pp. 457-469
-
-
Debels, D.1
Vanhoucke, M.2
-
12
-
-
0002012598
-
The ant colony optimization meta-heuristic
-
Corne D., Dorigo M., and Glover F. (Eds), McGraw-Hill, London
-
Dorigo M., and Caro G.D. The ant colony optimization meta-heuristic. In: Corne D., Dorigo M., and Glover F. (Eds). New Ideas in Optimization (1999), McGraw-Hill, London 11-32
-
(1999)
New Ideas in Optimization
, pp. 11-32
-
-
Dorigo, M.1
Caro, G.D.2
-
13
-
-
0031122887
-
Ant colony system: a cooperative learning approach to the traveling salesman problem
-
Dorigo M., and Gambardella L.M. Ant colony system: a cooperative learning approach to the traveling salesman problem. IEEE Transactions on Evolutionary Computation 1 (1997) 53-66
-
(1997)
IEEE Transactions on Evolutionary Computation
, vol.1
, pp. 53-66
-
-
Dorigo, M.1
Gambardella, L.M.2
-
14
-
-
33845433823
-
Exchange strategies for multiple ant colony system
-
Ellabib I., Calamai P., and Basir O. Exchange strategies for multiple ant colony system. Information Sciences 177 (2007) 1248-1264
-
(2007)
Information Sciences
, vol.177
, pp. 1248-1264
-
-
Ellabib, I.1
Calamai, P.2
Basir, O.3
-
15
-
-
1642436954
-
Solving the resource-constrained project scheduling problem by a variable neighbourhood search
-
Fleszar K., and Hindi K.S. Solving the resource-constrained project scheduling problem by a variable neighbourhood search. European Journal of Operational Research 155 (2004) 402-413
-
(2004)
European Journal of Operational Research
, vol.155
, pp. 402-413
-
-
Fleszar, K.1
Hindi, K.S.2
-
17
-
-
84989487658
-
Heuristics for integer programming using surrogate constraints
-
Glover F. Heuristics for integer programming using surrogate constraints. Decision Sciences 8 (1977) 156-166
-
(1977)
Decision Sciences
, vol.8
, pp. 156-166
-
-
Glover, F.1
-
18
-
-
77949587087
-
A template for scatter search and path relinking
-
Glover F. A template for scatter search and path relinking. Artificial Evolution 1363 (1998) 3-51
-
(1998)
Artificial Evolution
, vol.1363
, pp. 3-51
-
-
Glover, F.1
-
19
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45 (1998) 733-750
-
(1998)
Naval Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
20
-
-
0036684673
-
A self-adapting genetic algorithm for project scheduling under resource constraints
-
Hartmann S. A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49 (2002) 433-448
-
(2002)
Naval Research Logistics
, vol.49
, pp. 433-448
-
-
Hartmann, S.1
-
21
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
22
-
-
36749094527
-
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
-
Jarboui B., Damak N., Siarry P., and Rebai A. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 195 (2008) 299-308
-
(2008)
Applied Mathematics and Computation
, vol.195
, pp. 299-308
-
-
Jarboui, B.1
Damak, N.2
Siarry, P.3
Rebai, A.4
-
23
-
-
0034544454
-
Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects
-
Klein R. Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects. European Journal of Operational Research 127 (2000) 619-638
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 619-638
-
-
Klein, R.1
-
25
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: an update
-
Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: an update. European Journal of Operational Research 174 (2006) 23-37
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
26
-
-
0002030301
-
Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis
-
Weglarz J. (Ed), Kluwer Academic Publishers, Berlin
-
Kolisch R., and Hartmann S. Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In: Weglarz J. (Ed). Project Scheduling: Recent Models, algorithms and Applications (1999), Kluwer Academic Publishers, Berlin 147-178
-
(1999)
Project Scheduling: Recent Models, algorithms and Applications
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
27
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 (2001) 249-272
-
(2001)
Omega
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
28
-
-
0030788844
-
PSPLIB - a project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program
-
Kolisch R., and Sprecher A. PSPLIB - a project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program. European Journal of Operational Research 96 (1997) 205-216
-
(1997)
European Journal of Operational Research
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
29
-
-
18844412146
-
A hybrid search algorithm with heuristics for resource allocation problem
-
Lee Z.J., and Lee C.Y. A hybrid search algorithm with heuristics for resource allocation problem. Information Sciences 173 (2005) 155-167
-
(2005)
Information Sciences
, vol.173
, pp. 155-167
-
-
Lee, Z.J.1
Lee, C.Y.2
-
31
-
-
44849140428
-
A random key based genetic algorithm for the resource constrained project scheduling problem
-
Mendes J.J.M., Goncalves J.F., and Resende M.G.C. A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research 36 (2009) 92-109
-
(2009)
Computers & Operations Research
, vol.36
, pp. 92-109
-
-
Mendes, J.J.M.1
Goncalves, J.F.2
Resende, M.G.C.3
-
33
-
-
0032070635
-
An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
-
Mingozzi A., Maniezzo V., Ricciardelli S., and Bianco L. An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation. Management Science 44 (1998) 714-729
-
(1998)
Management Science
, vol.44
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
34
-
-
59149093294
-
Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem
-
