Volumn 14, Issue 3, 1996, Pages 179-192

Efficient priority rules for the resource-constrained project scheduling problem

Author keywords

Experimental evaluation; Parallel scheduling scheme; Priority rules; Resource constrained project scheduling; Single pass heuristics

Indexed keywords

HEURISTIC PROGRAMMING; MANUFACTURE; PERFORMANCE; PLANNING; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 0030231487     PISSN: 02726963     EISSN: None     Source Type: Journal    
DOI: 10.1016/0272-6963(95)00032-1     Document Type: Article
Times cited : (242)

References (55)
  • 2
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
    • R. Slowinski and J. Weglarz (Eds.), Elsevier, Amsterdam
    • Alvarez-Valdes, R. and J.M. Tamarit, 1989a. "Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis", in: R. Slowinski and J. Weglarz (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, pp. 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 3
    • 0009204378 scopus 로고
    • Algoritmos heuristicos deterministas y aleatorios en secuenciacion de proyectos con recursos limitados
    • Alvarez-Valdes, R. and J.M. Tamarit, 1989b. "Algoritmos heuristicos deterministas y aleatorios en secuenciacion de proyectos con recursos limitados", Qüestiio, vol. 13, pp. 173-191.
    • (1989) Qüestiio , vol.13 , pp. 173-191
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 4
    • 0040347834 scopus 로고
    • Project scheduling with resource constraints
    • E.M.L. Beale (Ed.), English University Press, London
    • Balas, E., 1971. "Project scheduling with resource constraints", in: E.M.L. Beale (Ed.), Applications of Mathematical Programming Techniques, English University Press, London, pp. 187-200.
    • (1971) Applications of Mathematical Programming Techniques , pp. 187-200
    • Balas, E.1
  • 6
    • 0025385096 scopus 로고
    • Solving resource-constrained project scheduling problems by A* search
    • Bell, C.E. and K. Park, 1990. "Solving resource-constrained project scheduling problems by A* search", Naval Research Logistics, vol. 37, pp. 61-84.
    • (1990) Naval Research Logistics , vol.37 , pp. 61-84
    • Bell, C.E.1    Park, K.2
  • 7
    • 84989743918 scopus 로고
    • A new heuristic solution method in resource-constrained project scheduling
    • Bell, C.E. and J. Han, 1991. "A new heuristic solution method in resource-constrained project scheduling", Naval Research Logistics, vol. 38, pp. 315-331.
    • (1991) Naval Research Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.2
  • 8
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • Blazewicz, J., J.K. Lenstra and A.H.G. Rinnooy Kan, 1983. "Scheduling subject to resource constraints: Classification and complexity", Discrete Applied Mathematics, vol. 5, pp. 11-24.
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 9
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor, F.F., 1990. "Some efficient multi-heuristic procedures for resource-constrained project scheduling", European Journal of Operational Research, vol. 49, pp. 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 10
    • 0038709760 scopus 로고
    • The schedule-sequencing problem
    • Bowman, E.H., 1959. "The schedule-sequencing problem", Operations Research, vol. 7, pp. 621-624.
    • (1959) Operations Research , vol.7 , pp. 621-624
    • Bowman, E.H.1
  • 11
    • 0038527478 scopus 로고
    • Une methode arborescente pour resoudre les problemes cumulatifs
    • Carlier, J. and B. Latapie, 1991. "Une methode arborescente pour resoudre les problemes cumulatifs", Recherche Operationnelle, vol. 25, pp. 311-340.
    • (1991) Recherche Operationnelle , vol.25 , pp. 311-340
    • Carlier, J.1    Latapie, B.2
  • 14
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental investigation
    • Cooper, D.F., 1976. "Heuristics for scheduling resource-constrained projects: An experimental investigation", Management Science, vol. 22, pp. 1186-1194.
    • (1976) Management Science , vol.22 , pp. 1186-1194
    • Cooper, D.F.1
  • 15
    • 0043114396 scopus 로고
    • A note on serial and parallel heuristics for resource-constrained project scheduling
    • Cooper, D.F., 1977. "A note on serial and parallel heuristics for resource-constrained project scheduling", Foundations of Control Engineering, vol. 2, pp. 131-134.
    • (1977) Foundations of Control Engineering , vol.2 , pp. 131-134
    • Cooper, D.F.1
  • 16
    • 0015715095 scopus 로고
    • An experimental investigation of resource allocation in multiactivity projects
    • Davies, E.M., 1973. "An experimental investigation of resource allocation in multiactivity projects", Operational Research Quarterly, vol. 24, pp. 587-591.
    • (1973) Operational Research Quarterly , vol.24 , pp. 587-591
    • Davies, E.M.1
  • 17
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E.W. and G.E. Heidorn, 1971. "An algorithm for optimal project scheduling under multiple resource constraints", Management Science, vol. 17, pp. 803-816.
