-
1
-
-
0042287689
-
A robust genetic algorithm for resource allocation in project scheduling
-
Alcaraz J., and Maroto C. A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research 102 (2001) 83-109
-
(2001)
Annals of Operations Research
, vol.102
, pp. 83-109
-
-
Alcaraz, J.1
Maroto, C.2
-
2
-
-
0038522575
-
Insertion techniques for static and dynamic resource-constrained project scheduling
-
Artigues C., Michelon P., and Reusser S. Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149 (2003) 249-267
-
(2003)
European Journal of Operational Research
, vol.149
, pp. 249-267
-
-
Artigues, C.1
Michelon, P.2
Reusser, S.3
-
4
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
-
Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 2 (2003) 268-281
-
(2003)
European Journal of Operational Research
, vol.149
, Issue.2
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
5
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker P., Drexl A., Möhring R., Neumann K., and Pesch E. Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112 (1999) 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
6
-
-
25444456205
-
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
-
Debels D., De Reyck B., Leus R., and Vanhoucke M. A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research 169 2 (2006) 638-653
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.2
, pp. 638-653
-
-
Debels, D.1
De Reyck, B.2
Leus, R.3
Vanhoucke, M.4
-
8
-
-
0038708604
-
A branch-and-bound algorithm for the resource-constrained project scheduling problem
-
Dorndorf U., Pesch E., and Phan-Huy T. A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of Operations Research 52 (2000) 413-439
-
(2000)
Mathematical Methods of Operations Research
, vol.52
, pp. 413-439
-
-
Dorndorf, U.1
Pesch, E.2
Phan-Huy, T.3
-
9
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl A. Scheduling of project networks by job assignment. Management Science 37 (1991) 1590-1602
-
(1991)
Management Science
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
10
-
-
1642436954
-
Solving the resource-constrained project scheduling problem by a variable neighbourhood search
-
Fleszar K., and Hindi K.S. Solving the resource-constrained project scheduling problem by a variable neighbourhood search. European Journal of Operational Research 155 2 (2004) 402-413
-
(2004)
European Journal of Operational Research
, vol.155
, Issue.2
, pp. 402-413
-
-
Fleszar, K.1
Hindi, K.S.2
-
11
-
-
0003722376
-
-
Addison-Wesley, Reading, Massachusetts
-
Goldberg D.E. Genetic Algorithms in Search, Optimization, and Machine Learning (1989), Addison-Wesley, Reading, Massachusetts
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
12
-
-
0000904077
-
Messy genetic algorithms: Motivation, analysis, and first results
-
Goldberg D.E., Korb B., and Deb K. Messy genetic algorithms: Motivation, analysis, and first results. Complex Systems 3 (1989) 493-530
-
(1989)
Complex Systems
, vol.3
, pp. 493-530
-
-
Goldberg, D.E.1
Korb, B.2
Deb, K.3
-
13
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann S. A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45 (1998) 733-750
-
(1998)
Naval Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
14
-
-
0036684673
-
A self-adapting genetic algorithm for project scheduling under resource constraints
-
Hartmann S. A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49 (2002) 433-448
-
(2002)
Naval Research Logistics
, vol.49
, pp. 433-448
-
-
Hartmann, S.1
-
15
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 2 (2000) 394-407
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
18
-
-
34648819423
-
-
Kochetov, Y., Stolyar, A., 2003. Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem. In: Proceeding of Workshop on Computer Science and Information Technologies.
