메뉴 건너뛰기




Volumn 47, Issue 14, 2009, Pages 3823-3851

Throughput analysis of production systems: Recent advances and future topics

Author keywords

Manufacturing systems; Production modelling

Indexed keywords

ANALYTICAL METHOD; APPROXIMATION METHODS; AUTOMOTIVE MANUFACTURING; COMPLEX SYSTEMS; FINITE BUFFER; MANUFACTURING SYSTEM; MANUFACTURING SYSTEMS; OPERATION AND MANAGEMENT; PARALLEL LINE; PERFORMANCE EVALUATION; PRODUCTION SYSTEM; RESEARCH TOPICS; SERIAL LINE; SPLIT-AND-MERGE; THROUGHPUT ANALYSIS; UNRELIABLE MACHINE;

EID: 70449688145     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701829752     Document Type: Article
Times cited : (314)

References (170)
  • 2
    • 0028074177 scopus 로고
    • A study of the continuous flow model of production lines with unreliable machines and finite buffers
    • Alvarez-Vargas, R., Dallery, Y. and David, R., 1994. A study of the continuous flow model of production lines with unreliable machines and finite buffers. Journal of Manufacturing Systems, 13, 221-234.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 221-234
    • Alvarez-Vargas, R.1    Dallery, Y.2    David, R.3
  • 5
    • 0043171613 scopus 로고
    • A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity
    • Blumenfeld, D.E., 1990. A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity. International Journal of Production Research, 28, 1163-1182.
    • (1990) International Journal of Production Research , vol.28 , pp. 1163-1182
    • Blumenfeld, D.E.1
  • 6
    • 31044437924 scopus 로고    scopus 로고
    • An analytical formula for throughput of a production line with identical stations and random failures
    • Blumenfeld, D.E. and Li, J., 2005. An analytical formula for throughput of a production line with identical stations and random failures. Mathematical Problems in Engineering, 2005, 293-308.
    • (2005) Mathematical Problems in Engineering , vol.2005 , pp. 293-308
    • Blumenfeld, D.E.1    Li, J.2
  • 7
    • 0028443105 scopus 로고
    • Effects of errors and delays in inventory reporting on production system performance
    • Bonney, M., Poplewell, K. and Matoug, M., 1994. Effects of errors and delays in inventory reporting on production system performance. International Journal of Production Economics, 35, 93-105.
    • (1994) International Journal of Production Economics , vol.35 , pp. 93-105
    • Bonney, M.1    Poplewell, K.2    Matoug, M.3
  • 8
    • 0034633396 scopus 로고    scopus 로고
    • Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy
    • Bonvik, A.M., Dallery, Y. and Gershwin, S.B., 2000. Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy. International Journal of Production Research, 38, 2845-2869.
    • (2000) International Journal of Production Research , vol.38 , pp. 2845-2869
    • Bonvik, A.M.1    Dallery, Y.2    Gershwin, S.B.3
  • 10
    • 0015603944 scopus 로고
    • Production flow line systems design-a review
    • Buxey, G.M., Slack, N.D. and Wild, R., 1973. Production flow line systems design-a review. AIIE Transactions, 5, 37-48.
    • (1973) AIIE Transactions , vol.5 , pp. 37-48
    • Buxey, G.M.1    Slack, N.D.2    Wild, R.3
  • 11
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks: A review and comarison
    • Buzacott, J.A. and Hanifin, L.E., 1978. Models of automatic transfer lines with inventory banks: A review and comarison. AIIE Transactions, 10, 197-207.
    • (1978) AIIE Transactions , vol.10 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 12
    • 0023533125 scopus 로고
    • Matrix-geometric and recursive algorithm solution of a twostage unreliable flow line
    • Buzacott, J.A. and Kostelski, D., 1987. Matrix-geometric and recursive algorithm solution of a twostage unreliable flow line. IIE Transactions, 19, 429-438.
    • (1987) IIE Transactions , vol.19 , pp. 429-438
    • Buzacott, J.A.1    Kostelski, D.2
  • 14
    • 70449631886 scopus 로고    scopus 로고
    • Analytical modeling and analysis of flexible manufacturing systems considering system component failure/repair rates
    • Chen, F.F. and Thinphangnga, S., 1996. Analytical modeling and analysis of flexible manufacturing systems considering system component failure/repair rates. Jounral of Manufacturing Systems, 15, 143-154.
    • (1996) Jounral of Manufacturing Systems , vol.15 , pp. 143-154
    • Chen, F.F.1    Thinphangnga, S.2
  • 16
    • 33646379590 scopus 로고    scopus 로고
    • Bernoulli serial production lines with quality control devices: Theory and application
    • Article No. 81950
    • Chiang, S.-Y., 2006. Bernoulli serial production lines with quality control devices: Theory and application. Mathematical Problems in Engineering, 2006, Article No. 81950.
    • (2006) Mathematical Problems in Engineering, 2006
    • Chiang, S.-Y.1
  • 19
    • 0006506394 scopus 로고    scopus 로고
    • Improvability theory of assembly systems. I: Problem formulation and performance evaluation
    • Chiang, S.-Y., Kuo, C.-T., Lim, J.-T. and Meerkov, S.M., 2000b. Improvability theory of assembly systems. I: Problem formulation and performance evaluation. Mathematical Problems in Engineering, 6, 321-357.
    • (2000) Mathematical Problems in Engineering , vol.6 , pp. 321-357
    • Chiang, S.-Y.1    Kuo, C.-T.2    Lim, J.-T.3    Meerkov, S.M.4
  • 20
    • 0345795631 scopus 로고    scopus 로고
    • Improvability theory of assembly systems. II: Improvability indicators and case study
    • Chiang, S.-Y., Kuo, C.-T., Lim, J.-T. and Meerkov, S.M., 2000c. Improvability theory of assembly systems. II: Improvability indicators and case study. Mathematical Problems in Engineering, 6, 359-393.
    • (2000) Mathematical Problems in Engineering , vol.6 , pp. 359-393
    • Chiang, S.-Y.1    Kuo, C.-T.2    Lim, J.-T.3    Meerkov, S.M.4
  • 22
    • 0023366315 scopus 로고
    • A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
    • Choong, Y.F. and Gershwin, S.B., 1987. A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. IIE Transactions, 19, 150-159.
