-
2
-
-
0028074177
-
A study of the continuous flow model of production lines with unreliable machines and finite buffers
-
Alvarez-Vargas, R., Dallery, Y. and David, R., 1994. A study of the continuous flow model of production lines with unreliable machines and finite buffers. Journal of Manufacturing Systems, 13, 221-234.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 221-234
-
-
Alvarez-Vargas, R.1
Dallery, Y.2
David, R.3
-
3
-
-
70449679518
-
-
Tel Aviv, Israel: Department of Industrial Engineerin, Tel Aviv University, Technical Report
-
Arzi, Y. and Kalir, A., 1996. Approximating throughput of non-homogeneous multiple-parallel machines' production lines. Tel Aviv, Israel: Department of Industrial Engineerin, Tel Aviv University, Technical Report.
-
(1996)
Approximating Throughput of Non-homogeneous Multiple-parallel Machines' Production Lines
-
-
Arzi, Y.1
Kalir, A.2
-
4
-
-
58149498296
-
Closed Bernoulli production lines: Analysis, continuous improvement, and leaness
-
to appear
-
Biller, S., Marin, S.P., Meerkov, S.M. and Zhang, L., 2008. Closed Bernoulli production lines: Analysis, continuous improvement, and leaness. IEEE Transactions on Automation Science and Engineering, to appear.
-
(2008)
IEEE Transactions on Automation Science and Engineering
-
-
Biller, S.1
Marin, S.P.2
Meerkov, S.M.3
Zhang, L.4
-
5
-
-
0043171613
-
A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity
-
Blumenfeld, D.E., 1990. A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity. International Journal of Production Research, 28, 1163-1182.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1163-1182
-
-
Blumenfeld, D.E.1
-
6
-
-
31044437924
-
An analytical formula for throughput of a production line with identical stations and random failures
-
Blumenfeld, D.E. and Li, J., 2005. An analytical formula for throughput of a production line with identical stations and random failures. Mathematical Problems in Engineering, 2005, 293-308.
-
(2005)
Mathematical Problems in Engineering
, vol.2005
, pp. 293-308
-
-
Blumenfeld, D.E.1
Li, J.2
-
7
-
-
0028443105
-
Effects of errors and delays in inventory reporting on production system performance
-
Bonney, M., Poplewell, K. and Matoug, M., 1994. Effects of errors and delays in inventory reporting on production system performance. International Journal of Production Economics, 35, 93-105.
-
(1994)
International Journal of Production Economics
, vol.35
, pp. 93-105
-
-
Bonney, M.1
Poplewell, K.2
Matoug, M.3
-
8
-
-
0034633396
-
Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy
-
Bonvik, A.M., Dallery, Y. and Gershwin, S.B., 2000. Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy. International Journal of Production Research, 38, 2845-2869.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 2845-2869
-
-
Bonvik, A.M.1
Dallery, Y.2
Gershwin, S.B.3
-
10
-
-
0015603944
-
Production flow line systems design-a review
-
Buxey, G.M., Slack, N.D. and Wild, R., 1973. Production flow line systems design-a review. AIIE Transactions, 5, 37-48.
-
(1973)
AIIE Transactions
, vol.5
, pp. 37-48
-
-
Buxey, G.M.1
Slack, N.D.2
Wild, R.3
-
11
-
-
84954971480
-
Models of automatic transfer lines with inventory banks: A review and comarison
-
Buzacott, J.A. and Hanifin, L.E., 1978. Models of automatic transfer lines with inventory banks: A review and comarison. AIIE Transactions, 10, 197-207.
-
(1978)
AIIE Transactions
, vol.10
, pp. 197-207
-
-
Buzacott, J.A.1
Hanifin, L.E.2
-
12
-
-
0023533125
-
Matrix-geometric and recursive algorithm solution of a twostage unreliable flow line
-
Buzacott, J.A. and Kostelski, D., 1987. Matrix-geometric and recursive algorithm solution of a twostage unreliable flow line. IIE Transactions, 19, 429-438.
-
(1987)
IIE Transactions
, vol.19
, pp. 429-438
-
-
Buzacott, J.A.1
Kostelski, D.2
-
14
-
-
70449631886
-
Analytical modeling and analysis of flexible manufacturing systems considering system component failure/repair rates
-
Chen, F.F. and Thinphangnga, S., 1996. Analytical modeling and analysis of flexible manufacturing systems considering system component failure/repair rates. Jounral of Manufacturing Systems, 15, 143-154.
-
(1996)
Jounral of Manufacturing Systems
, vol.15
, pp. 143-154
-
-
Chen, F.F.1
Thinphangnga, S.2
-
16
-
-
33646379590
-
Bernoulli serial production lines with quality control devices: Theory and application
-
Article No. 81950
-
Chiang, S.-Y., 2006. Bernoulli serial production lines with quality control devices: Theory and application. Mathematical Problems in Engineering, 2006, Article No. 81950.
-
(2006)
Mathematical Problems in Engineering, 2006
-
-
Chiang, S.-Y.1
-
17
-
-
0032048158
-
Bottlenecks in Markovian production lines: A systems approach
-
Chiang, S.-Y., Kuo, C.-T. and Meerkov, S.M., 1998. Bottlenecks in Markovian production lines: A systems approach. IEEE Transactions on Robotics and Automation, 14, 352-359.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, pp. 352-359
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
18
-
-
0034291972
-
DT-bottleneck in serial production lines: Theory and application
-
Chiang, S.-Y., Kuo, C.-T. and S.M. Meerkov, S.M., 2000a. DT-bottleneck in serial production lines: Theory and application. IEEE Transactions on Robotics and Automation, 16, 567-580.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, pp. 567-580
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov S M, S.M.3
-
19
-
-
0006506394
-
Improvability theory of assembly systems. I: Problem formulation and performance evaluation
-
Chiang, S.-Y., Kuo, C.-T., Lim, J.-T. and Meerkov, S.M., 2000b. Improvability theory of assembly systems. I: Problem formulation and performance evaluation. Mathematical Problems in Engineering, 6, 321-357.
-
(2000)
Mathematical Problems in Engineering
, vol.6
, pp. 321-357
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
20
-
-
0345795631
-
Improvability theory of assembly systems. II: Improvability indicators and case study
-
Chiang, S.-Y., Kuo, C.-T., Lim, J.-T. and Meerkov, S.M., 2000c. Improvability theory of assembly systems. II: Improvability indicators and case study. Mathematical Problems in Engineering, 6, 359-393.
