-
1
-
-
0036464756
-
The particle swarm-explosion, stability, and convergence in a multidimensional complex space
-
Clerc, M., and Kennedy, J. (2002). " The particle swarm-explosion, stability, and convergence in a multidimensional complex space.. " IEEE Trans. Evol. Comput., 6 (1), 58-73.
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.1
, pp. 58-73
-
-
Clerc, M.1
Kennedy, J.2
-
2
-
-
0000150947
-
Applying adaptive algorithms to epistatic domains
-
Kaufmann, San Francisco
-
Davis, L. (1985). " Applying adaptive algorithms to epistatic domains.. " Proc., 9th Int. Joint Conf. on Artificial Intelligence, Kaufmann, San Francisco, 167-164.
-
(1985)
Proc., 9th Int. Joint Conf. on Artificial Intelligence
, pp. 167-164
-
-
Davis, L.1
-
3
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis, E. W., and Patterson, J. H. (1975). " A comparison of heuristic and optimum solutions in resource-constrained project scheduling.. " Manage. Sci., 21, 944-955.
-
(1975)
Manage. Sci.
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
4
-
-
84947807745
-
Comparison between genetic algorithms and particle swarm optimization
-
Springer, New York
-
Eberhart, R. C., and Shi, Y. (1998). " Comparison between genetic algorithms and particle swarm optimization.. " Proc., 7th Annual Conf. on Evolutionary Programming: VII, Springer, New York, 611-616.
-
(1998)
Proc., 7th Annual Conf. on Evolutionary Programming: VII
, pp. 611-616
-
-
Eberhart, R.C.1
Shi, Y.2
-
5
-
-
0034870045
-
Tracking and optimizing dynamic systems with particle swarms
-
Institute of Electrical and Electronics Engineers, New York
-
Eberhart, R. C., and Shi, Y. (2001). " Tracking and optimizing dynamic systems with particle swarms.. " Proc., IEEE Congress on Evolutionary Computation, Institute of Electrical and Electronics Engineers, New York, 94-97.
-
(2001)
Proc., IEEE Congress on Evolutionary Computation
, pp. 94-97
-
-
Eberhart, R.C.1
Shi, Y.2
-
7
-
-
0001424551
-
Algorithms for multiresource generalized assignment problem
-
Gavish, B., and Pirkul, H. (1991). " Algorithms for multiresource generalized assignment problem.. " Manage. Sci., 37 (6), 695-713.
-
(1991)
Manage. Sci.
, vol.37
, Issue.6
, pp. 695-713
-
-
Gavish, B.1
Pirkul, H.2
-
8
-
-
0003722376
-
-
Addison-Wesley, Reading, Mass.
-
Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and matching learning, Addison-Wesley, Reading, Mass.
-
(1989)
Genetic Algorithms in Search, Optimization, and Matching Learning
-
-
Goldberg, D.E.1
-
9
-
-
0027906589
-
Minimizing flow time variance in a single system using genetic algorithm
-
Gupta, C. G., Gupta, Y. P., and Kumar, A. (1993). " Minimizing flow time variance in a single system using genetic algorithm.. " Eur. J. Oper. Res., 70, 289-303.
-
(1993)
Eur. J. Oper. Res.
, vol.70
, pp. 289-303
-
-
Gupta, C.G.1
Gupta, Y.P.2
Kumar, A.3
-
10
-
-
0029535737
-
Particle swarm optimization
-
Institute of Electrical and Electronics Engineers, New York
-
Kennedy, J., and Eberhart, R. C. (1995). " Particle swarm optimization.. " Proc., IEEE Conf. on Neural Networks, Institute of Electrical and Electronics Engineers, New York, 1942-1948.
-
(1995)
Proc., IEEE Conf. on Neural Networks
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
11
-
-
0004222346
-
-
Kaufmann, San Francisco.
-
Kennedy, J., Eberhart, R. C., and Shi, Y. (2001). Swarm intelligence, Kaufmann, San Francisco.
-
(2001)
Swarm Intelligence
-
-
Kennedy, J.1
Eberhart, R.C.2
Shi, Y.3
-
12
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
Kolisch, R. (1996). " Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation.. " Eur. J. Oper. Res., 90, 320-333.
-
(1996)
Eur. J. Oper. Res.
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
13
-
-
0030151930
-
Search heuristics for resource constrained project scheduling
-
Lee, J. K., and Kim, Y. D. (1996). " Search heuristics for resource constrained project scheduling.. " J. Oper. Res. Soc., 47 (5), 678-689.
