메뉴 건너뛰기




Volumn 28, Issue 1, 2010, Pages 75-88

Multi-objective particle swarm optimization for construction time-cost tradeoff problems

Author keywords

Construction methods; Multi objective optimization; Particle swarm optimization (pso); Time cost tradeoff

Indexed keywords

ADDITIONAL COSTS; COMPUTATIONAL ANALYSIS; CONSTRUCTION METHOD; CONSTRUCTION PROJECTS; CONSTRUCTION TIME; MINIMIZING PROJECT DURATION; MULTI OBJECTIVE PARTICLE SWARM OPTIMIZATION; OPTIMAL SETS; OPTIMAL TIME; TIME-COST TRADEOFF; TOTAL COSTS;

EID: 77950948337     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190903406170     Document Type: Article
Times cited : (60)

References (40)
  • 3
    • 4544318435 scopus 로고    scopus 로고
    • The LP/IP hybrid method for construction time-cost trade-off analysis
    • Burns, S., Liu, L. and Feng, C. (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14, 265-76.
    • (1996) Construction Management and Economics , vol.14 , pp. 265-276
    • Burns, S.1    Liu, L.2    Feng, C.3
  • 5
    • 0036464756 scopus 로고    scopus 로고
    • The particle swarm- explosion, stability, and convergence in a multidimensional complex space
    • Clerc, M. and Kennedy, J. (2002) The particle swarm- explosion, stability, and convergence in a multidimensional complex space. IEEE Transactions on Evolutionary Computation, 6(1), 58-73.
    • (2002) IEEE Transactions On Evolutionary Computation , vol.6 , Issue.1 , pp. 58-73
    • Clerc, M.1    Kennedy, J.2
  • 6
    • 85133775397 scopus 로고    scopus 로고
    • A comprehensive survey of evolutionary-based multiobjective optimization techniques
    • Coello, C.A.C. (1999) A comprehensive survey of evolutionary-based multiobjective optimization techniques. Knowledge and Information Systems, 1(3), 269-308.
    • (1999) Knowledge and Information Systems , vol.1 , Issue.3 , pp. 269-308
    • Coello, C.A.C.1
  • 12
    • 0027302082 scopus 로고
    • Resource allocation via dynamic programming in activity networks
    • Elmaghraby, S.E. (1993) Resource allocation via dynamic programming in activity networks. European Journal of Operational Research, 64(22), 199-215.
    • (1993) European Journal of Operational Research , vol.64 , Issue.22 , pp. 199-215
    • Elmaghraby, S.E.1
  • 13
    • 0027302082 scopus 로고
    • Resource allocation via dynamic programming in activity networks
    • Elmaghraby, S.E. (1995) Resource allocation via dynamic programming in activity networks. European Journal of Operational Research, 64, 199-215.
    • (1995) European Journal of Operational Research , vol.64 , pp. 199-215
    • Elmaghraby, S.E.1
  • 14
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C.-W., Liu, L. and Burns, S.A. (1997) Using genetic algorithms to solve construction time-cost trade-off problems. ASCE Journal of Computing in Civil Engineering, 11(3), 184-9.
    • (1997) ASCE Journal of Computing In Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 16
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999) Optimization of construction time-cost trade-off analysis using genetic algorithms. Canadian Journal of Civil Engineering, 26, 685-97.
    • (1999) Canadian Journal of Civil Engineering , vol.26 , pp. 685-697
    • Hegazy, T.1
  • 18
    • 0001620447 scopus 로고
    • Critical path planning and scheduling: Mathematical basis
    • Kelly J. (1961) Critical path planning and scheduling: mathematical basis. Operations Research, 9(3), 296-320.
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 296-320
    • Kelly, J.1
  • 20
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H. and Love, P. (1997) Using improved genetic algorithms to facilitate time-cost optimization. ASCE Journal of Construction Engineering and Management, 123(3), 233-7.
    • (1997) ASCE Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 23
    • 0027545671 scopus 로고
    • Schedule compression using the direct stiffness method
    • Moselhi, O. (1993) Schedule compression using the direct stiffness method. Canadian Journal of Civil Engineering, 20, 65-72.
    • (1993) Canadian Journal of Civil Engineering , vol.20 , pp. 65-72
    • Moselhi, O.1
  • 26
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson, J.H. and Huber, D. (1974) A horizon-varying, zero-one approach to project scheduling. Management Science, 24(6), 990-8.