-
(2000)
Mathematical Problems in Engineering
, vol.6
, pp. 359-393
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
21
-
-
0345854809
-
C-Bottleneck in serial production lines
-
Chiang, S.-Y., Kuo, C.-T. and Meerkov, S.M., 2001. c-Bottleneck in serial production lines. Mathematical Problems in Engineering, 7, 543-578.
-
(2001)
Mathematical Problems in Engineering
, vol.7
, pp. 543-578
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
22
-
-
0023366315
-
A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
-
Choong, Y.F. and Gershwin, S.B., 1987. A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. IIE Transactions, 19, 150-159.
-
(1987)
IIE Transactions
, vol.19
, pp. 150-159
-
-
Choong, Y.F.1
Gershwin, S.B.2
-
23
-
-
17444424631
-
Performance evaluation of production lines with finite buffer capacity producing two different products
-
Colledani, M., Matta, A. and Tolio, T., 2005. Performance evaluation of production lines with finite buffer capacity producing two different products. OR Spectrum, 27, 243-263.
-
(2005)
OR Spectrum
, vol.27
, pp. 243-263
-
-
Colledani, M.1
Matta, A.2
Tolio, T.3
-
26
-
-
0025446548
-
Taking into account delays in buffers for analytical performance evaluation of transfer lines
-
Commault, C. and Semery, A., 1990. Taking into account delays in buffers for analytical performance evaluation of transfer lines. IIE Transactions, 22, 133-142.
-
(1990)
IIE Transactions
, vol.22
, pp. 133-142
-
-
Commault, C.1
Semery, A.2
-
29
-
-
0024070564
-
An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R. and Xie, X.-L., 1988. An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20, 280-283.
-
(1988)
IIE Transactions
, vol.20
, pp. 280-283
-
-
Dallery, Y.1
David, R.2
Xie, X.-L.3
-
30
-
-
0024732503
-
Approximate analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R. and Xie, X.-L., 1989. Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34, 943-953.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, pp. 943-953
-
-
Dallery, Y.1
David, R.2
Xie, X.-L.3
-
31
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Dallery, Y. and Gershwin, S.B., 1992. Manufacturing flow line systems: A review of models and analytical results. Queuing Systems, 12, 3-94.
-
(1992)
Queuing Systems
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
32
-
-
0033097497
-
An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
-
Dallery, Y. and Le Bihan, H., 1999. An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. International Journal of Production Research, 37, 1093-1117.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 1093-1117
-
-
Dallery, Y.1
Le Bihan, H.2
-
33
-
-
3342989017
-
Computationally efficient approximations for balanced flowlines with finite intermediate buffers
-
De Kok, A.G., 1990. Computationally efficient approximations for balanced flowlines with finite intermediate buffers. International Journal of Production Research, 28, 401-419.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 401-419
-
-
De Kok, A.G.1
-
35
-
-
0023997862
-
An improved algorithm to approximate the behavior of flow lines
-
De Koster, M.B.M., 1988. An improved algorithm to approximate the behavior of flow lines. International Journal of Production Research, 26, 691-700.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 691-700
-
-
De Koster, M.B.M.1
-
36
-
-
0000628123
-
Optimization of process improvement and inspection location for serial manufacturing
-
Deliman, N.C. and Feldman, R.M., 1996. Optimization of process improvement and inspection location for serial manufacturing. International Journal of Production Research, 34, 395-405.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 395-405
-
-
Deliman, N.C.1
Feldman, R.M.2
-
37
-
-
0031232866
-
Control of a stochastic production system with estimated parameters
-
Denardo, E.V. and Tang, C.S., 1997. Control of a stochastic production system with estimated parameters. Management Science, 43, 1296-1307.
-
(1997)
Management Science
, vol.43
, pp. 1296-1307
-
-
Denardo, E.V.1
Tang, C.S.2
-
38
-
-
1342308560
-
Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines
-
Diamantidis, A.C., Papadopoulos, C.T. and Vidalis, M.I., 2004. Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines. International Journal of Production Research, 42, 651-675.
-
(2004)
International Journal of Production Research
, vol.42
, pp. 651-675
-
-
Diamantidis, A.C.1
Papadopoulos, C.T.2
Vidalis, M.I.3
-
39
-
-
33748302072
-
Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures
-
Diamantidis, A.C. and Papadopoulos, C.T., 2006. Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures. Computer & Industrial Engineering, 50, 466-487.
-
(2006)
Computer & Industrial Engineering
, vol.50
, pp. 466-487
-
-
Diamantidis, A.C.1
Papadopoulos, C.T.2
-
40
-
-
84873013614
-
Modeling and analysis of assembly systems with unreliable machines and finite buffers
-
Di Mascolo, M., David, R. and Dallery, Y., 1991. Modeling and analysis of assembly systems with unreliable machines and finite buffers. IIE Transactions, 23, 315-330.
-
(1991)
IIE Transactions
, vol.23
, pp. 315-330
-
-
Di Mascolo, M.1
David, R.2
Dallery, Y.3
-
41
-
-
0028457112
-
Estimating the throughput of a cyclic assembly system
-
Duenyas, I., 1994. Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32, 1403-1419.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1403-1419
-
-
Duenyas, I.1
-
42
-
-
0006454724
-
CONWIP assembly with deterministic processing and random outages
-
Duenyas, I. and Hopp, W.J., 1992. CONWIP assembly with deterministic processing and random outages. IIE Transactions, 24, 97-109.
-
(1992)
IIE Transactions
, vol.24
, pp. 97-109
-
-
Duenyas, I.1
Hopp, W.J.2
-
43
-
-
0034291568
-
Transfer line design with uncertain machine performance information
-
Feit, E.M. and Wu, S.D., 2000. Transfer line design with uncertain machine performance information. IEEE Transactions on Robotics and Automation, 16, 581-587.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, pp. 581-587
-
-
Feit, E.M.1
Wu, S.D.2
-
44
-
-
0030192549
-
Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers
-
Frein, Y., Commault, C. and Dallery, Y., 1996. Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers. IIE Transactions, 28, 545-554.
-
(1996)
IIE Transactions
, vol.28
, pp. 545-554
-
-
Frein, Y.1
Commault, C.2
Dallery, Y.3
-
45
-
-
0023315347
-
An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
-
Gershwin, S.B., 1987a. An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35, 291-305.