-
-
-
-
19
-
-
0002030301
-
Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
-
Project Scheduling. Weglarz J. (Ed), Kluwer Academic Publishers, Boston
-
Kolisch R., and Hartmann S. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J. (Ed). Project Scheduling. Recent Models, Algorithms and Applications (1999), Kluwer Academic Publishers, Boston 147-178
-
(1999)
Recent Models, Algorithms and Applications
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
20
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 (2006) 23-37
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
21
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 (2001) 249-272
-
(2001)
Omega
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
22
-
-
0030788844
-
PSPLIB - A project scheduling library
-
Available from:
-
Kolisch R., and Sprecher A. PSPLIB - A project scheduling library. European Journal of Operational Research 96 (1997) 205-216. http://129.187.106.231/psplib Available from:
-
(1997)
European Journal of Operational Research
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
23
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 (1995) 1693-1703
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
24
-
-
0026822242
-
An iterative scheduling technique for resource-constrained project scheduling
-
Li K.Y., and Willis R.J. An iterative scheduling technique for resource-constrained project scheduling. European Journal of Operational Research 56 (1992) 370-379
-
(1992)
European Journal of Operational Research
, vol.56
, pp. 370-379
-
-
Li, K.Y.1
Willis, R.J.2
-
26
-
-
0037871958
-
Solving project scheduling problems by minimum cut computations
-
Möhring R., Schulz A., Stork F., and Uetz M. Solving project scheduling problems by minimum cut computations. Management Science 49 3 (2003) 330-350
-
(2003)
Management Science
, vol.49
, Issue.3
, pp. 330-350
-
-
Möhring, R.1
Schulz, A.2
Stork, F.3
Uetz, M.4
-
28
-
-
84888782064
-
Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP)
-
Ribeiro C.C., and Hansen P. (Eds), Kluwer Academic Publishers
-
Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP). In: Ribeiro C.C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2002), Kluwer Academic Publishers 557-588
-
(2002)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
29
-
-
0030574808
-
A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
-
Özdamar L., and Ulusoy G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis. European Journal of Operational Research 89 (1996) 400-407
-
(1996)
European Journal of Operational Research
, vol.89
, pp. 400-407
-
-
Özdamar, L.1
Ulusoy, G.2
-
30
-
-
0030231464
-
An iterative local constraint based analysis for solving the resource-constrained project scheduling problem
-
Özdamar L., and Ulusoy G. An iterative local constraint based analysis for solving the resource-constrained project scheduling problem. Journal of Operations Management 14 (1996) 193-208
-
(1996)
Journal of Operations Management
, vol.14
, pp. 193-208
-
-
Özdamar, L.1
Ulusoy, G.2
-
31
-
-
34648827946
-
-
Palpant, M., Artigues, C., Michelon, P., 2003. A LNS method for solving the resource-constrained project scheduling problem. In: Proceedings of the 5th Metaheuristic International Conference MIC.
-
-
-
-
32
-
-
4444294743
-
LSSPER solving the Resource-Constrained Project Scheduling Problem with large neighbourhood search
-
Palpant M., Artigues C., and Michelon P. LSSPER solving the Resource-Constrained Project Scheduling Problem with large neighbourhood search. Annals of Operations Research 31 1 (2004) 237-257
-
(2004)
Annals of Operations Research
, vol.31
, Issue.1
, pp. 237-257
-
-
Palpant, M.1
Artigues, C.2
Michelon, P.3
-
33
-
-
0036531774
-
Network decomposition techniques for resource-constrained project scheduling
-
Sprecher A. Network decomposition techniques for resource-constrained project scheduling. Journal of the Operational Research Society 53 4 (2002) 405-414
-
(2002)
Journal of the Operational Research Society
, vol.53
, Issue.4
, pp. 405-414
-
-
Sprecher, A.1
-
34
-
-
0035617605
-
A competitive heuristic solution technique for resource-constrained project scheduling
-
Tormos P., and Lova A. A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research 102 (2001) 65-81
-
(2001)
Annals of Operations Research
, vol.102
, pp. 65-81
-
-
Tormos, P.1
Lova, A.2
-
35
-
-
34648813165
-
-
Tormos, P., Lova, A., 2003a. Integrating heuristics for resource constrained project scheduling: One step forward. Technical report, Department of Statistics and Operations Research, Universidad Politécnica de Valencia.
-
-
-
-
36
-
-
0242364615
-
An efficient multi-pass heuristic for project scheduling with constrained resources
-
Tormos P., and Lova A. An efficient multi-pass heuristic for project scheduling with constrained resources. International Journal of Production Research 41 (2003) 1071-1086
-
(2003)
International Journal of Production Research
, vol.41
, pp. 1071-1086
-
-
Tormos, P.1
Lova, A.2
-
37
-
-
85030634221
-
Genetic local search algorithm for the traveling salesman problem
-
Maenner R., and Schwefel H.P. (Eds), Springer-Verlag
-
Ulder N.L.J., Pesch E., van Laarhoven P.J.M., Bandelt H.J., and Aarts E.H.L. Genetic local search algorithm for the traveling salesman problem. In: Maenner R., and Schwefel H.P. (Eds). Parallel Problem Solving from Nature (1991), Springer-Verlag 109-116
-
(1991)
Parallel Problem Solving from Nature
, pp. 109-116
-
-
Ulder, N.L.J.1
Pesch, E.2
van Laarhoven, P.J.M.3
Bandelt, H.J.4
Aarts, E.H.L.5
-
39
-
-
4444364098
-
A population-based approach to the resource-constrained project scheduling problem
-
Valls V., Ballestín F., and Quintanilla S. A population-based approach to the resource-constrained project scheduling problem. Annals of Operations Research 131 (2004) 305-324
-
(2004)
Annals of Operations Research
, vol.131
, pp. 305-324
-
-
Valls, V.1
Ballestín, F.2
Quintanilla, S.3
|