Mobini M.D.M., Rabbani M., Amalnik M.S., Razmi J., and Rahimi-Vahed A.R. Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem. Soft Computing 13 (2009) 597-610
-
(2009)
Soft Computing
, vol.13
, pp. 597-610
-
-
Mobini, M.D.M.1
Rabbani, M.2
Amalnik, M.S.3
Razmi, J.4
Rahimi-Vahed, A.R.5
-
35
-
-
49149130885
-
AbYSS: adapting scatter search to multiobjective optimization
-
Nebro A.J., Luna F., Alba E., Dorronsoro B., Durillo J.J., and Beham A. AbYSS: adapting scatter search to multiobjective optimization. IEEE Transactions on Evolutionary Computation 12 (2008) 439-457
-
(2008)
IEEE Transactions on Evolutionary Computation
, vol.12
, pp. 439-457
-
-
Nebro, A.J.1
Luna, F.2
Alba, E.3
Dorronsoro, B.4
Durillo, J.J.5
Beham, A.6
-
36
-
-
0038527513
-
Formulation and tabu search algorithm for the resource constrained project scheduling problem
-
Hansen P. (Ed), Kluwer Academic Publishers
-
Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Hansen P. (Ed). Essays and Surveys in Metaheuristics (2001), Kluwer Academic Publishers 557-588
-
(2001)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
37
-
-
4444294743
-
LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search
-
Palpant M., Artigues C., and Michelon P. LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search. Annals of Operations Research 131 (2004) 237-257
-
(2004)
Annals of Operations Research
, vol.131
, pp. 237-257
-
-
Palpant, M.1
Artigues, C.2
Michelon, P.3
-
38
-
-
52049097838
-
A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
-
Ranjbar M., De Reyck B., and Kianfar F. A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling. European Journal of Operational Research 193 (2009) 35-48
-
(2009)
European Journal of Operational Research
, vol.193
, pp. 35-48
-
-
Ranjbar, M.1
De Reyck, B.2
Kianfar, F.3
-
39
-
-
38649127603
-
Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
-
Ranjbar M., Kianfar F., and Shadrokh S. Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm. Applied Mathematics and Computation 196 (2008) 879-888
-
(2008)
Applied Mathematics and Computation
, vol.196
, pp. 879-888
-
-
Ranjbar, M.1
Kianfar, F.2
Shadrokh, S.3
-
40
-
-
0029636114
-
Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
-
Sprecher A., Kolisch R., and Drexl A. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research 80 (1995) 94-102
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 94-102
-
-
Sprecher, A.1
Kolisch, R.2
Drexl, A.3
-
42
-
-
24944527635
-
Integrating heuristics for resource constrained project scheduling: One step forward
-
Technical Report, Department of Statistics and Operations Research, Universidad Politecnica de Valencia
-
P. Tormos, A. Lova, Integrating heuristics for resource constrained project scheduling: one step forward, Technical Report, Department of Statistics and Operations Research, Universidad Politecnica de Valencia, 2003.
-
(2003)
-
-
Tormos, P.1
Lova, A.2
-
43
-
-
4944262481
-
A new hybrid heuristic approach for solving large traveling salesman problem
-
Tsai C.-F., Tsai C.-W., and Tseng C.-C. A new hybrid heuristic approach for solving large traveling salesman problem. Information Sciences 166 (2003) 67-81
-
(2003)
Information Sciences
, vol.166
, pp. 67-81
-
-
Tsai, C.-F.1
Tsai, C.-W.2
Tseng, C.-C.3
-
44
-
-
33748439560
-
A hybrid metaheuristic for the resource-constrained project scheduling problem
-
Tseng L.-Y., and Chen S.-C. A hybrid metaheuristic for the resource-constrained project scheduling problem. European Journal of Operational Research 175 (2006) 707-721
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 707-721
-
-
Tseng, L.-Y.1
Chen, S.-C.2
-
46
-
-
4444364098
-
A population-based approach to the resource-constrained project scheduling problem
-
Valls V., Ballestín F., and Quintanilla S. A population-based approach to the resource-constrained project scheduling problem. Annals of Operations Research 131 (2004) 305-324
-
(2004)
Annals of Operations Research
, vol.131
, pp. 305-324
-
-
Valls, V.1
Ballestín, F.2
Quintanilla, S.3
-
47
-
-
33745766181
-
-
Department of Statistics and Operations Research, University of Valencia
-
V. Valls, F. Ballestin, M.S. Quintanilla, A hybrid genetic algorithm for the RCPSP, Department of Statistics and Operations Research, University of Valencia, 2003.
-
(2003)
A hybrid genetic algorithm for the RCPSP
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, M.S.3
-
49
-
-
33845504706
-
Robust optimization models for project scheduling with resource availability cost
-
Yamashita D.S., Armentano V.A., and Laguna M. Robust optimization models for project scheduling with resource availability cost. Journal of Scheduling 10 (2007) 67-76
-
(2007)
Journal of Scheduling
, vol.10
, pp. 67-76
-
-
Yamashita, D.S.1
Armentano, V.A.2
Laguna, M.3
-
51
-
-
65549099760
-
Deadline division-based heuristic for cost optimization in workflow scheduling
-
Yuan Y., Li X., Wang Q., and Zhu X. Deadline division-based heuristic for cost optimization in workflow scheduling. Information Sciences 179 (2009) 2562-2575
-
(2009)
Information Sciences
, vol.179
, pp. 2562-2575
-
-
Yuan, Y.1
Li, X.2
Wang, Q.3
Zhu, X.4
-
52
-
-
67650945001
-
A robust scheduling method based on a multi-objective immune algorithm
-
Zuo X., Mo H., and Wu J. A robust scheduling method based on a multi-objective immune algorithm. Information Sciences 179 (2009) 3359-3369
-
(2009)
Information Sciences
, vol.179
, pp. 3359-3369
-
-
Zuo, X.1
Mo, H.2
Wu, J.3
|