-
(1987)
Operations Research
, vol.35
, pp. 291-305
-
-
Gershwin, S.B.1
-
46
-
-
0008236264
-
Representation and analysis of transfer lines with machines that have different processing rates
-
Gershwin, S.B., 1987b. Representation and analysis of transfer lines with machines that have different processing rates. Annals of Operations Research, 9, 511-530.
-
(1987)
Annals of Operations Research
, vol.9
, pp. 511-530
-
-
Gershwin, S.B.1
-
47
-
-
0002283864
-
An efficient decomposition algorithm for unreliable tandem queuing system with finite buffers
-
H.G. Perros and T. Altiok, eds. Amsterdam: Elsevier
-
Gershwin, S.B., 1989. An efficient decomposition algorithm for unreliable tandem queuing system with finite buffers, In: H.G. Perros and T. Altiok, eds. Queueing networks with blocking. Amsterdam: Elsevier, 127-147.
-
(1989)
Queueing Networks with Blocking
, pp. 127-147
-
-
Gershwin, S.B.1
-
48
-
-
0000440767
-
Assembly/disassembly systems: An efficient decomposition algorithm for treestructured networks
-
Gershwin, S.B., 1991. Assembly/disassembly systems: An efficient decomposition algorithm for treestructured networks. IIE Transactions, 23, 315-331.
-
(1991)
IIE Transactions
, vol.23
, pp. 315-331
-
-
Gershwin, S.B.1
-
50
-
-
0034288452
-
Design and operation of manufacturing systems-the control-point policy
-
Gershwin, S.B., 2000. Design and operation of manufacturing systems-the control-point policy. IIE Transactions, 32, 891-906.
-
(2000)
IIE Transactions
, vol.32
, pp. 891-906
-
-
Gershwin, S.B.1
-
51
-
-
0034397418
-
A decomposition method for analyzing inhomogeneous assembly/disassembly systems
-
Gershwin, S.B. and Burman, M.H., 2000. A decomposition method for analyzing inhomogeneous assembly/disassembly systems. Annals of Operations Research, 93, 91-115.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 91-115
-
-
Gershwin, S.B.1
Burman, M.H.2
-
52
-
-
37849007463
-
-
Dordrecht: Kluwer Academic
-
Gershwin, S.B., Dallery, Y., Papadopoulos, C.T. and Smith, J.M., 2003. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic.
-
(2003)
Analysis and Modeling of Manufacturing Systems
-
-
Gershwin, S.B.1
Dallery, Y.2
Papadopoulos, C.T.3
Smith, J.M.4
-
53
-
-
1342288221
-
Analysis of loop networks by decomposition
-
Tinos Island, Greece
-
Gershwin, S.B., Maggio, N., Matta, A., Tolio, T. and Werner, L.M., 2001. Analysis of loop networks by decomposition. In: 3rd Aegean international conference on design and analysis of manufacturing systems, Tinos Island, Greece.
-
(2001)
3rd Aegean International Conference on Design and Analysis of Manufacturing Systems
-
-
Gershwin, S.B.1
Maggio, N.2
Matta, A.3
Tolio, T.4
Werner, L.M.5
-
54
-
-
34249315492
-
An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers
-
Gershwin, S.B. and Werner, L.M., 2007. An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers. International Journal of Production Research, 45, 3085-3111.
-
(2007)
International Journal of Production Research
, vol.45
, pp. 3085-3111
-
-
Gershwin, S.B.1
Werner, L.M.2
-
55
-
-
0027555001
-
Analysis of behaviour of an unreliable n-stage transfer line with (n-1) inter-storage buffers
-
Glassey, C.R. and Hong, Y., 1993. Analysis of behaviour of an unreliable n-stage transfer line with (n-1) inter-storage buffers. International Journal of Production Research, 31, 519-530.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 519-530
-
-
Glassey, C.R.1
Hong, Y.2
-
57
-
-
0032162842
-
Performance analysis of serial production lines with quality inspection machines
-
Han, M.-S., Lim, J.-T. and Park, D.-J., 1998. Performance analysis of serial production lines with quality inspection machines. International Journal of System Science, 29, 939-951.
-
(1998)
International Journal of System Science
, vol.29
, pp. 939-951
-
-
Han, M.-S.1
Lim, J.-T.2
Park, D.-J.3
-
58
-
-
0005311431
-
Performance analysis of flow lines with non-linear flow of material
-
Berlin: Springer
-
Helber, S., 1999. Performance analysis of flow lines with non-linear flow of material, In: Lecture notes in economics and mathematical systems. Berlin: Springer.
-
(1999)
Lecture Notes in Economics and Mathematical Systems
-
-
Helber, S.1
-
59
-
-
0034381835
-
Approximate analysis of unreliable transfer lines with splits in the flow of material
-
Helber, S., 2000. Approximate analysis of unreliable transfer lines with splits in the flow of material. Annals of Operations Research, 93, 217-243.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 217-243
-
-
Helber, S.1
-
60
-
-
17444379379
-
Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity
-
Helber, S., 2005. Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity. OR Spectrum, 27, 221-242.
-
(2005)
OR Spectrum
, vol.27
, pp. 221-242
-
-
Helber, S.1
-
61
-
-
4043121812
-
A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
-
Helber, S. and Jusic, H., 2004. A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material. Annals of Operations Research, 125, 117-139.
-
(2004)
Annals of Operations Research
, vol.125
, pp. 117-139
-
-
Helber, S.1
Jusic, H.2
-
62
-
-
33746836791
-
Exact analysis of a continuous material merge system with limited buffer capacity and three stations
-
S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
-
Helber, S. and Mehrtens, N., 2003. Exact analysis of a continuous material merge system with limited buffer capacity and three stations, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modleing of manufacturing systems. Dordrecht: Kluwer Academic, 85-121.
-
(2003)
Analysis and Modleing of Manufacturing Systems
, pp. 85-121
-
-
Helber, S.1
Mehrtens, N.2
-
63
-
-
0002058236
-
The analysis of a production line with unreliable machines and random processing times
-
Hong, Y., Glassey, C.R. and Seong, D., 1992. The analysis of a production line with unreliable machines and random processing times. IIE Transactions, 24, 77-83.
-
(1992)
IIE Transactions
, vol.24
, pp. 77-83
-
-
Hong, Y.1
Glassey, C.R.2
Seong, D.3
-
64
-
-
0036468703
-
Using an optimized queueing network model to support wafer fab design
-
Hopp, W.J., Spearman, M.L., Chayet, S., Donohue, K.L. and Gel, E.S., 2002. Using an optimized queueing network model to support wafer fab design. IIE Transactions, 34, 119-130.