-
(1996)
J. Oper. Res. Soc.
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.K.1
Kim, Y.D.2
-
14
-
-
0033312040
-
GA based multicriteria optimal model for construction scheduling
-
Leu, S. S., and Yang, C. H. (1999). " GA based multicriteria optimal model for construction scheduling.. " J. Constr. Eng. Manage. 125, 420-427.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, pp. 420-427
-
-
Leu, S.S.1
Yang, C.H.2
-
15
-
-
0002470532
-
A study of permutation crossover operators on the traveling salesman problems
-
Erlbaum, Hillsdale, N.J.
-
Oliver, I. M., Smith, D. J., and Holland, J. R. C. (1987). " A study of permutation crossover operators on the traveling salesman problems.. " Proc., 2nd Int. Conf. on Genetic Algorithms and Their Application, Erlbaum, Hillsdale, N.J., 227-230.
-
(1987)
Proc., 2nd Int. Conf. on Genetic Algorithms and Their Application
, pp. 227-230
-
-
Oliver, I.M.1
Smith, D.J.2
Holland, J.R.C.3
-
16
-
-
0026171588
-
Resource strategies for dynamic project management
-
Padilla, E. M., and Carr, R. I. (1991). " Resource strategies for dynamic project management.. " J. Constr. Eng. Manage., 117 (2), 279-293.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.2
, pp. 279-293
-
-
Padilla, E.M.1
Carr, R.I.2
-
17
-
-
0021460636
-
A comparison of exact procedures for solving the multiple constrained resource project scheduling problem
-
Patterson, J. (1984). " A comparison of exact procedures for solving the multiple constrained resource project scheduling problem.. " Manage. Sci., 30, 854-867.
-
(1984)
Manage. Sci.
, vol.30
, pp. 854-867
-
-
Patterson, J.1
-
18
-
-
0036073433
-
Particle swarm, genetic algorithm, and their hybrids: Optimization of a profiled corrugated horn antenna
-
Institute of Electrical and Electronics Engineers, New York
-
Robinson, J., Sinton, S., and Rahmat-Samii, Y. (2002). " Particle swarm, genetic algorithm, and their hybrids: Optimization of a profiled corrugated horn antenna.. " Proc., IEEE Antennas and Propagation Society Int. Symp. and URSI National Radio Science Meeting, Institute of Electrical and Electronics Engineers, New York, 168-175.
-
(2002)
Proc., IEEE Antennas and Propagation Society Int. Symp. and URSI National Radio Science Meeting
, pp. 168-175
-
-
Robinson, J.1
Sinton, S.2
Rahmat-Samii, Y.3
-
19
-
-
84879015433
-
Parameter selection in particle swarm optimization
-
Springer, New York
-
Shi, Y., and Eberhart, R. C. (1998). " Parameter selection in particle swarm optimization.. " Proc., 7th Annual Conf. on Evolutionary Programming: VII, Springer, New York, 591-600.
-
(1998)
Proc., 7th Annual Conf. on Evolutionary Programming: VII
, pp. 591-600
-
-
Shi, Y.1
Eberhart, R.C.2
-
20
-
-
0037058296
-
Particle swarm optimization for task assignment problem
-
Salman, A., Ahmad, I., and Al-Madani, S. (2002). " Particle swarm optimization for task assignment problem.. " Microprocess. Microsyst., 26 (8), 363-371.
-
(2002)
Microprocess. Microsyst.
, vol.26
, Issue.8
, pp. 363-371
-
-
Salman, A.1
Ahmad, I.2
Al-Madani, S.3
-
22
-
-
0002755938
-
Scheduling optimization using genetic algorithms
-
Van Nostrand Reinhold, New York
-
Syswerda, G. (1991). " Scheduling optimization using genetic algorithms.. " Handbook of genetic algorithms, Van Nostrand Reinhold, New York, 332-349.
-
(1991)
Handbook of Genetic Algorithms
, pp. 332-349
-
-
Syswerda, G.1
-
23
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
Talbot, F. B. (1982). " Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case.. " Manage. Sci., 28 (10), 1197-1210.
-
(1982)
Manage. Sci.
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
24
-
-
0037475094
-
The particle swarm optimization algorithm: Convergence analysis and parameter selection
-
Trelea, I. C. (2003). " The particle swarm optimization algorithm: Convergence analysis and parameter selection.. " Inf. Process. Lett., 85 (6), 317-325.
-
(2003)
Inf. Process. Lett.
, vol.85
, Issue.6
, pp. 317-325
-
-
Trelea, I.C.1
|