    • (1987) IIE Transactions , vol.19 , pp. 150-159
    • Choong, Y.F.1    Gershwin, S.B.2
  • 23
    • 17444424631 scopus 로고    scopus 로고
    • Performance evaluation of production lines with finite buffer capacity producing two different products
    • Colledani, M., Matta, A. and Tolio, T., 2005. Performance evaluation of production lines with finite buffer capacity producing two different products. OR Spectrum, 27, 243-263.
    • (2005) OR Spectrum , vol.27 , pp. 243-263
    • Colledani, M.1    Matta, A.2    Tolio, T.3
  • 26
    • 0025446548 scopus 로고
    • Taking into account delays in buffers for analytical performance evaluation of transfer lines
    • Commault, C. and Semery, A., 1990. Taking into account delays in buffers for analytical performance evaluation of transfer lines. IIE Transactions, 22, 133-142.
    • (1990) IIE Transactions , vol.22 , pp. 133-142
    • Commault, C.1    Semery, A.2
  • 29
    • 0024070564 scopus 로고
    • An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R. and Xie, X.-L., 1988. An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20, 280-283.
    • (1988) IIE Transactions , vol.20 , pp. 280-283
    • Dallery, Y.1    David, R.2    Xie, X.-L.3
  • 30
    • 0024732503 scopus 로고
    • Approximate analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R. and Xie, X.-L., 1989. Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34, 943-953.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , pp. 943-953
    • Dallery, Y.1    David, R.2    Xie, X.-L.3
  • 31
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery, Y. and Gershwin, S.B., 1992. Manufacturing flow line systems: A review of models and analytical results. Queuing Systems, 12, 3-94.
    • (1992) Queuing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 32
    • 0033097497 scopus 로고    scopus 로고
    • An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
    • Dallery, Y. and Le Bihan, H., 1999. An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. International Journal of Production Research, 37, 1093-1117.
    • (1999) International Journal of Production Research , vol.37 , pp. 1093-1117
    • Dallery, Y.1    Le Bihan, H.2
  • 33
    • 3342989017 scopus 로고
    • Computationally efficient approximations for balanced flowlines with finite intermediate buffers
    • De Kok, A.G., 1990. Computationally efficient approximations for balanced flowlines with finite intermediate buffers. International Journal of Production Research, 28, 401-419.
    • (1990) International Journal of Production Research , vol.28 , pp. 401-419
    • De Kok, A.G.1
  • 35
    • 0023997862 scopus 로고
    • An improved algorithm to approximate the behavior of flow lines
    • De Koster, M.B.M., 1988. An improved algorithm to approximate the behavior of flow lines. International Journal of Production Research, 26, 691-700.
    • (1988) International Journal of Production Research , vol.26 , pp. 691-700
    • De Koster, M.B.M.1
  • 36
    • 0000628123 scopus 로고    scopus 로고
    • Optimization of process improvement and inspection location for serial manufacturing
    • Deliman, N.C. and Feldman, R.M., 1996. Optimization of process improvement and inspection location for serial manufacturing. International Journal of Production Research, 34, 395-405.
    • (1996) International Journal of Production Research , vol.34 , pp. 395-405
    • Deliman, N.C.1    Feldman, R.M.2
  • 37
    • 0031232866 scopus 로고    scopus 로고
    • Control of a stochastic production system with estimated parameters
    • Denardo, E.V. and Tang, C.S., 1997. Control of a stochastic production system with estimated parameters. Management Science, 43, 1296-1307.
    • (1997) Management Science , vol.43 , pp. 1296-1307
    • Denardo, E.V.1    Tang, C.S.2
  • 38
  • 39
    • 33748302072 scopus 로고    scopus 로고
    • Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures
    • Diamantidis, A.C. and Papadopoulos, C.T., 2006. Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures. Computer & Industrial Engineering, 50, 466-487.
    • (2006) Computer & Industrial Engineering , vol.50 , pp. 466-487
    • Diamantidis, A.C.1    Papadopoulos, C.T.2
  • 40
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliable machines and finite buffers
    • Di Mascolo, M., David, R. and Dallery, Y., 1991. Modeling and analysis of assembly systems with unreliable machines and finite buffers. IIE Transactions, 23, 315-330.
    • (1991) IIE Transactions , vol.23 , pp. 315-330
    • Di Mascolo, M.1    David, R.2    Dallery, Y.3
  • 41
    • 0028457112 scopus 로고
    • Estimating the throughput of a cyclic assembly system
    • Duenyas, I., 1994. Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32, 1403-1419.
    • (1994) International Journal of Production Research , vol.32 , pp. 1403-1419
    • Duenyas, I.1
  • 42
    • 0006454724 scopus 로고
    • CONWIP assembly with deterministic processing and random outages
    • Duenyas, I. and Hopp, W.J., 1992. CONWIP assembly with deterministic processing and random outages. IIE Transactions, 24, 97-109.
    • (1992) IIE Transactions , vol.24 , pp. 97-109
    • Duenyas, I.1    Hopp, W.J.2
  • 43
    • 0034291568 scopus 로고    scopus 로고
    • Transfer line design with uncertain machine performance information
    • Feit, E.M. and Wu, S.D., 2000. Transfer line design with uncertain machine performance information. IEEE Transactions on Robotics and Automation, 16, 581-587.
    • (2000) IEEE Transactions on Robotics and Automation , vol.16 , pp. 581-587
    • Feit, E.M.1    Wu, S.D.2
  • 44
    • 0030192549 scopus 로고    scopus 로고
    • Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers
    • Frein, Y., Commault, C. and Dallery, Y., 1996. Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers. IIE Transactions, 28, 545-554.
    • (1996) IIE Transactions , vol.28 , pp. 545-554
    • Frein, Y.1    Commault, C.2    Dallery, Y.3
  • 45
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Gershwin, S.B., 1987a. An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35, 291-305.
    • (1987) Operations Research , vol.35 , pp. 291-305
    • Gershwin, S.B.1
  • 46
    • 0008236264 scopus 로고
    • Representation and analysis of transfer lines with machines that have different processing rates
    • Gershwin, S.B., 1987b. Representation and analysis of transfer lines with machines that have different processing rates. Annals of Operations Research, 9, 511-530.