-
(2002)
IIE Transactions
, vol.34
, pp. 119-130
-
-
Hopp, W.J.1
Spearman, M.L.2
Chayet, S.3
Donohue, K.L.4
Gel, E.S.5
-
66
-
-
0017504870
-
The output of a two-stage system with unreliable machines and limited storage
-
Ignall, E. and Silver, A., 1977. The output of a two-stage system with unreliable machines and limited storage. AIIE Transactions, 9, 183-188.
-
(1977)
AIIE Transactions
, vol.9
, pp. 183-188
-
-
Ignall, E.1
Silver, A.2
-
67
-
-
0000285320
-
Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
-
Inman, R.R., 1999. Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operation Management, 4, 409-432.
-
(1999)
Production and Operation Management
, vol.4
, pp. 409-432
-
-
Inman, R.R.1
-
68
-
-
0242269872
-
Designing production systems for quality: Research opportunities from automotive industry perspective
-
Inman, R.R., Blumenfeld, D.E., Huang, N. and Li, J., 2003. Designing production systems for quality: Research opportunities from automotive industry perspective. International Journal of Production Research, 41, 1953-1971.
-
(2003)
International Journal of Production Research
, vol.41
, pp. 1953-1971
-
-
Inman, R.R.1
Blumenfeld, D.E.2
Huang, N.3
Li, J.4
-
69
-
-
0023401973
-
The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage
-
Iyama, T. and Ito, S., 1987. The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage. International Journal of Production Research, 25, 1157-1179.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1157-1179
-
-
Iyama, T.1
Ito, S.2
-
71
-
-
0242265534
-
Asymptotically reliable serial production lines with a quality control system
-
Jacobs, D.A. and Meerkov, S.M., 1991. Asymptotically reliable serial production lines with a quality control system. Computers Mathematics and Applications, 21, 85-90.
-
(1991)
Computers Mathematics and Applications
, vol.21
, pp. 85-90
-
-
Jacobs, D.A.1
Meerkov, S.M.2
-
72
-
-
0029291550
-
A system-theoretic property of serial production lines: Improvability
-
Jacobs, D.A. and Meerkov, S.M., 1995a. A system-theoretic property of serial production lines: Improvability. International Journal of System Science, 26, 95-137.
-
(1995)
International Journal of System Science
, vol.26
, pp. 95-137
-
-
Jacobs, D.A.1
Meerkov, S.M.2
-
74
-
-
0000034424
-
System-theoretic analysis of due-time performance in production systems
-
Jacobs, D.A. and Meerkov, S.M., 1995c. System-theoretic analysis of due-time performance in production systems. Mathematical Problems in Engineering, 1, 225-243.
-
(1995)
Mathematical Problems in Engineering
, vol.1
, pp. 225-243
-
-
Jacobs, D.A.1
Meerkov, S.M.2
-
75
-
-
0346798523
-
Improvability of serial production lines: Theory and application
-
G. Yin and Q. Zhang, eds. Berlin: Springer
-
Jacobs, D.A., Kuo, C.-T., Lim, J.-T. and Meerkov, S.M., 1996. Improvability of serial production lines: Theory and application, In: G. Yin and Q. Zhang, eds. Recent advances in control and optimization of manufacturing systems. Berlin: Springer, 121-143.
-
(1996)
Recent Advances in Control and Optimization of Manufacturing Systems
, pp. 121-143
-
-
Jacobs, D.A.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
76
-
-
0023416254
-
An approximate model of multistage automatic transfer lines with possible scrapping of workpieces
-
Jafari, M.A. and Shanthikumar, J.G., 1987. An approximate model of multistage automatic transfer lines with possible scrapping of workpieces. IIE Transactions, 19, 1157-1170.
-
(1987)
IIE Transactions
, vol.19
, pp. 1157-1170
-
-
Jafari, M.A.1
Shanthikumar, J.G.2
-
77
-
-
0024683335
-
Determination of optimal buffer storage capacities and optimal allocation in multistage automatic transfer lines
-
Jafari, M.A. and Shanthikumar, J.G., 1989. Determination of optimal buffer storage capacities and optimal allocation in multistage automatic transfer lines. IIE Transactions, 21, 130-135.
-
(1989)
IIE Transactions
, vol.21
, pp. 130-135
-
-
Jafari, M.A.1
Shanthikumar, J.G.2
-
78
-
-
0031701532
-
Performance analysis of assembly/disassembly systems with unreliable machines and random processing times
-
Jeong, K.-C. and Kim, Y.-D., 1998. Performance analysis of assembly/disassembly systems with unreliable machines and random processing times. IIE Transactions, 30, 41-53.
-
(1998)
IIE Transactions
, vol.30
, pp. 41-53
-
-
Jeong, K.-C.1
Kim, Y.-D.2
-
79
-
-
0032652306
-
An approximation method for performance analysis of assembly/disassembly systems with parallel-machine stations
-
Jeong, K.-C. and Kim, Y.-D., 1999. An approximation method for performance analysis of assembly/disassembly systems with parallel-machine stations. IIE Transactions, 31, 391-394.
-
(1999)
IIE Transactions
, vol.31
, pp. 391-394
-
-
Jeong, K.-C.1
Kim, Y.-D.2
-
80
-
-
23844552406
-
Information inaccuracy in inventory systems
-
Kang, Y. and Gershwin, S.B., 2005. Information inaccuracy in inventory systems. IIE Transactions, 37, 843-859.
-
(2005)
IIE Transactions
, vol.37
, pp. 843-859
-
-
Kang, Y.1
Gershwin, S.B.2
-
81
-
-
0029481403
-
Optimal robot operation and selection using quality and output trade-off
-
Khouja, M., Rabinowitz, G. and Mehrez, A., 1995. Optimal robot operation and selection using quality and output trade-off. International Journal of Advanced Manufacturing Technology, 10, 342-355.
-
(1995)
International Journal of Advanced Manufacturing Technology
, vol.10
, pp. 342-355
-
-
Khouja, M.1
Rabinowitz, G.2
Mehrez, A.3
-
82
-
-
0034630804
-
The equivalence of duplicate automated serial workstations and two-workstation tandem systems and its use in serial production line analysis
-
Kim, D.S. and Jung, B.L., 2000. The equivalence of duplicate automated serial workstations and two-workstation tandem systems and its use in serial production line analysis. International Journal of Production Research, 38, 1525-1538.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 1525-1538
-
-
Kim, D.S.1
Jung, B.L.2
-
83
-
-
0036646891
-
An upper bound for carriers in a three-workstation closed serial production system operating under production blocking
-
Kim, D.S., Kulkarny, D.M. and Lin, F., 2002. An upper bound for carriers in a three-workstation closed serial production system operating under production blocking. IEEE Transactions on Automatic Control, 47, 1134-1138.