    • (1971) Management Science , vol.17 , pp. 803-816
    • Davis, E.W.1    Heidorn, G.E.2
  • 18
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis, E.W. and J.H. Patterson, 1975. "A comparison of heuristic and optimum solutions in resource-constrained project scheduling", Management Science, vol. 21, pp. 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 19
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E. and W.S. Herroelen, 1992. "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem", Management Science, vol. 38, pp. 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.S.2
  • 22
    • 0008559997 scopus 로고
    • Algorithms for project scheduling with resource constraints
    • Elsayed, E.A., 1982. "Algorithms for project scheduling with resource constraints", International Journal of Production Research, vol. 20, pp. 95-103.
    • (1982) International Journal of Production Research , vol.20 , pp. 95-103
    • Elsayed, E.A.1
  • 23
    • 0028399847 scopus 로고
    • A greedy heuristic for the mean tardiness sequencing problem
    • Fadlalla, A., J.R. Evans and M.S. Levy, 1994. "A greedy heuristic for the mean tardiness sequencing problem", Computers & Operations Research, vol. 21, pp. 329-336.
    • (1994) Computers & Operations Research , vol.21 , pp. 329-336
    • Fadlalla, A.1    Evans, J.R.2    Levy, M.S.3
  • 24
    • 0011715549 scopus 로고
    • Comparison of three heuristic procedures for allocating resources and producing schedules
    • H.J.M. Lombaers (Ed.), North-Holland, Amsterdam
    • Gonguet, L., 1969. "Comparison of three heuristic procedures for allocating resources and producing schedules", in: H.J.M. Lombaers (Ed.), Project Planning by Network Analysis, North-Holland, Amsterdam, pp. 249-255.
    • (1969) Project Planning by Network Analysis , pp. 249-255
    • Gonguet, L.1
  • 25
    • 0015359193 scopus 로고
    • On resource allocation in project networks
    • Hastings, N.A.J., 1972. "On resource allocation in project networks", Operational Research Quarterly, vol. 23, pp. 217-221.
    • (1972) Operational Research Quarterly , vol.23 , pp. 217-221
    • Hastings, N.A.J.1
  • 26
    • 0002866635 scopus 로고
    • The critical-path method: Resources planning and scheduling
    • J.F. Muth and G.L. Thompson (Eds.), Prentice-Hall, Englewood Cliffs, NJ
    • Kelley, J.E., Jr., 1963. "The critical-path method: Resources planning and scheduling", in: J.F. Muth and G.L. Thompson (Eds.), Industrial Scheduling, Prentice-Hall, Englewood Cliffs, NJ, pp. 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley J.E., Jr.1
  • 28
    • 85029996111 scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • to appear
    • Kolisch, R., 1995b. "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation", European Journal of Operational Research, to appear.
    • (1995) European Journal of Operational Research
    • Kolisch, R.1
  • 29
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • to appear
    • Kolisch, R., A. Sprecher and A. Drexl, 1995. "Characterization and generation of a general class of resource-constrained project scheduling problems", Management Science, vol. 41, no. 10, to appear.
    • (1995) Management Science , vol.41 , Issue.10
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 31
    • 33845274958 scopus 로고
    • Quality and adaptability of problem-space based neighborhoods for resource constrained scheduling
    • Leon, V.J. and R. Balakrishnan, 1995. "Quality and adaptability of problem-space based neighborhoods for resource constrained scheduling", OR Spektrum, vol. 17, pp. 173-182.
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Balakrishnan, R.2
  • 34
    • 9644286788 scopus 로고
    • Ein verfahren zur planung des opti-malen betriebsmitteleinsatzes bei der terminierung von großprojekten
    • Müller-Merbach, H., 1967. "Ein Verfahren zur Planung des opti-malen Betriebsmitteleinsatzes bei der Terminierung von Großprojekten", Zeitschrift für Wirtschaftliche Fertigung, vol. 62, pp. 83-88, 135-140.
    • (1967) Zeitschrift für Wirtschaftliche Fertigung , vol.62 , pp. 83-88
    • Müller-Merbach, H.1
  • 35
    • 0028195268 scopus 로고
    • A comparative study of computational procedures for the resource constrained project scheduling problem
    • Oguz, O. and H. Bala, 1994. "A comparative study of computational procedures for the resource constrained project scheduling problem", European Journal of Operational Research, vol. 72, pp. 406-416.
    • (1994) European Journal of Operational Research , vol.72 , pp. 406-416
    • Oguz, O.1    Bala, H.2
  • 37
    • 0015742216 scopus 로고
    • Alternate methods of project scheduling with limited resources
    • Patterson, J.H., 1973. "Alternate methods of project scheduling with limited resources", Naval Research Logistics Quarterly, vol. 20, pp. 767-784.
    • (1973) Naval Research Logistics Quarterly , vol.20 , pp. 767-784
    • Patterson, J.H.1
  • 38