    • (1987) Annals of Operations Research , vol.9 , pp. 511-530
    • Gershwin, S.B.1
  • 47
    • 0002283864 scopus 로고
    • An efficient decomposition algorithm for unreliable tandem queuing system with finite buffers
    • H.G. Perros and T. Altiok, eds. Amsterdam: Elsevier
    • Gershwin, S.B., 1989. An efficient decomposition algorithm for unreliable tandem queuing system with finite buffers, In: H.G. Perros and T. Altiok, eds. Queueing networks with blocking. Amsterdam: Elsevier, 127-147.
    • (1989) Queueing Networks with Blocking , pp. 127-147
    • Gershwin, S.B.1
  • 48
    • 0000440767 scopus 로고
    • Assembly/disassembly systems: An efficient decomposition algorithm for treestructured networks
    • Gershwin, S.B., 1991. Assembly/disassembly systems: An efficient decomposition algorithm for treestructured networks. IIE Transactions, 23, 315-331.
    • (1991) IIE Transactions , vol.23 , pp. 315-331
    • Gershwin, S.B.1
  • 50
    • 0034288452 scopus 로고    scopus 로고
    • Design and operation of manufacturing systems-the control-point policy
    • Gershwin, S.B., 2000. Design and operation of manufacturing systems-the control-point policy. IIE Transactions, 32, 891-906.
    • (2000) IIE Transactions , vol.32 , pp. 891-906
    • Gershwin, S.B.1
  • 51
    • 0034397418 scopus 로고    scopus 로고
    • A decomposition method for analyzing inhomogeneous assembly/disassembly systems
    • Gershwin, S.B. and Burman, M.H., 2000. A decomposition method for analyzing inhomogeneous assembly/disassembly systems. Annals of Operations Research, 93, 91-115.
    • (2000) Annals of Operations Research , vol.93 , pp. 91-115
    • Gershwin, S.B.1    Burman, M.H.2
  • 54
    • 34249315492 scopus 로고    scopus 로고
    • An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers
    • Gershwin, S.B. and Werner, L.M., 2007. An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers. International Journal of Production Research, 45, 3085-3111.
    • (2007) International Journal of Production Research , vol.45 , pp. 3085-3111
    • Gershwin, S.B.1    Werner, L.M.2
  • 55
    • 0027555001 scopus 로고
    • Analysis of behaviour of an unreliable n-stage transfer line with (n-1) inter-storage buffers
    • Glassey, C.R. and Hong, Y., 1993. Analysis of behaviour of an unreliable n-stage transfer line with (n-1) inter-storage buffers. International Journal of Production Research, 31, 519-530.
    • (1993) International Journal of Production Research , vol.31 , pp. 519-530
    • Glassey, C.R.1    Hong, Y.2
  • 56
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • Govil, M.C. and Fu, M.C., 1996. Queueing theory in manufacturing: A survey. Journal of Manufacturing Systems, 18, 214-240.
    • (1996) Journal of Manufacturing Systems , vol.18 , pp. 214-240
    • Govil, M.C.1    Fu, M.C.2
  • 57
    • 0032162842 scopus 로고    scopus 로고
    • Performance analysis of serial production lines with quality inspection machines
    • Han, M.-S., Lim, J.-T. and Park, D.-J., 1998. Performance analysis of serial production lines with quality inspection machines. International Journal of System Science, 29, 939-951.
    • (1998) International Journal of System Science , vol.29 , pp. 939-951
    • Han, M.-S.1    Lim, J.-T.2    Park, D.-J.3
  • 58
    • 0005311431 scopus 로고    scopus 로고
    • Performance analysis of flow lines with non-linear flow of material
    • Berlin: Springer
    • Helber, S., 1999. Performance analysis of flow lines with non-linear flow of material, In: Lecture notes in economics and mathematical systems. Berlin: Springer.
    • (1999) Lecture Notes in Economics and Mathematical Systems
    • Helber, S.1
  • 59
    • 0034381835 scopus 로고    scopus 로고
    • Approximate analysis of unreliable transfer lines with splits in the flow of material
    • Helber, S., 2000. Approximate analysis of unreliable transfer lines with splits in the flow of material. Annals of Operations Research, 93, 217-243.
    • (2000) Annals of Operations Research , vol.93 , pp. 217-243
    • Helber, S.1
  • 60
    • 17444379379 scopus 로고    scopus 로고
    • Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity
    • Helber, S., 2005. Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity. OR Spectrum, 27, 221-242.
    • (2005) OR Spectrum , vol.27 , pp. 221-242
    • Helber, S.1
  • 61
    • 4043121812 scopus 로고    scopus 로고
    • A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
    • Helber, S. and Jusic, H., 2004. A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material. Annals of Operations Research, 125, 117-139.
    • (2004) Annals of Operations Research , vol.125 , pp. 117-139
    • Helber, S.1    Jusic, H.2
  • 62
    • 33746836791 scopus 로고    scopus 로고
    • Exact analysis of a continuous material merge system with limited buffer capacity and three stations
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
    • Helber, S. and Mehrtens, N., 2003. Exact analysis of a continuous material merge system with limited buffer capacity and three stations, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modleing of manufacturing systems. Dordrecht: Kluwer Academic, 85-121.
    • (2003) Analysis and Modleing of Manufacturing Systems , pp. 85-121
    • Helber, S.1    Mehrtens, N.2
  • 63
    • 0002058236 scopus 로고
    • The analysis of a production line with unreliable machines and random processing times
    • Hong, Y., Glassey, C.R. and Seong, D., 1992. The analysis of a production line with unreliable machines and random processing times. IIE Transactions, 24, 77-83.
    • (1992) IIE Transactions , vol.24 , pp. 77-83
    • Hong, Y.1    Glassey, C.R.2    Seong, D.3
  • 64
    • 0036468703 scopus 로고    scopus 로고
    • Using an optimized queueing network model to support wafer fab design
    • Hopp, W.J., Spearman, M.L., Chayet, S., Donohue, K.L. and Gel, E.S., 2002. Using an optimized queueing network model to support wafer fab design. IIE Transactions, 34, 119-130.