-
(2002)
IEEE Transactions on Automatic Control
, vol.47
, pp. 1134-1138
-
-
Kim, D.S.1
Kulkarny, D.M.2
Lin, F.3
-
85
-
-
17444379378
-
Integrated quality and quantity model of a production line
-
Kim, J. and Gershwin, S.B., 2005. Integrated quality and quantity model of a production line. OR Spectrum, 27, 287-314.
-
(2005)
OR Spectrum
, vol.27
, pp. 287-314
-
-
Kim, J.1
Gershwin, S.B.2
-
86
-
-
0020915621
-
An algorithm for the computer control of production in a flexible manufacturing systems
-
Kimemia, J.G. and Gershwin, S.B., 1983. An algorithm for the computer control of production in a flexible manufacturing systems. IIE Transactions, 15, 353-362.
-
(1983)
IIE Transactions
, vol.15
, pp. 353-362
-
-
Kimemia, J.G.1
Gershwin, S.B.2
-
87
-
-
0000009851
-
Production lines and internal storage-a review
-
Koenigsberg, E., 1959. Production lines and internal storage-a review. Management Sciences, 5, 410-433.
-
(1959)
Management Sciences
, vol.5
, pp. 410-433
-
-
Koenigsberg, E.1
-
88
-
-
0034248987
-
Optimal rate allocation in unreliable, assembly disassembly production networks with blocking
-
Kouikoglou, V.S., 2000. Optimal rate allocation in unreliable, assembly disassembly production networks with blocking. IEEE Transactions on Robotics and Automation, 16, 429-434.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, pp. 429-434
-
-
Kouikoglou, V.S.1
-
89
-
-
34250817292
-
Analysis of automated flow line systems with repair crew interference
-
S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M Smith, eds. Dordrecht: Kluwer Academic
-
Kuhn, H., 2003. Analysis of automated flow line systems with repair crew interference, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 155-179.
-
(2003)
Analysis and Modeling of Manufacturing Systems
, pp. 155-179
-
-
Kuhn, H.1
-
90
-
-
21144477219
-
Re-entrant lines
-
Kumar, P.R., 1993. Re-entrant lines. Queueing systems, 13, 87-110.
-
(1993)
Queueing Systems
, vol.13
, pp. 87-110
-
-
Kumar, P.R.1
-
91
-
-
0035485518
-
Queueing network models in the design and analysis of semiconductor wafer fabs
-
Kumar, S. and Kumar, P.R., 2001. Queueing network models in the design and analysis of semiconductor wafer fabs. IEEE Transactions on Robotics and Automation, 17, 548-561.
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, pp. 548-561
-
-
Kumar, S.1
Kumar, P.R.2
-
93
-
-
0012354474
-
Bottlenecks in serial production lines: A systemtheoretic approach
-
Kuo, C.T., Lim, J.-T. and Meerkov, S.M., 1996. Bottlenecks in serial production lines: A systemtheoretic approach. Mathematical Problems in Engineering, 2, 233-276.
-
(1996)
Mathematical Problems in Engineering
, vol.2
, pp. 233-276
-
-
Kuo, C.T.1
Lim, J.-T.2
Meerkov, S.M.3
-
94
-
-
0002758765
-
Improvability theory for assembly systems: Two component-one assembly machine case
-
Kuo, C.-T., Lim, J.-T., Meerkov, S.M. and Park, E., 1997. Improvability theory for assembly systems: Two component-one assembly machine case. Mathematical Problems in Engineering, 3, 95-171.
-
(1997)
Mathematical Problems in Engineering
, vol.3
, pp. 95-171
-
-
Kuo, C.-T.1
Lim, J.-T.2
Meerkov, S.M.3
Park, E.4
-
96
-
-
0034405773
-
A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
-
Le Bihan, H. and Dallery, Y., 2000. A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93, 265-297.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 265-297
-
-
Le Bihan, H.1
Dallery, Y.2
-
97
-
-
70449687494
-
Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part I: The building block
-
S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
-
Levantesi, R., Matta, A. and Tolio, T., 2003a. Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part I: The building block, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 181-200.
-
(2003)
Analysis and Modeling of Manufacturing Systems
, pp. 181-200
-
-
Levantesi, R.1
Matta, A.2
Tolio, T.3
-
98
-
-
70449660276
-
Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part II: Decomposition
-
S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
-
Levantesi, R., Matta, A. and Tolio, T., 2003b. Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part II: decomposition, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 201-219.
-
(2003)
Analysis and Modeling of Manufacturing Systems
, pp. 201-219
-
-
Levantesi, R.1
Matta, A.2
Tolio, T.3
-
100
-
-
3242682462
-
Performance analysis of production systems with rework loops
-
Li, J., 2004a. Performance analysis of production systems with rework loops. IIE Transactions, 36, 755-765.
-
(2004)
IIE Transactions
, vol.36
, pp. 755-765
-
-
Li, J.1
-
101
-
-
7244239535
-
Modeling and analysis of manufacturing systems with parallel lines
-
Li, J., 2004b. Modeling and analysis of manufacturing systems with parallel lines. IEEE Transactions on Automatic Control, 49, 1824-1829.
-
(2004)
IEEE Transactions on Automatic Control
, vol.49
, pp. 1824-1829
-
-
Li, J.1
-
103
-
-
12844287589
-
Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems
-
Li, J., 2005. Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems. IEEE Transactions on Automation Sciences and Engineering, 2, 40-53.
-
(2005)
IEEE Transactions on Automation Sciences and Engineering
, vol.2
, pp. 40-53
-
-
Li, J.1
-
104
-
-
14044252065
-
Approximating feeder line reliability statistics in assembly systems with partial data collection
-
Li, J., Alden, J.M. and Rabaey, J.A., 2005. Approximating feeder line reliability statistics in assembly systems with partial data collection. Computers & Industrial Engineering, 48, 181-203.
-
(2005)
Computers & Industrial Engineering
, vol.48
, pp. 181-203
-
-
Li, J.1
Alden, J.M.2
Rabaey, J.A.3
-
105
-
-
33746409720
-
Quantitative analysis of transfer production line with Andon
-
Li, J. and Blumenfeld, D.E., 2006. Quantitative analysis of transfer production line with Andon. IIE Transactions, 38, 837-846.
