메뉴 건너뛰기




Volumn 185, Issue 2, 2008, Pages 495-508

A hybrid genetic algorithm for the resource-constrained project scheduling problem

Author keywords

Heuristics; Project management; Scheduling

Indexed keywords

CONSTRAINT THEORY; GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; OPERATIONS RESEARCH; PROBLEM SOLVING; RESOURCE ALLOCATION; SCHEDULING;

EID: 34648837872     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.12.033     Document Type: Article
Times cited : (218)

References (41)
  • 1
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in project scheduling
    • Alcaraz J., and Maroto C. A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research 102 (2001) 83-109
    • (2001) Annals of Operations Research , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 2
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • Artigues C., Michelon P., and Reusser S. Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149 (2003) 249-267
    • (2003) European Journal of Operational Research , vol.149 , pp. 249-267
    • Artigues, C.1    Michelon, P.2    Reusser, S.3
  • 4
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 2 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 8
    • 0038708604 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • Dorndorf U., Pesch E., and Phan-Huy T. A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of Operations Research 52 (2000) 413-439
    • (2000) Mathematical Methods of Operations Research , vol.52 , pp. 413-439
    • Dorndorf, U.1    Pesch, E.2    Phan-Huy, T.3
  • 9
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl A. Scheduling of project networks by job assignment. Management Science 37 (1991) 1590-1602
    • (1991) Management Science , vol.37 , pp. 1590-1602
    • Drexl, A.1
  • 10
    • 1642436954 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem by a variable neighbourhood search
    • Fleszar K., and Hindi K.S. Solving the resource-constrained project scheduling problem by a variable neighbourhood search. European Journal of Operational Research 155 2 (2004) 402-413
    • (2004) European Journal of Operational Research , vol.155 , Issue.2 , pp. 402-413
    • Fleszar, K.1    Hindi, K.S.2
  • 12
    • 0000904077 scopus 로고
    • Messy genetic algorithms: Motivation, analysis, and first results
    • Goldberg D.E., Korb B., and Deb K. Messy genetic algorithms: Motivation, analysis, and first results. Complex Systems 3 (1989) 493-530
    • (1989) Complex Systems , vol.3 , pp. 493-530
    • Goldberg, D.E.1    Korb, B.2    Deb, K.3
  • 13
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45 (1998) 733-750
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 14
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann S. A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49 (2002) 433-448
    • (2002) Naval Research Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 15
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 2 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 18
    • 34648819423 scopus 로고    scopus 로고
    • Kochetov, Y., Stolyar, A., 2003. Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem. In: Proceeding of Workshop on Computer Science and Information Technologies.
  • 19
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • Project Scheduling. Weglarz J. (Ed), Kluwer Academic Publishers, Boston
    • Kolisch R., and Hartmann S. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J. (Ed). Project Scheduling. Recent Models, Algorithms and Applications (1999), Kluwer Academic Publishers, Boston 147-178
    • (1999) Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 20
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 (2006) 23-37
    • (2006) European Journal of Operational Research , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 21
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 (2001) 249-272
    • (2001) Omega , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 22
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling library
    • Available from:
    • Kolisch R., and Sprecher A. PSPLIB - A project scheduling library. European Journal of Operational Research 96 (1997) 205-216. http://129.187.106.231/psplib Available from:
    • (1997) European Journal of Operational Research , vol.96 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 23
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 (1995) 1693-1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 24
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li K.Y., and Willis R.J. An iterative scheduling technique for resource-constrained project scheduling. European Journal of Operational Research 56 (1992) 370-379
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 26
    • 0037871958 scopus 로고    scopus 로고
    • Solving project scheduling problems by minimum cut computations
    • Möhring R., Schulz A., Stork F., and Uetz M. Solving project scheduling problems by minimum cut computations. Management Science 49 3 (2003) 330-350
    • (2003) Management Science , vol.49 , Issue.3 , pp. 330-350
    • Möhring, R.1    Schulz, A.2    Stork, F.3    Uetz, M.4
  • 28
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP)
    • Ribeiro C.C., and Hansen P. (Eds), Kluwer Academic Publishers
    • Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP). In: Ribeiro C.C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2002), Kluwer Academic Publishers 557-588
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 29
    • 0030574808 scopus 로고    scopus 로고
    • A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
    • Özdamar L., and Ulusoy G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis. European Journal of Operational Research 89 (1996) 400-407
    • (1996) European Journal of Operational Research , vol.89 , pp. 400-407
    • Özdamar, L.1    Ulusoy, G.2
  • 30
    • 0030231464 scopus 로고    scopus 로고
    • An iterative local constraint based analysis for solving the resource-constrained project scheduling problem
    • Özdamar L., and Ulusoy G. An iterative local constraint based analysis for solving the resource-constrained project scheduling problem. Journal of Operations Management 14 (1996) 193-208
    • (1996) Journal of Operations Management , vol.14 , pp. 193-208
    • Özdamar, L.1    Ulusoy, G.2
  • 31
    • 34648827946 scopus 로고    scopus 로고
    • Palpant, M., Artigues, C., Michelon, P., 2003. A LNS method for solving the resource-constrained project scheduling problem. In: Proceedings of the 5th Metaheuristic International Conference MIC.
  • 32
    • 4444294743 scopus 로고    scopus 로고
    • LSSPER solving the Resource-Constrained Project Scheduling Problem with large neighbourhood search
    • Palpant M., Artigues C., and Michelon P. LSSPER solving the Resource-Constrained Project Scheduling Problem with large neighbourhood search. Annals of Operations Research 31 1 (2004) 237-257
    • (2004) Annals of Operations Research , vol.31 , Issue.1 , pp. 237-257
    • Palpant, M.1    Artigues, C.2    Michelon, P.3
  • 33
    • 0036531774 scopus 로고    scopus 로고
    • Network decomposition techniques for resource-constrained project scheduling
    • Sprecher A. Network decomposition techniques for resource-constrained project scheduling. Journal of the Operational Research Society 53 4 (2002) 405-414
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.4 , pp. 405-414
    • Sprecher, A.1
  • 34
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos P., and Lova A. A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research 102 (2001) 65-81
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 35
    • 34648813165 scopus 로고    scopus 로고
    • Tormos, P., Lova, A., 2003a. Integrating heuristics for resource constrained project scheduling: One step forward. Technical report, Department of Statistics and Operations Research, Universidad Politécnica de Valencia.
  • 36
    • 0242364615 scopus 로고    scopus 로고
    • An efficient multi-pass heuristic for project scheduling with constrained resources
    • Tormos P., and Lova A. An efficient multi-pass heuristic for project scheduling with constrained resources. International Journal of Production Research 41 (2003) 1071-1086
    • (2003) International Journal of Production Research , vol.41 , pp. 1071-1086
    • Tormos, P.1    Lova, A.2
  • 38
  • 39
    • 4444364098 scopus 로고    scopus 로고
    • A population-based approach to the resource-constrained project scheduling problem
    • Valls V., Ballestín F., and Quintanilla S. A population-based approach to the resource-constrained project scheduling problem. Annals of Operations Research 131 (2004) 305-324
    • (2004) Annals of Operations Research , vol.131 , pp. 305-324
    • Valls, V.1    Ballestín, F.2    Quintanilla, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.