메뉴 건너뛰기




Volumn 45, Issue 7, 1998, Pages 733-750

A competitive genetic algorithm for resource-constrained project scheduling

Author keywords

Computational results; Genetic algorithms; Project management and scheduling; Resource constraints

Indexed keywords

GENETIC ALGORITHMS; PROBLEM SOLVING; SCHEDULING;

EID: 0032188522     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C     Document Type: Article
Times cited : (489)

References (34)
  • 2
    • 84989743918 scopus 로고
    • A New Heuristic Solution Method in Resource-Constrained Project Scheduling
    • Bell, C.E., and Han, J., "A New Heuristic Solution Method in Resource-Constrained Project Scheduling," Naval Research Logistics, 38, 315-331 (1991).
    • (1991) Naval Research Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.2
  • 3
    • 0032096810 scopus 로고    scopus 로고
    • A Branch-and-Bound Algorithm for the Resource-Constrained Project Scheduling Problem
    • Brucker, P., Knust, S., Schoo, A., and Thiele, O., "A Branch-and-Bound Algorithm for the Resource-Constrained Project Scheduling Problem," European Journal of Operational Research, 107, 272-288 (1998).
    • (1998) European Journal of Operational Research , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 4
    • 0031188915 scopus 로고    scopus 로고
    • A Simulated Annealing Algorithm for Resource-Constrained Project Scheduling Problems
    • Cho, J.H., and Kim, Y.D., "A Simulated Annealing Algorithm for Resource-Constrained Project Scheduling Problems," Journal of the Operational Research Society, 48, 736-744 (1997).
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 736-744
    • Cho, J.H.1    Kim, Y.D.2
  • 6
    • 0002907360 scopus 로고
    • A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
    • Demeulemeester, E.L., and Herroelen, W.S., "A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem," Management Science, 38, 1803-1818 (1992).
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 7
    • 0031272722 scopus 로고    scopus 로고
    • New Benchmark Results for the Resource-Constrained Project Scheduling Problem
    • Demeulemeester, E.L., and Herroelen, W.S., "New Benchmark Results for the Resource-Constrained Project Scheduling Problem," Management Science, 43, 1485-1492 (1997).
    • (1997) Management Science , vol.43 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 8
    • 0029215084 scopus 로고
    • Evolution Based Learning in a Job Shop Scheduling Environment
    • Dorndorf, U., and Pesch, E., "Evolution Based Learning in a Job Shop Scheduling Environment, Computers & Operations Research, 22, 25-40 (1995).
    • (1995) Computers & Operations Research , vol.22 , pp. 25-40
    • Dorndorf, U.1    Pesch, E.2
  • 14
    • 0030231487 scopus 로고    scopus 로고
    • Efficient Priority Rules for the Resource-Constrained Project Scheduling Problem
    • Kolisch, R., "Efficient Priority Rules for the Resource-Constrained Project Scheduling Problem," Journal of Operations Management, 14, 179-192 (1996).
    • (1996) Journal of Operations Management , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 15
    • 0030121479 scopus 로고    scopus 로고
    • Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation
    • Kolisch, R., "Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation," European Journal of Operational Research, 90, 320-333 (1996).
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 17
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive Search for Solving Hard Project Scheduling Problems
    • Kolisch, R., and Drexl, A., "Adaptive Search for Solving Hard Project Scheduling Problems," Naval Research Logistics, 43, 23-40 (1996).
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 18
    • 0347707571 scopus 로고    scopus 로고
    • Experimentelle Evaluation der Kapazitätsplanung von Projektmanagementsoftware
    • Kolisch, R., and Hempel, K., "Experimentelle Evaluation der Kapazitätsplanung von Projektmanagementsoftware," Zeitschrift für betriebswirtschaftliche Forschung, 48, 999-1018 (1996).
    • (1996) Zeitschrift für Betriebswirtschaftliche Forschung , vol.48 , pp. 999-1018
    • Kolisch, R.1    Hempel, K.2
  • 20
    • 0000698758 scopus 로고
    • Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
    • Kolisch, R., Sprecher, A., and Drexl, A., "Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems," Management Science, 41, 1693-1703 (1995).
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 21
    • 0030151930 scopus 로고    scopus 로고
    • Search Heuristics for Resource-Constrained Project Scheduling
    • Lee, J.-K., and Kim, Y.-D., "Search Heuristics for Resource-Constrained Project Scheduling," Journal of the Operational Research Society, 47, 678-689 (1996).
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 678-689
    • Lee, J.-K.1    Kim, Y.-D.2
  • 22
    • 33845274958 scopus 로고
    • Strength and Adaptability of Problem-Space Based Neighborhoods for Resource-Constrained Scheduling