    • (2002) IIE Transactions , vol.34 , pp. 119-130
    • Hopp, W.J.1    Spearman, M.L.2    Chayet, S.3    Donohue, K.L.4    Gel, E.S.5
  • 66
    • 0017504870 scopus 로고
    • The output of a two-stage system with unreliable machines and limited storage
    • Ignall, E. and Silver, A., 1977. The output of a two-stage system with unreliable machines and limited storage. AIIE Transactions, 9, 183-188.
    • (1977) AIIE Transactions , vol.9 , pp. 183-188
    • Ignall, E.1    Silver, A.2
  • 67
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • Inman, R.R., 1999. Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operation Management, 4, 409-432.
    • (1999) Production and Operation Management , vol.4 , pp. 409-432
    • Inman, R.R.1
  • 68
    • 0242269872 scopus 로고    scopus 로고
    • Designing production systems for quality: Research opportunities from automotive industry perspective
    • Inman, R.R., Blumenfeld, D.E., Huang, N. and Li, J., 2003. Designing production systems for quality: Research opportunities from automotive industry perspective. International Journal of Production Research, 41, 1953-1971.
    • (2003) International Journal of Production Research , vol.41 , pp. 1953-1971
    • Inman, R.R.1    Blumenfeld, D.E.2    Huang, N.3    Li, J.4
  • 69
    • 0023401973 scopus 로고
    • The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage
    • Iyama, T. and Ito, S., 1987. The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage. International Journal of Production Research, 25, 1157-1179.
    • (1987) International Journal of Production Research , vol.25 , pp. 1157-1179
    • Iyama, T.1    Ito, S.2
  • 71
    • 0242265534 scopus 로고
    • Asymptotically reliable serial production lines with a quality control system
    • Jacobs, D.A. and Meerkov, S.M., 1991. Asymptotically reliable serial production lines with a quality control system. Computers Mathematics and Applications, 21, 85-90.
    • (1991) Computers Mathematics and Applications , vol.21 , pp. 85-90
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 72
    • 0029291550 scopus 로고
    • A system-theoretic property of serial production lines: Improvability
    • Jacobs, D.A. and Meerkov, S.M., 1995a. A system-theoretic property of serial production lines: Improvability. International Journal of System Science, 26, 95-137.
    • (1995) International Journal of System Science , vol.26 , pp. 95-137
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 73
    • 0009432605 scopus 로고
    • Mathematical theory of improvability for production systems
    • Jacobs, D.A. and Meerkov, S.M., 1995b. Mathematical theory of improvability for production systems. Mathematical Problems in Engineering, 1, 95-137.
    • (1995) Mathematical Problems in Engineering , vol.1 , pp. 95-137
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 74
    • 0000034424 scopus 로고
    • System-theoretic analysis of due-time performance in production systems
    • Jacobs, D.A. and Meerkov, S.M., 1995c. System-theoretic analysis of due-time performance in production systems. Mathematical Problems in Engineering, 1, 225-243.
    • (1995) Mathematical Problems in Engineering , vol.1 , pp. 225-243
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 76
    • 0023416254 scopus 로고
    • An approximate model of multistage automatic transfer lines with possible scrapping of workpieces
    • Jafari, M.A. and Shanthikumar, J.G., 1987. An approximate model of multistage automatic transfer lines with possible scrapping of workpieces. IIE Transactions, 19, 1157-1170.
    • (1987) IIE Transactions , vol.19 , pp. 1157-1170
    • Jafari, M.A.1    Shanthikumar, J.G.2
  • 77
    • 0024683335 scopus 로고
    • Determination of optimal buffer storage capacities and optimal allocation in multistage automatic transfer lines
    • Jafari, M.A. and Shanthikumar, J.G., 1989. Determination of optimal buffer storage capacities and optimal allocation in multistage automatic transfer lines. IIE Transactions, 21, 130-135.
    • (1989) IIE Transactions , vol.21 , pp. 130-135
    • Jafari, M.A.1    Shanthikumar, J.G.2
  • 78
    • 0031701532 scopus 로고    scopus 로고
    • Performance analysis of assembly/disassembly systems with unreliable machines and random processing times
    • Jeong, K.-C. and Kim, Y.-D., 1998. Performance analysis of assembly/disassembly systems with unreliable machines and random processing times. IIE Transactions, 30, 41-53.
    • (1998) IIE Transactions , vol.30 , pp. 41-53
    • Jeong, K.-C.1    Kim, Y.-D.2
  • 79
    • 0032652306 scopus 로고    scopus 로고
    • An approximation method for performance analysis of assembly/disassembly systems with parallel-machine stations
    • Jeong, K.-C. and Kim, Y.-D., 1999. An approximation method for performance analysis of assembly/disassembly systems with parallel-machine stations. IIE Transactions, 31, 391-394.
    • (1999) IIE Transactions , vol.31 , pp. 391-394
    • Jeong, K.-C.1    Kim, Y.-D.2
  • 80
    • 23844552406 scopus 로고    scopus 로고
    • Information inaccuracy in inventory systems
    • Kang, Y. and Gershwin, S.B., 2005. Information inaccuracy in inventory systems. IIE Transactions, 37, 843-859.
    • (2005) IIE Transactions , vol.37 , pp. 843-859
    • Kang, Y.1    Gershwin, S.B.2
  • 82
    • 0034630804 scopus 로고    scopus 로고
    • The equivalence of duplicate automated serial workstations and two-workstation tandem systems and its use in serial production line analysis
    • Kim, D.S. and Jung, B.L., 2000. The equivalence of duplicate automated serial workstations and two-workstation tandem systems and its use in serial production line analysis. International Journal of Production Research, 38, 1525-1538.
    • (2000) International Journal of Production Research , vol.38 , pp. 1525-1538
    • Kim, D.S.1    Jung, B.L.2
  • 83
    • 0036646891 scopus 로고    scopus 로고
    • An upper bound for carriers in a three-workstation closed serial production system operating under production blocking
    • Kim, D.S., Kulkarny, D.M. and Lin, F., 2002. An upper bound for carriers in a three-workstation closed serial production system operating under production blocking. IEEE Transactions on Automatic Control, 47, 1134-1138.