-
(2006)
IIE Transactions
, vol.38
, pp. 837-846
-
-
Li, J.1
Blumenfeld, D.E.2
-
106
-
-
32644458004
-
Comparisons of two-machine line models in throughput analysis
-
Li, J., Blumenfeld, D.E. and Alden, J.M., 2006. Comparisons of two-machine line models in throughput analysis. International Journal of Production Research, 44, 1375-1398.
-
(2006)
International Journal of Production Research
, vol.44
, pp. 1375-1398
-
-
Li, J.1
Blumenfeld, D.E.2
Alden, J.M.3
-
107
-
-
33846300980
-
Manufacturing system design to improve quality buy rate: An automotive paint shop application study
-
Li, J., Blumenfeld, D.E. and Marin, S.P., 2007. Manufacturing system design to improve quality buy rate: An automotive paint shop application study. IEEE Transactions on Automation Science and Engineering, 4, 75-79.
-
(2007)
IEEE Transactions on Automation Science and Engineering
, vol.4
, pp. 75-79
-
-
Li, J.1
Blumenfeld, D.E.2
Marin, S.P.3
-
108
-
-
38049033423
-
Production system design for quality robustness: Theory and application in automotive paint shops
-
Li, J., Blumenfeld, D.E. and Marin, S.P., 2008. Production system design for quality robustness: Theory and application in automotive paint shops. IIE Transactions, 40, 162-176.
-
(2008)
IIE Transactions
, vol.40
, pp. 162-176
-
-
Li, J.1
Blumenfeld, D.E.2
Marin, S.P.3
-
109
-
-
4043097797
-
Random demand satisfaction by unreliable production-inventory-customer systems
-
Li, J., Enginarlar, E. and Meerkov, S.M., 2004. Random demand satisfaction by unreliable production-inventory-customer systems. Annals of Operations Research, 126, 159-175.
-
(2004)
Annals of Operations Research
, vol.126
, pp. 159-175
-
-
Li, J.1
Enginarlar, E.2
Meerkov, S.M.3
-
110
-
-
33645678279
-
Conservation of filtering in manufacturing systems with unreliable machines and finished goods buffers
-
Li, J., Enginarlar, E. and Meerkov, S.M., 2006. Conservation of filtering in manufacturing systems with unreliable machines and finished goods buffers. Mathematical Problems in Engineering, 2006, 1-12.
-
(2006)
Mathematical Problems in Engineering
, vol.2006
, pp. 1-12
-
-
Li, J.1
Enginarlar, E.2
Meerkov, S.M.3
-
111
-
-
27844593045
-
Modeling and analysis of a multiple product manufacturing system with split and merge
-
Li, J. and Huang, N., 2005. Modeling and analysis of a multiple product manufacturing system with split and merge. International Journal of Production Research, 43, 4049-4066.
-
(2005)
International Journal of Production Research
, vol.43
, pp. 4049-4066
-
-
Li, J.1
Huang, N.2
-
112
-
-
0034384883
-
Production variability in manufacturing systems: Bernoulli reliability case
-
Li, J. and Meerkov, S.M., 2000a. Production variability in manufacturing systems: Bernoulli reliability case. Annals of Operations Research, 93, 299-324.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 299-324
-
-
Li, J.1
Meerkov, S.M.2
-
113
-
-
0346992882
-
Bottlenecks with respect to due-time performance in pull serial production lines
-
Li, J. and Meerkov, S.M., 2000b. Bottlenecks with respect to due-time performance in pull serial production lines. Mathematical Problems in Engineering, 5, 479-498.
-
(2000)
Mathematical Problems in Engineering
, vol.5
, pp. 479-498
-
-
Li, J.1
Meerkov, S.M.2
-
114
-
-
0035428378
-
Customer demand satisfaction in production systems: A due-time performance approach
-
Li, J. and Meerkov, S.M., 2001. Customer demand satisfaction in production systems: A due-time performance approach. IEEE Transactions on Robotics and Automation, 17, 472-482.
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, pp. 472-482
-
-
Li, J.1
Meerkov, S.M.2
-
115
-
-
4043098920
-
Due-time performance in production systems with Markovian machines
-
S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
-
Li, J. and Meerkov, S.M., 2003. Due-time performance in production systems with Markovian machines, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 221-253.
-
(2003)
Analysis and Modeling of Manufacturing Systems
, pp. 221-253
-
-
Li, J.1
Meerkov, S.M.2
-
116
-
-
84885784965
-
Evaluation of throughput in serial production lines with nonexponential machines
-
E.K. Boukas and R. Malhame, eds. Berlin: Springer
-
Li, J. and Meerkov, S.M., 2005a. Evaluation of throughput in serial production lines with nonexponential machines, In: E.K. Boukas and R. Malhame, eds. Analysis, control and optimization of complex dynamic systems. Berlin: Springer, 55-82.
-
(2005)
Analysis, Control and Optimization of Complex Dynamic Systems
, pp. 55-82
-
-
Li, J.1
Meerkov, S.M.2
-
117
-
-
17444380674
-
On the coefficients of variation of up- and downtime of manufacturing equipment
-
Li, J. and Meerkov, S.M., 2005b. On the coefficients of variation of up- and downtime of manufacturing equipment. Mathematical Problems in Engineering, 2005, 1-6.
-
(2005)
Mathematical Problems in Engineering
, vol.2005
, pp. 1-6
-
-
Li, J.1
Meerkov, S.M.2
-
120
-
-
0025432495
-
Homogeneous, asymptotically reliable serial production lines: Theory and a case study
-
Lim, J.-T., Meerkov, S.M. and Top, F., 1990. Homogeneous, asymptotically reliable serial production lines: Theory and a case study. IEEE Transactions on Automatic Control, 35, 524-534.
-
(1990)
IEEE Transactions on Automatic Control
, vol.35
, pp. 524-534
-
-
Lim, J.-T.1
Meerkov, S.M.2
Top, F.3
-
121
-
-
0027539390
-
On asymptotic reliable closed serial production lines
-
Lim, J.-T. and Meerkov, S.M., 1993. On asymptotic reliable closed serial production lines. Control Engineering Practices, 1, 147-152.