    • Leon, V.J., and Ramamoorthy, B., "Strength and Adaptability of Problem-Space Based Neighborhoods for Resource-Constrained Scheduling," OR Spektrum, 17, 173-182 (1995).
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Ramamoorthy, B.2
  • 23
    • 0030092403 scopus 로고
    • Heuristic Methods for Evolutionary Computation Techniques
    • Michalewicz, Z., "Heuristic Methods for Evolutionary Computation Techniques," Journal of Heuristics, 1, 177-206 (1995).
    • (1995) Journal of Heuristics , vol.1 , pp. 177-206
    • Michalewicz, Z.1
  • 24
    • 0032070635 scopus 로고    scopus 로고
    • An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
    • Mingozzi, A., Maniezzo, V., Ricciardelli, S., and Bianco, L., "An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation," Management Science, 44, 714-729 (1998).
    • (1998) Management Science , vol.44 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 25
    • 33645980691 scopus 로고    scopus 로고
    • A Genetic Algorithm Approach to a General Category Project Scheduling Problem
    • to appear
    • Özdamar, L., "A Genetic Algorithm Approach to a General Category Project Scheduling Problem," IEEE Transactions on Systems, Man, and Cybernetics, to appear.
    • IEEE Transactions on Systems, Man, and Cybernetics
    • Özdamar, L.1
  • 26
    • 0009627197 scopus 로고
    • A Local Constraint Based Analysis Approach to Project Scheduling under General Resource Constraints
    • Özdamar, L., and Ulusoy, G., "A Local Constraint Based Analysis Approach to Project Scheduling under General Resource Constraints," European Journal of Operational Research, 79, 287-298 (1994).
    • (1994) European Journal of Operational Research , vol.79 , pp. 287-298
    • Özdamar, L.1    Ulusoy, G.2
  • 27
    • 0029393209 scopus 로고
    • A Survey on the Resource-Constrained Project Scheduling Problem
    • Özdamar, L., and Ulusoy, G., "A Survey on the Resource-Constrained Project Scheduling Problem," IIE Transactions, 27, 574-586 (1995).
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 28
    • 0030231464 scopus 로고    scopus 로고
    • An Iterative Local Constraint Based Analysis for Solving the Resource-Constrained Project Scheduling Problem
    • Özdamar, L., and Ulusoy, G., "An Iterative Local Constraint Based Analysis for Solving the Resource-Constrained Project Scheduling Problem," Journal of Operations Management, 14, 193-208 (1996).
    • (1996) Journal of Operations Management , vol.14 , pp. 193-208
    • Özdamar, L.1    Ulusoy, G.2
  • 29
    • 0021460636 scopus 로고
    • A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
    • Patterson, J.H., "A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem," Management Science, 30, 854-867 (1984).
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 30
    • 0010007305 scopus 로고
    • Genetic Algorithms and Combinatorial Optimization
    • V.J. Rayward-Smith (Ed.), Alfred Waller, Henley-on-Thames
    • Reeves, C.R., "Genetic Algorithms and Combinatorial Optimization," In V.J. Rayward-Smith (Ed.), Applications of Modern Heuristic Methods, Alfred Waller, Henley-on-Thames, 1995, pp. 111-125.
    • (1995) Applications of Modern Heuristic Methods , pp. 111-125
    • Reeves, C.R.1
  • 31
    • 84989730007 scopus 로고
    • Local Search Techniques for the Generalized Resource-Constrained Project Scheduling Problem
    • Sampson, S.E., and Weiss, E.N., "Local Search Techniques for the Generalized Resource-Constrained Project Scheduling Problem," Naval Research Logistics, 40, 665-675 (1993).
    • (1993) Naval Research Logistics , vol.40 , pp. 665-675
    • Sampson, S.E.1    Weiss, E.N.2
  • 32
    • 0038188879 scopus 로고    scopus 로고
    • Technical Report, Manuskripte aus den Instituten für Betriebswirtschaftslehre 425, University of Kiel, Germany
    • Sprecher, A., "Solving the RCPSP Efficiently at Modest Memory Requirements," Technical Report, Manuskripte aus den Instituten für Betriebswirtschaftslehre 425, University of Kiel, Germany, 1996.
    • (1996) Solving the RCPSP Efficiently at Modest Memory Requirements
    • Sprecher, A.1
  • 33
    • 0029636114 scopus 로고
    • Semi-Active, Active and Non-Delay Schedules for the Resource-Constrained Project Scheduling Problem
    • Sprecher, A., Kolisch, R., and Drexl, A., "Semi-Active, Active and Non-Delay Schedules for the Resource-Constrained Project Scheduling Problem," European Journal of Operational Research, 80, 94-102 (1995).
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3
  • 34
    • 84974870375 scopus 로고
    • Heuristic Performance and Network/Resource Characteristics in Resource-Constrained Project Scheduling
    • Ulusoy, G., and Özdamar, L., "Heuristic Performance and Network/Resource Characteristics in Resource-Constrained Project Scheduling," Journal of the Operational Research Society, 40, 1145-1152 (1989).
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.