    • (2002) IEEE Transactions on Automatic Control , vol.47 , pp. 1134-1138
    • Kim, D.S.1    Kulkarny, D.M.2    Lin, F.3
  • 85
    • 17444379378 scopus 로고    scopus 로고
    • Integrated quality and quantity model of a production line
    • Kim, J. and Gershwin, S.B., 2005. Integrated quality and quantity model of a production line. OR Spectrum, 27, 287-314.
    • (2005) OR Spectrum , vol.27 , pp. 287-314
    • Kim, J.1    Gershwin, S.B.2
  • 86
    • 0020915621 scopus 로고
    • An algorithm for the computer control of production in a flexible manufacturing systems
    • Kimemia, J.G. and Gershwin, S.B., 1983. An algorithm for the computer control of production in a flexible manufacturing systems. IIE Transactions, 15, 353-362.
    • (1983) IIE Transactions , vol.15 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 87
    • 0000009851 scopus 로고
    • Production lines and internal storage-a review
    • Koenigsberg, E., 1959. Production lines and internal storage-a review. Management Sciences, 5, 410-433.
    • (1959) Management Sciences , vol.5 , pp. 410-433
    • Koenigsberg, E.1
  • 88
    • 0034248987 scopus 로고    scopus 로고
    • Optimal rate allocation in unreliable, assembly disassembly production networks with blocking
    • Kouikoglou, V.S., 2000. Optimal rate allocation in unreliable, assembly disassembly production networks with blocking. IEEE Transactions on Robotics and Automation, 16, 429-434.
    • (2000) IEEE Transactions on Robotics and Automation , vol.16 , pp. 429-434
    • Kouikoglou, V.S.1
  • 89
    • 34250817292 scopus 로고    scopus 로고
    • Analysis of automated flow line systems with repair crew interference
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M Smith, eds. Dordrecht: Kluwer Academic
    • Kuhn, H., 2003. Analysis of automated flow line systems with repair crew interference, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 155-179.
    • (2003) Analysis and Modeling of Manufacturing Systems , pp. 155-179
    • Kuhn, H.1
  • 90
    • 21144477219 scopus 로고
    • Re-entrant lines
    • Kumar, P.R., 1993. Re-entrant lines. Queueing systems, 13, 87-110.
    • (1993) Queueing Systems , vol.13 , pp. 87-110
    • Kumar, P.R.1
  • 91
    • 0035485518 scopus 로고    scopus 로고
    • Queueing network models in the design and analysis of semiconductor wafer fabs
    • Kumar, S. and Kumar, P.R., 2001. Queueing network models in the design and analysis of semiconductor wafer fabs. IEEE Transactions on Robotics and Automation, 17, 548-561.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , pp. 548-561
    • Kumar, S.1    Kumar, P.R.2
  • 93
  • 94
    • 0002758765 scopus 로고    scopus 로고
    • Improvability theory for assembly systems: Two component-one assembly machine case
    • Kuo, C.-T., Lim, J.-T., Meerkov, S.M. and Park, E., 1997. Improvability theory for assembly systems: Two component-one assembly machine case. Mathematical Problems in Engineering, 3, 95-171.
    • (1997) Mathematical Problems in Engineering , vol.3 , pp. 95-171
    • Kuo, C.-T.1    Lim, J.-T.2    Meerkov, S.M.3    Park, E.4
  • 96
    • 0034405773 scopus 로고    scopus 로고
    • A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
    • Le Bihan, H. and Dallery, Y., 2000. A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93, 265-297.
    • (2000) Annals of Operations Research , vol.93 , pp. 265-297
    • Le Bihan, H.1    Dallery, Y.2
  • 97
    • 70449687494 scopus 로고    scopus 로고
    • Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part I: The building block
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
    • Levantesi, R., Matta, A. and Tolio, T., 2003a. Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part I: The building block, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 181-200.
    • (2003) Analysis and Modeling of Manufacturing Systems , pp. 181-200
    • Levantesi, R.1    Matta, A.2    Tolio, T.3
  • 98
    • 70449660276 scopus 로고    scopus 로고
    • Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part II: Decomposition
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
    • Levantesi, R., Matta, A. and Tolio, T., 2003b. Performance evaluation of production lines with random processing times, multiple failure modes and finite buffer capacity-Part II: decomposition, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 201-219.
    • (2003) Analysis and Modeling of Manufacturing Systems , pp. 201-219
    • Levantesi, R.1    Matta, A.2    Tolio, T.3
  • 100
    • 3242682462 scopus 로고    scopus 로고
    • Performance analysis of production systems with rework loops
    • Li, J., 2004a. Performance analysis of production systems with rework loops. IIE Transactions, 36, 755-765.
    • (2004) IIE Transactions , vol.36 , pp. 755-765
    • Li, J.1
  • 101
    • 7244239535 scopus 로고    scopus 로고
    • Modeling and analysis of manufacturing systems with parallel lines
    • Li, J., 2004b. Modeling and analysis of manufacturing systems with parallel lines. IEEE Transactions on Automatic Control, 49, 1824-1829.
    • (2004) IEEE Transactions on Automatic Control , vol.49 , pp. 1824-1829
    • Li, J.1
  • 103
    • 12844287589 scopus 로고    scopus 로고
    • Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems
    • Li, J., 2005. Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems. IEEE Transactions on Automation Sciences and Engineering, 2, 40-53.
    • (2005) IEEE Transactions on Automation Sciences and Engineering , vol.2 , pp. 40-53
    • Li, J.1
  • 104
    • 14044252065 scopus 로고    scopus 로고
    • Approximating feeder line reliability statistics in assembly systems with partial data collection
    • Li, J., Alden, J.M. and Rabaey, J.A., 2005. Approximating feeder line reliability statistics in assembly systems with partial data collection. Computers & Industrial Engineering, 48, 181-203.
    • (2005) Computers & Industrial Engineering , vol.48 , pp. 181-203
    • Li, J.1    Alden, J.M.2    Rabaey, J.A.3
  • 105
    • 33746409720 scopus 로고    scopus 로고
    • Quantitative analysis of transfer production line with Andon
    • Li, J. and Blumenfeld, D.E., 2006. Quantitative analysis of transfer production line with Andon. IIE Transactions, 38, 837-846.