    • (1974) Management Science , vol.24 , Issue.6 , pp. 990-998
    • Patterson, J.H.1    Huber, D.2
  • 27
    • 0342275420 scopus 로고
    • A structural method of computing project cost polygons
    • Prager, W. (1963) A structural method of computing project cost polygons. Management Science, 9(3), 394-404.
    • (1963) Management Science , vol.9 , Issue.3 , pp. 394-404
    • Prager, W.1
  • 28
    • 32444449874 scopus 로고    scopus 로고
    • An effective use of crowding distance in multiobjective particle swarm optimization
    • ACM Press, Washington, DC, 25-26 June
    • Raquel, C.R. and Naval, P.C. (2005) An effective use of crowding distance in multiobjective particle swarm optimization, in Proceedings of the Genetic and Evolutionary Computation Conference (GECCO 2005), ACM Press, Washington, DC, 25-26 June, pp. 257-64.
    • (2005) Proceedings of The Genetic and Evolutionary Computation Conference (GECCO 2005) , pp. 257-264
    • Raquel, C.R.1    Naval, P.C.2
  • 29
    • 0036522301 scopus 로고    scopus 로고
    • A swarm metaphor for multiobjective design optimization
    • Ray, T. and Liew, K.M. (2002) A swarm metaphor for multiobjective design optimization. Engineering Optimization, 34(2), 141-53.
    • (2002) Engineering Optimization , vol.34 , Issue.2 , pp. 141-153
    • Ray, T.1    Liew, K.M.2
  • 30
    • 0016566179 scopus 로고
    • A dynamic programming solution to cost-time tradeoff for CPM
    • Robinson, D.R. (1975) A dynamic programming solution to cost-time tradeoff for CPM. Management Science, 22(2), 158-66.
    • (1975) Management Science , vol.22 , Issue.2 , pp. 158-166
    • Robinson, D.R.1
  • 32
    • 0037058296 scopus 로고    scopus 로고
    • Particle swarm optimization for task assignment problem
    • Salman, A., Ahmad, I. and Al-Madani, S. (2002) Particle swarm optimization for task assignment problem. Micro-processors and Microsystems, 26(8), 363-71.
    • (2002) Micro-processors and Microsystems , vol.26 , Issue.8 , pp. 363-371
    • Salman, A.1    Ahmad, I.2    Al-Madani, S.3
  • 33
    • 19244376018 scopus 로고
    • A simple CPM time-cost tradeoff algorithm
    • Siemens, N. (1971) A simple CPM time-cost tradeoff algorithm. Management Science, 18(3B), 354-63.
    • (1971) Management Science , vol.18 , Issue.3 B , pp. 354-363
    • Siemens, N.1
  • 35
    • 0037475094 scopus 로고    scopus 로고
    • The particle swarm optimization algorithm: Convergence analysis and parameter selection
    • Trelea, I.C. (2003) The particle swarm optimization algorithm: convergence analysis and parameter selection. Information Processing Letters, 85(6), 317-25.
    • (2003) Information Processing Letters , vol.85 , Issue.6 , pp. 317-325
    • Trelea, I.C.1
  • 36
    • 13244273704 scopus 로고    scopus 로고
    • Particle swarm optimization-based schemes for resource-constrained project scheduling
    • Zhang, H. and Li, H. (2005) Particle swarm optimization-based schemes for resource-constrained project scheduling. Automation in Construction, 14(3), 393-404.
    • (2005) Automation In Construction , vol.14 , Issue.3 , pp. 393-404
    • Zhang, H.1    Li, H.2
  • 37
    • 32944474678 scopus 로고    scopus 로고
    • Particle swarm optimization for preemptive scheduling under break and resource-constraints
    • Zhang, H., Li, H. and Tam, C.M. (2005) Particle swarm optimization for preemptive scheduling under break and resource-constraints. ASCE Journal of Construction Engineering and Management, 132(3), 259-67.
    • (2005) ASCE Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 259-267
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 39
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • Zheng, D.X.M., Ng, S.T. and Kumaraswamy, M. (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(11), 81-91.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.11 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.3
  • 40
    • 0034199979 scopus 로고    scopus 로고
    • Comparison of multiobjective evolutionary algorithms: Empirical results
    • Zitzler, E., Deb, K. and Thiele, L. (2000) Comparison of multiobjective evolutionary algorithms: empirical results. Evolutionary Computation, 8(2), 173-95.
    • (2000) Evolutionary Computation , vol.8 , Issue.2 , pp. 173-195
    • Zitzler, E.1    Deb, K.2    Thiele, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.