-
(1993)
Control Engineering Practices
, vol.1
, pp. 147-152
-
-
Lim, J.-T.1
Meerkov, S.M.2
-
122
-
-
0033078608
-
Steady-state performance analysis of serial transfer lines subject to machine and buffer failure
-
Lipset, R., Van Til, R.P. and Sengupta, S., 1999. Steady-state performance analysis of serial transfer lines subject to machine and buffer failure. IEEE Transactions on Automatic Control, 44, 319-325.
-
(1999)
IEEE Transactions on Automatic Control
, vol.44
, pp. 319-325
-
-
Lipset, R.1
Van Til, R.P.2
Sengupta, S.3
-
123
-
-
0342524337
-
A zero-buffer equivalence technique for decomposing queueing networks with blocking
-
H.G. Perros and T. Altiok, eds. Amsterdam: North-Holland
-
Liu, X.-G. and Buzacott, J.A., 1989. A zero-buffer equivalence technique for decomposing queueing networks with blocking, In: H.G. Perros and T. Altiok, eds. Queueing networks with blocking. Amsterdam: North-Holland, 87-104.
-
(1989)
Queueing Networks with Blocking
, pp. 87-104
-
-
Liu, X.-G.1
Buzacott, J.A.2
-
124
-
-
0025414457
-
Approximate models of assembly systems with finite inventory banks
-
Liu, X.-G. and Buzacott, J.A., 1990. Approximate models of assembly systems with finite inventory banks. European Journal of Operational Research, 45, 143-154.
-
(1990)
European Journal of Operational Research
, vol.45
, pp. 143-154
-
-
Liu, X.-G.1
Buzacott, J.A.2
-
125
-
-
33644619196
-
A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes
-
Mandroli, S.S., Shrivastava, A.K. and Ding, Y., 2006. A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes. IIE Transactions, 38, 309-328
-
(2006)
IIE Transactions
, vol.38
, pp. 309-328
-
-
Mandroli, S.S.1
Shrivastava, A.K.2
Ding, Y.3
-
126
-
-
17444381621
-
Automated flow lines with shared buffer
-
Matta, A., Runchina, M. and Tolio, T., 2005. Automated flow lines with shared buffer. OR Spectrum, 27, 265-286.
-
(2005)
OR Spectrum
, vol.27
, pp. 265-286
-
-
Matta, A.1
Runchina, M.2
Tolio, T.3
-
127
-
-
38049075378
-
Transient behavior of serial production lines with Bernoulli machines
-
Meerkov, S.M. and Zhang, L., 2008. Transient behavior of serial production lines with Bernoulli machines. IIE Transactions, 40, 297-312.
-
(2008)
IIE Transactions
, vol.40
, pp. 297-312
-
-
Meerkov, S.M.1
Zhang, L.2
-
128
-
-
0000357748
-
Stochastic theory of a fluid model of producers and consumers coupled by a buffer
-
Mitra, D., 1988. Stochastic theory of a fluid model of producers and consumers coupled by a buffer. Advanced Applied Probabilities, 20, 646-676.
-
(1988)
Advanced Applied Probabilities
, vol.20
, pp. 646-676
-
-
Mitra, D.1
-
130
-
-
0001441631
-
Modeling reentrant manufacturing system with inspection stations
-
Narahari, Y. and Khan, L.M., 1996. Modeling reentrant manufacturing system with inspection stations. Journal of Manufacturing Systems, 15, 367-378.
-
(1996)
Journal of Manufacturing Systems
, vol.15
, pp. 367-378
-
-
Narahari, Y.1
Khan, L.M.2
-
133
-
-
34247627882
-
Local improvements that degrade system performance: Case studies and discussion for throughput analysis
-
Owen, J.H. and Huang, N., 2007. Local improvements that degrade system performance: case studies and discussion for throughput analysis. International Journal of Production Research, 45, 2351-2364.
-
(2007)
International Journal of Production Research
, vol.45
, pp. 2351-2364
-
-
Owen, J.H.1
Huang, N.2
-
134
-
-
67749120919
-
Analysis of two-valve fluid-flow systems with general repair times
-
S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
-
Özdõgru, U. and Altiok, T., 2003. Analysis of two-valve fluid-flow systems with general repair times, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 255-288.
-
(2003)
Analysis and Modeling of Manufacturing Systems
, pp. 255-288
-
-
Özdõgru, U.1
Altiok, T.2
-
136
-
-
0030570340
-
Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
-
Papadopoulos, H.T. and Heavey, C., 1996. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92, 1-27.
-
(1996)
European Journal of Operational Research
, vol.92
, pp. 1-27
-
-
Papadopoulos, H.T.1
Heavey, C.2
-
137
-
-
0032188602
-
Analysis of production lines with Coxian service times and no intermediate buffers
-
Papadopoulos, H.T., 1998. Analysis of production lines with Coxian service times and no intermediate buffers. Naval Research Logistics, 45, 669-685.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 669-685
-
-
Papadopoulos, H.T.1
-
138
-
-
0035400771
-
Modeling and analysis of an unreliable flow line composed of parallel-machine stages
-
Patchong, A. and Willaeys, D., 2001. Modeling and analysis of an unreliable flow line composed of parallel-machine stages. IIE Transactions, 33, 559-568.
-
(2001)
IIE Transactions
, vol.33
, pp. 559-568
-
-
Patchong, A.1
Willaeys, D.2
-
146
-
-
0041326349
-
Constraint management in manufacturing systems
-
Roser, C., Nakano, M. and Tanaka, M., 2003. Constraint management in manufacturing systems. JSME International Journal Series C-Mechanical Systems Machine Elements and Manufacturing, 46, 73-80.
-
(2003)
JSME International Journal Series C-Mechanical Systems Machine Elements and Manufacturing
, vol.46
, pp. 73-80
-
-
Roser, C.1
Nakano, M.2
Tanaka, M.3
-
147
-
-
0742286690
-
Decomposition/aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines
-
Sadr, J. and Malhame, R.P., 2004a. Decomposition/aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines. IEEE Transactions on Automatic Control, 49, 68-81.
-
(2004)
IEEE Transactions on Automatic Control
, vol.49
, pp. 68-81
-
-
Sadr, J.1
Malhame, R.P.2
-
148
-
-
4043126082
-
Unreliable transfer lines: Decomposition/aggregation and optimization
-
Sadr, J. and Malhame, R.P., 2004b. Unreliable transfer lines: decomposition/aggregation and optimization. Annals of Operations Research, 125, 167-190. (Pubitemid 39063656)
-
(2004)
Annals of Operations Research
, vol.125
, Issue.1-4
, pp. 167-190
-
-
Sadr, J.1
Malhame, R.P.2
-
149
-
-
0009455220
-
Influence of storage bin capacity on the average standstill time of a production line
-
Sevastyanov, B.A., 1962. Influence of storage bin capacity on the average standstill time of a production line. Theory of Probability Applications, 6, 429-438.