    • (2006) IIE Transactions , vol.38 , pp. 837-846
    • Li, J.1    Blumenfeld, D.E.2
  • 107
    • 33846300980 scopus 로고    scopus 로고
    • Manufacturing system design to improve quality buy rate: An automotive paint shop application study
    • Li, J., Blumenfeld, D.E. and Marin, S.P., 2007. Manufacturing system design to improve quality buy rate: An automotive paint shop application study. IEEE Transactions on Automation Science and Engineering, 4, 75-79.
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , pp. 75-79
    • Li, J.1    Blumenfeld, D.E.2    Marin, S.P.3
  • 108
    • 38049033423 scopus 로고    scopus 로고
    • Production system design for quality robustness: Theory and application in automotive paint shops
    • Li, J., Blumenfeld, D.E. and Marin, S.P., 2008. Production system design for quality robustness: Theory and application in automotive paint shops. IIE Transactions, 40, 162-176.
    • (2008) IIE Transactions , vol.40 , pp. 162-176
    • Li, J.1    Blumenfeld, D.E.2    Marin, S.P.3
  • 109
    • 4043097797 scopus 로고    scopus 로고
    • Random demand satisfaction by unreliable production-inventory-customer systems
    • Li, J., Enginarlar, E. and Meerkov, S.M., 2004. Random demand satisfaction by unreliable production-inventory-customer systems. Annals of Operations Research, 126, 159-175.
    • (2004) Annals of Operations Research , vol.126 , pp. 159-175
    • Li, J.1    Enginarlar, E.2    Meerkov, S.M.3
  • 110
    • 33645678279 scopus 로고    scopus 로고
    • Conservation of filtering in manufacturing systems with unreliable machines and finished goods buffers
    • Li, J., Enginarlar, E. and Meerkov, S.M., 2006. Conservation of filtering in manufacturing systems with unreliable machines and finished goods buffers. Mathematical Problems in Engineering, 2006, 1-12.
    • (2006) Mathematical Problems in Engineering , vol.2006 , pp. 1-12
    • Li, J.1    Enginarlar, E.2    Meerkov, S.M.3
  • 111
    • 27844593045 scopus 로고    scopus 로고
    • Modeling and analysis of a multiple product manufacturing system with split and merge
    • Li, J. and Huang, N., 2005. Modeling and analysis of a multiple product manufacturing system with split and merge. International Journal of Production Research, 43, 4049-4066.
    • (2005) International Journal of Production Research , vol.43 , pp. 4049-4066
    • Li, J.1    Huang, N.2
  • 112
    • 0034384883 scopus 로고    scopus 로고
    • Production variability in manufacturing systems: Bernoulli reliability case
    • Li, J. and Meerkov, S.M., 2000a. Production variability in manufacturing systems: Bernoulli reliability case. Annals of Operations Research, 93, 299-324.
    • (2000) Annals of Operations Research , vol.93 , pp. 299-324
    • Li, J.1    Meerkov, S.M.2
  • 113
    • 0346992882 scopus 로고    scopus 로고
    • Bottlenecks with respect to due-time performance in pull serial production lines
    • Li, J. and Meerkov, S.M., 2000b. Bottlenecks with respect to due-time performance in pull serial production lines. Mathematical Problems in Engineering, 5, 479-498.
    • (2000) Mathematical Problems in Engineering , vol.5 , pp. 479-498
    • Li, J.1    Meerkov, S.M.2
  • 114
    • 0035428378 scopus 로고    scopus 로고
    • Customer demand satisfaction in production systems: A due-time performance approach
    • Li, J. and Meerkov, S.M., 2001. Customer demand satisfaction in production systems: A due-time performance approach. IEEE Transactions on Robotics and Automation, 17, 472-482.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , pp. 472-482
    • Li, J.1    Meerkov, S.M.2
  • 115
    • 4043098920 scopus 로고    scopus 로고
    • Due-time performance in production systems with Markovian machines
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
    • Li, J. and Meerkov, S.M., 2003. Due-time performance in production systems with Markovian machines, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 221-253.
    • (2003) Analysis and Modeling of Manufacturing Systems , pp. 221-253
    • Li, J.1    Meerkov, S.M.2
  • 116
    • 84885784965 scopus 로고    scopus 로고
    • Evaluation of throughput in serial production lines with nonexponential machines
    • E.K. Boukas and R. Malhame, eds. Berlin: Springer
    • Li, J. and Meerkov, S.M., 2005a. Evaluation of throughput in serial production lines with nonexponential machines, In: E.K. Boukas and R. Malhame, eds. Analysis, control and optimization of complex dynamic systems. Berlin: Springer, 55-82.
    • (2005) Analysis, Control and Optimization of Complex Dynamic Systems , pp. 55-82
    • Li, J.1    Meerkov, S.M.2
  • 117
    • 17444380674 scopus 로고    scopus 로고
    • On the coefficients of variation of up- and downtime of manufacturing equipment
    • Li, J. and Meerkov, S.M., 2005b. On the coefficients of variation of up- and downtime of manufacturing equipment. Mathematical Problems in Engineering, 2005, 1-6.
    • (2005) Mathematical Problems in Engineering , vol.2005 , pp. 1-6
    • Li, J.1    Meerkov, S.M.2
  • 120
    • 0025432495 scopus 로고
    • Homogeneous, asymptotically reliable serial production lines: Theory and a case study
    • Lim, J.-T., Meerkov, S.M. and Top, F., 1990. Homogeneous, asymptotically reliable serial production lines: Theory and a case study. IEEE Transactions on Automatic Control, 35, 524-534.
    • (1990) IEEE Transactions on Automatic Control , vol.35 , pp. 524-534
    • Lim, J.-T.1    Meerkov, S.M.2    Top, F.3
  • 121
    • 0027539390 scopus 로고
    • On asymptotic reliable closed serial production lines
    • Lim, J.-T. and Meerkov, S.M., 1993. On asymptotic reliable closed serial production lines. Control Engineering Practices, 1, 147-152.