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic performance
    • Patterson, J.H., 1976. "Project scheduling: The effects of problem structure on heuristic performance", Naval Research Logistics Quarterly, vol. 23, pp. 95-123.
    • (1976) Naval Research Logistics Quarterly , vol.23 , pp. 95-123
    • Patterson, J.H.1
  • 39
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J.H., 1984. "A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem". Management Science, vol. 30, pp. 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 40
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson, J.H. and W.D. Huber, 1974. "A horizon-varying, zero-one approach to project scheduling", Management Science, vol. 20, pp. 990-998.
    • (1974) Management Science , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 41
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • Patterson, J.H. and G.W. Roth, 1976. "Scheduling a project under multiple resource constraints: A zero-one programming approach", AIIE Transactions, vol. 8, pp. 449-455.
    • (1976) AIIE Transactions , vol.8 , pp. 449-455
    • Patterson, J.H.1    Roth, G.W.2
  • 42
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.B., L.J. Watters and P.M. Wolfe, 1969. "Multiproject scheduling with limited resources: A zero-one programming approach", Management Science, vol. 16, pp. 93-107.
    • (1969) Management Science , vol.16 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 43
  • 44
    • 84989730007 scopus 로고
    • Local search techniques for the generalized resource constrained project scheduling problem
    • Sampson, S.E. and E.N. Weiss, 1993. "Local search techniques for the generalized resource constrained project scheduling problem", Naval Research Logistics, vol. 40, pp. 365-375.
    • (1993) Naval Research Logistics , vol.40 , pp. 365-375
    • Sampson, S.E.1    Weiss, E.N.2
  • 46
    • 30244573360 scopus 로고
    • Einsatz von fertigungsleitständen in der industrie
    • Heft
    • Stadtler, H. und S. Wilhelm, 1993. "Einsatz von Fertigungsleitständen in der Industrie", CIM-Management, Heft 1, pp. 39-44.
    • (1993) CIM-Management , vol.1 , pp. 39-44
    • Stadtler, H.1    Wilhelm, S.2
  • 47
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • Stinson, J.P., E.W. Davis and B.M. Khumawala, 1978. "Multiple resource-constrained scheduling using branch and bound", AIIE Transactions, vol. 10, pp. 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 48
    • 0026930899 scopus 로고
    • New search spaces for sequencing problems with application to job shop scheduling
    • Storer, R.H., S.D. Wu and R. Vaccari, 1992. "New search spaces for sequencing problems with application to job shop scheduling". Management Science, vol. 38, pp. 1495-1509.
    • (1992) Management Science , vol.38 , pp. 1495-1509
    • Storer, R.H.1    Wu, S.D.2    Vaccari, R.3
  • 49
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • Talbot, B. and J.H. Patterson, 1978. "An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems", Management Science, vol. 24, pp. 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, B.1    Patterson, J.H.2
  • 50
    • 0017241984 scopus 로고
    • Heuristic scheduling of activities under resource and precedence restrictions
    • Thesen, A., 1976. "Heuristic scheduling of activities under resource and precedence restrictions", Management Science, vol. 23, pp. 412-422.
    • (1976) Management Science , vol.23 , pp. 412-422
    • Thesen, A.1
  • 51
    • 0026123265 scopus 로고
    • O.R. Techniques for use in redesigning manufacturing and associated business systems
    • Tobias, A., 1991. "O.R. techniques for use in redesigning manufacturing and associated business systems", European Journal of Operational Research, vol. 51, pp. 168-178.
    • (1991) European Journal of Operational Research , vol.51 , pp. 168-178
    • Tobias, A.1
  • 52
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G. and L. Özdamar, 1989. "Heuristic performance and network/resource characteristics in resource-constrained project scheduling", Journal of the Operational Research Society, vol. 40, pp. 1145-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2
  • 54
    • 0018705057 scopus 로고
    • Genres: An extension of Brooks algorithm for project scheduling with resource constraints
    • Whitehouse, G.E. and J.R. Brown, 1979. "Genres: An extension of Brooks algorithm for project scheduling with resource constraints", Computers & Industrial Engineering, vol. 3, pp. 261-268.
    • (1979) Computers & Industrial Engineering , vol.3 , pp. 261-268
    • Whitehouse, G.E.1    Brown, J.R.2
  • 55
    • 0001694940 scopus 로고
    • A heuristic model for scheduling large projects with limited resources
    • Wiest, J.D., 1967. "A heuristic model for scheduling large projects with limited resources", Management Science, vol. 13, pp. B359-B377.
    • (1967) Management Science , vol.13
    • Wiest, J.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.