-
(1962)
Theory of Probability Applications
, vol.6
, pp. 429-438
-
-
Sevastyanov, B.A.1
-
150
-
-
0003228793
-
Availability and average inventory of balanced assembly-like flow systems
-
Simon, J.T. and Hopp, W.J., 1991. Availability and average inventory of balanced assembly-like flow systems. IIE Transactions, 23, 161-168.
-
(1991)
IIE Transactions
, vol.23
, pp. 161-168
-
-
Simon, J.T.1
Hopp, W.J.2
-
151
-
-
0033640801
-
A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device
-
Suliman, S.M.A., 1999. A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device. International Journal of Production Economics, 63, 69-81.
-
(1999)
International Journal of Production Economics
, vol.63
, pp. 69-81
-
-
Suliman, S.M.A.1
-
153
-
-
0032484451
-
Effects of the variability on the due-time performance of production lines
-
Tan, B., 1998. Effects of the variability on the due-time performance of production lines. International Journal of Production Economics, 54, 87-100.
-
(1998)
International Journal of Production Economics
, vol.54
, pp. 87-100
-
-
Tan, B.1
-
154
-
-
0035831088
-
A three-station merge system with unreliable stations and a shared buffer
-
Tan, B., 2001. A three-station merge system with unreliable stations and a shared buffer. Mathematical and Computer Modeling, 33, 1011-1026.
-
(2001)
Mathematical and Computer Modeling
, vol.33
, pp. 1011-1026
-
-
Tan, B.1
-
155
-
-
0036576750
-
Production control of a pull system with production and demand uncertainty
-
Tan, B., 2002. Production control of a pull system with production and demand uncertainty. IEEE Transactions on Automatic Control, 47, 779-783.
-
(2002)
IEEE Transactions on Automatic Control
, vol.47
, pp. 779-783
-
-
Tan, B.1
-
156
-
-
0034323738
-
Modelling and scheduling of an asynchronous cyclic production line with multiple parts
-
Tan, B. and Karabati, S., 2001. Modelling and scheduling of an asynchronous cyclic production line with multiple parts. Journal of the Operational Research Society, 51, 1296-1308.
-
(2001)
Journal of the Operational Research Society
, vol.51
, pp. 1296-1308
-
-
Tan, B.1
Karabati, S.2
-
157
-
-
0031259221
-
A decomposition model for continuous materials flow production systems
-
Tan, B. and Yeralan, S., 1997. A decomposition model for continuous materials flow production. International Journal of Production Research, 35, 2759-2772. (Pubitemid 127564041)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.10
, pp. 2759-2772
-
-
Tan, B.1
Yeralan, S.2
-
158
-
-
0035311479
-
Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production
-
Tempelmeier, H. and Burger, M., 2001. Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production. IIE Transactions, 33, 293-302.
-
(2001)
IIE Transactions
, vol.33
, pp. 293-302
-
-
Tempelmeier, H.1
Burger, M.2
-
160
-
-
0036160410
-
Analysis of two-machine lines with multiple failure modes
-
Tolio, T., Matta, A. and Gershwin, S.B., 2002. Analysis of two-machine lines with multiple failure modes. IIE Transactions, 34, 51-62.
-
(2002)
IIE Transactions
, vol.34
, pp. 51-62
-
-
Tolio, T.1
Matta, A.2
Gershwin, S.B.3
-
161
-
-
0032203962
-
Analysis of production systems when run length influences product quality
-
Urban, T.L., 1998. Analysis of production systems when run length influences product quality. International Journal of Production Research, 36, 3085-3094.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 3085-3094
-
-
Urban, T.L.1
-
164
-
-
0030105320
-
Inspection allocation in manufacturing systems using stochastic techniques
-
Viswanadham, N., Sharma, S.M. and Taneja, M., 1996. Inspection allocation in manufacturing systems using stochastic techniques. IEEE Transactions on Systems, Man, and Cybernetics- Part A: Systems and Humans, 36, 222-230.
-
(1996)
IEEE Transactions on Systems, Man, and Cybernetics- Part A: Systems and Humans
, vol.36
, pp. 222-230
-
-
Viswanadham, N.1
Sharma, S.M.2
Taneja, M.3
-
167
-
-
1842557206
-
Approximate analysis of production lines with loop, scrapping and serial/parallel blocks
-
Tinos Island, Greece
-
Yang, S., Hu, S.J. and Koren, Y., 1999. Approximate analysis of production lines with loop, scrapping and serial/parallel blocks. In: 2nd international conference on analysis and modeling of manufacturing systems, Tinos Island, Greece.
-
(1999)
2nd International Conference on Analysis and Modeling of Manufacturing Systems
-
-
Yang, S.1
Hu, S.J.2
Koren, Y.3
-
168
-
-
0034418978
-
Modeling and analysis of multi-stage transfer lines with unreliable machines and finite buffers
-
Yang, S., Wu, C. and Hu, S.J., 2000. Modeling and analysis of multi-stage transfer lines with unreliable machines and finite buffers. Annals of Operations Research, 93, 405-421.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 405-421
-
-
Yang, S.1
Wu, C.2
Hu, S.J.3
-
169
-
-
0030916278
-
Analysis of multistation production systems with limited buffer capacity part 1: The subsystem model
-
DOI 10.1016/S0895-7177(97)00052-6, PII S0895717797000526
-
Yeralan, S. and Tan, B., 1997a. Analysis of Multistation production systems with limited buffer capacity. Part 1: The subsystem model. Mathematical Computer Modelling, 25, 109-122. (Pubitemid 27253446)
-
(1997)
Mathematical and Computer Modelling
, vol.25
, Issue.7
, pp. 109-122
-
-
Yeralan, S.1
Tan, B.2
-
170
-
-
0030916278
-
Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method
-
DOI 10.1016/S0895-7177(97)00089-7, PII S0895717797000897
-
Yerelan, S. and Tan, B., 1997b. Analysis of multistation production systems with limited buffer capacity. Part 2: The decomposition method. Mathematics and Computer Modeling, 25, 109-123. (Pubitemid 27299550)
-
(1997)
Mathematical and Computer Modelling
, vol.25
, Issue.11
, pp. 109-123
-
-
Tan, B.1
Yeralan, S.2
|