    • (1993) Control Engineering Practices , vol.1 , pp. 147-152
    • Lim, J.-T.1    Meerkov, S.M.2
  • 122
    • 0033078608 scopus 로고    scopus 로고
    • Steady-state performance analysis of serial transfer lines subject to machine and buffer failure
    • Lipset, R., Van Til, R.P. and Sengupta, S., 1999. Steady-state performance analysis of serial transfer lines subject to machine and buffer failure. IEEE Transactions on Automatic Control, 44, 319-325.
    • (1999) IEEE Transactions on Automatic Control , vol.44 , pp. 319-325
    • Lipset, R.1    Van Til, R.P.2    Sengupta, S.3
  • 123
    • 0342524337 scopus 로고
    • A zero-buffer equivalence technique for decomposing queueing networks with blocking
    • H.G. Perros and T. Altiok, eds. Amsterdam: North-Holland
    • Liu, X.-G. and Buzacott, J.A., 1989. A zero-buffer equivalence technique for decomposing queueing networks with blocking, In: H.G. Perros and T. Altiok, eds. Queueing networks with blocking. Amsterdam: North-Holland, 87-104.
    • (1989) Queueing Networks with Blocking , pp. 87-104
    • Liu, X.-G.1    Buzacott, J.A.2
  • 124
    • 0025414457 scopus 로고
    • Approximate models of assembly systems with finite inventory banks
    • Liu, X.-G. and Buzacott, J.A., 1990. Approximate models of assembly systems with finite inventory banks. European Journal of Operational Research, 45, 143-154.
    • (1990) European Journal of Operational Research , vol.45 , pp. 143-154
    • Liu, X.-G.1    Buzacott, J.A.2
  • 125
    • 33644619196 scopus 로고    scopus 로고
    • A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes
    • Mandroli, S.S., Shrivastava, A.K. and Ding, Y., 2006. A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes. IIE Transactions, 38, 309-328
    • (2006) IIE Transactions , vol.38 , pp. 309-328
    • Mandroli, S.S.1    Shrivastava, A.K.2    Ding, Y.3
  • 126
    • 17444381621 scopus 로고    scopus 로고
    • Automated flow lines with shared buffer
    • Matta, A., Runchina, M. and Tolio, T., 2005. Automated flow lines with shared buffer. OR Spectrum, 27, 265-286.
    • (2005) OR Spectrum , vol.27 , pp. 265-286
    • Matta, A.1    Runchina, M.2    Tolio, T.3
  • 127
    • 38049075378 scopus 로고    scopus 로고
    • Transient behavior of serial production lines with Bernoulli machines
    • Meerkov, S.M. and Zhang, L., 2008. Transient behavior of serial production lines with Bernoulli machines. IIE Transactions, 40, 297-312.
    • (2008) IIE Transactions , vol.40 , pp. 297-312
    • Meerkov, S.M.1    Zhang, L.2
  • 128
    • 0000357748 scopus 로고
    • Stochastic theory of a fluid model of producers and consumers coupled by a buffer
    • Mitra, D., 1988. Stochastic theory of a fluid model of producers and consumers coupled by a buffer. Advanced Applied Probabilities, 20, 646-676.
    • (1988) Advanced Applied Probabilities , vol.20 , pp. 646-676
    • Mitra, D.1
  • 130
    • 0001441631 scopus 로고    scopus 로고
    • Modeling reentrant manufacturing system with inspection stations
    • Narahari, Y. and Khan, L.M., 1996. Modeling reentrant manufacturing system with inspection stations. Journal of Manufacturing Systems, 15, 367-378.
    • (1996) Journal of Manufacturing Systems , vol.15 , pp. 367-378
    • Narahari, Y.1    Khan, L.M.2
  • 133
    • 34247627882 scopus 로고    scopus 로고
    • Local improvements that degrade system performance: Case studies and discussion for throughput analysis
    • Owen, J.H. and Huang, N., 2007. Local improvements that degrade system performance: case studies and discussion for throughput analysis. International Journal of Production Research, 45, 2351-2364.
    • (2007) International Journal of Production Research , vol.45 , pp. 2351-2364
    • Owen, J.H.1    Huang, N.2
  • 134
    • 67749120919 scopus 로고    scopus 로고
    • Analysis of two-valve fluid-flow systems with general repair times
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Dordrecht: Kluwer Academic
    • Özdõgru, U. and Altiok, T., 2003. Analysis of two-valve fluid-flow systems with general repair times, In: S.B. Gershwin, Y. Dallery, C.T. Papadopoulos and J.M. Smith, eds. Analysis and modeling of manufacturing systems. Dordrecht: Kluwer Academic, 255-288.
    • (2003) Analysis and Modeling of Manufacturing Systems , pp. 255-288
    • Özdõgru, U.1    Altiok, T.2
  • 136
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H.T. and Heavey, C., 1996. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92, 1-27.
    • (1996) European Journal of Operational Research , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 137
    • 0032188602 scopus 로고    scopus 로고
    • Analysis of production lines with Coxian service times and no intermediate buffers
    • Papadopoulos, H.T., 1998. Analysis of production lines with Coxian service times and no intermediate buffers. Naval Research Logistics, 45, 669-685.
    • (1998) Naval Research Logistics , vol.45 , pp. 669-685
    • Papadopoulos, H.T.1
  • 138
    • 0035400771 scopus 로고    scopus 로고
    • Modeling and analysis of an unreliable flow line composed of parallel-machine stages
    • Patchong, A. and Willaeys, D., 2001. Modeling and analysis of an unreliable flow line composed of parallel-machine stages. IIE Transactions, 33, 559-568.
    • (2001) IIE Transactions , vol.33 , pp. 559-568
    • Patchong, A.1    Willaeys, D.2
  • 147
    • 0742286690 scopus 로고    scopus 로고
    • Decomposition/aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines
    • Sadr, J. and Malhame, R.P., 2004a. Decomposition/aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines. IEEE Transactions on Automatic Control, 49, 68-81.
    • (2004) IEEE Transactions on Automatic Control , vol.49 , pp. 68-81
    • Sadr, J.1    Malhame, R.P.2
  • 148
    • 4043126082 scopus 로고    scopus 로고
    • Unreliable transfer lines: Decomposition/aggregation and optimization
    • Sadr, J. and Malhame, R.P., 2004b. Unreliable transfer lines: decomposition/aggregation and optimization. Annals of Operations Research, 125, 167-190. (Pubitemid 39063656)
    • (2004) Annals of Operations Research , vol.125 , Issue.1-4 , pp. 167-190
    • Sadr, J.1    Malhame, R.P.2
  • 149
    • 0009455220 scopus 로고
    • Influence of storage bin capacity on the average standstill time of a production line
    • Sevastyanov, B.A., 1962. Influence of storage bin capacity on the average standstill time of a production line. Theory of Probability Applications, 6, 429-438.
    • (1962) Theory of Probability Applications , vol.6 , pp. 429-438
    • Sevastyanov, B.A.1
  • 150
    • 0003228793 scopus 로고
    • Availability and average inventory of balanced assembly-like flow systems
    • Simon, J.T. and Hopp, W.J., 1991. Availability and average inventory of balanced assembly-like flow systems. IIE Transactions, 23, 161-168.
    • (1991) IIE Transactions , vol.23 , pp. 161-168
    • Simon, J.T.1    Hopp, W.J.2
  • 151
    • 0033640801 scopus 로고    scopus 로고
    • A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device
    • Suliman, S.M.A., 1999. A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device. International Journal of Production Economics, 63, 69-81.
    • (1999) International Journal of Production Economics , vol.63 , pp. 69-81
    • Suliman, S.M.A.1
  • 153
    • 0032484451 scopus 로고    scopus 로고
    • Effects of the variability on the due-time performance of production lines
    • Tan, B., 1998. Effects of the variability on the due-time performance of production lines. International Journal of Production Economics, 54, 87-100.
    • (1998) International Journal of Production Economics , vol.54 , pp. 87-100
    • Tan, B.1
  • 154
    • 0035831088 scopus 로고    scopus 로고
    • A three-station merge system with unreliable stations and a shared buffer
    • Tan, B., 2001. A three-station merge system with unreliable stations and a shared buffer. Mathematical and Computer Modeling, 33, 1011-1026.
    • (2001) Mathematical and Computer Modeling , vol.33 , pp. 1011-1026
    • Tan, B.1
  • 155
    • 0036576750 scopus 로고    scopus 로고
    • Production control of a pull system with production and demand uncertainty
    • Tan, B., 2002. Production control of a pull system with production and demand uncertainty. IEEE Transactions on Automatic Control, 47, 779-783.
    • (2002) IEEE Transactions on Automatic Control , vol.47 , pp. 779-783
    • Tan, B.1
  • 156
    • 0034323738 scopus 로고    scopus 로고
    • Modelling and scheduling of an asynchronous cyclic production line with multiple parts
    • Tan, B. and Karabati, S., 2001. Modelling and scheduling of an asynchronous cyclic production line with multiple parts. Journal of the Operational Research Society, 51, 1296-1308.
    • (2001) Journal of the Operational Research Society , vol.51 , pp. 1296-1308
    • Tan, B.1    Karabati, S.2
  • 157
    • 0031259221 scopus 로고    scopus 로고
    • A decomposition model for continuous materials flow production systems
    • Tan, B. and Yeralan, S., 1997. A decomposition model for continuous materials flow production. International Journal of Production Research, 35, 2759-2772. (Pubitemid 127564041)
    • (1997) International Journal of Production Research , vol.35 , Issue.10 , pp. 2759-2772
    • Tan, B.1    Yeralan, S.2
  • 158
    • 0035311479 scopus 로고    scopus 로고
    • Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production
    • Tempelmeier, H. and Burger, M., 2001. Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production. IIE Transactions, 33, 293-302.
    • (2001) IIE Transactions , vol.33 , pp. 293-302
    • Tempelmeier, H.1    Burger, M.2
  • 159
  • 160
    • 0036160410 scopus 로고    scopus 로고
    • Analysis of two-machine lines with multiple failure modes
    • Tolio, T., Matta, A. and Gershwin, S.B., 2002. Analysis of two-machine lines with multiple failure modes. IIE Transactions, 34, 51-62.
    • (2002) IIE Transactions , vol.34 , pp. 51-62
    • Tolio, T.1    Matta, A.2    Gershwin, S.B.3
  • 161
    • 0032203962 scopus 로고    scopus 로고
    • Analysis of production systems when run length influences product quality
    • Urban, T.L., 1998. Analysis of production systems when run length influences product quality. International Journal of Production Research, 36, 3085-3094.
    • (1998) International Journal of Production Research , vol.36 , pp. 3085-3094
    • Urban, T.L.1
  • 168
    • 0034418978 scopus 로고    scopus 로고
    • Modeling and analysis of multi-stage transfer lines with unreliable machines and finite buffers
    • Yang, S., Wu, C. and Hu, S.J., 2000. Modeling and analysis of multi-stage transfer lines with unreliable machines and finite buffers. Annals of Operations Research, 93, 405-421.
    • (2000) Annals of Operations Research , vol.93 , pp. 405-421
    • Yang, S.1    Wu, C.2    Hu, S.J.3
  • 169
    • 0030916278 scopus 로고    scopus 로고
    • Analysis of multistation production systems with limited buffer capacity part 1: The subsystem model
    • DOI 10.1016/S0895-7177(97)00052-6, PII S0895717797000526
    • Yeralan, S. and Tan, B., 1997a. Analysis of Multistation production systems with limited buffer capacity. Part 1: The subsystem model. Mathematical Computer Modelling, 25, 109-122. (Pubitemid 27253446)
    • (1997) Mathematical and Computer Modelling , vol.25 , Issue.7 , pp. 109-122
    • Yeralan, S.1    Tan, B.2
  • 170
    • 0030916278 scopus 로고    scopus 로고
    • Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method
    • DOI 10.1016/S0895-7177(97)00089-7, PII S0895717797000897
    • Yerelan, S. and Tan, B., 1997b. Analysis of multistation production systems with limited buffer capacity. Part 2: The decomposition method. Mathematics and Computer Modeling, 25, 109-123. (Pubitemid 27299550)
    • (1997) Mathematical and Computer Modelling , vol.25 , Issue.11 , pp. 109-123
    • Tan, B.1    Yeralan, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.