메뉴 건너뛰기




Volumn 36, Issue 8, 2004, Pages 755-765

Performance analysis of production systems with rework loops

Author keywords

[No Author keywords available]

Indexed keywords

APPROXIMATION THEORY; CONVERGENCE OF NUMERICAL METHODS; ITERATIVE METHODS; MATHEMATICAL MODELS; PERFORMANCE; SYSTEMS ANALYSIS; THROUGHPUT;

EID: 3242682462     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170490458553     Document Type: Article
Times cited : (79)

References (22)
  • 5
    • 0024732503 scopus 로고
    • Approximate analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R. and Xie, X.-L. (1989) Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34, 943-953.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , pp. 943-953
    • Dallery, Y.1    David, R.2    Xie, X.-L.3
  • 6
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery, Y. and Gershwin, S.B. (1992) Manufacturing flow line systems: a review of models and analytical results. Queueing Systems, 12, 3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 7
    • 0030192549 scopus 로고    scopus 로고
    • Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers
    • Frein, Y., Commault, C. and Dallery, Y. (1996) Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers. IIE Transactions, 28, 545-554.
    • (1996) IIE Transactions , vol.28 , pp. 545-554
    • Frein, Y.1    Commault, C.2    Dallery, Y.3
  • 8
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Gershwin, S.B. (1987) An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35, 291-305.
    • (1987) Operations Research , vol.35 , pp. 291-305
    • Gershwin, S.B.1
  • 9
    • 0000440767 scopus 로고
    • Assembly/disassembly systems: An efficient decomposition algorithm for tree-structured networks
    • Gershwin, S.B. (1991) Assembly/disassembly systems: an efficient decomposition algorithm for tree-structured networks. IIE Transactions, 23, 302-314.
    • (1991) IIE Transactions , vol.23 , pp. 302-314
    • Gershwin, S.B.1
  • 12
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • Inman, R.R. (1999) Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operations Management, 8, 409-432.
    • (1999) Production and Operations Management , vol.8 , pp. 409-432
    • Inman, R.R.1
  • 13
    • 3042525885 scopus 로고    scopus 로고
    • A system-theoretic property of serial production lines: Improvability
    • Jacobs, D.A. and Meerkov, S.M. (1997) A system-theoretic property of serial production lines: improvability. International Journal of System Sciences, 26, 95-137.
    • (1997) International Journal of System Sciences , vol.26 , pp. 95-137
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 14
    • 0002758765 scopus 로고    scopus 로고
    • Improvability theory for assembly systems: Two component - one assembly machine case
    • Kuo, C.-T., Lim, J.-T., Meerkov, S.M. and Park, E. (1997) Improvability theory for assembly systems: two component - one assembly machine case. Mathematical Problems in Engineering, 3, 95-171.
    • (1997) Mathematical Problems in Engineering , vol.3 , pp. 95-171
    • Kuo, C.-T.1    Lim, J.-T.2    Meerkov, S.M.3    Park, E.4
  • 16
    • 0027539390 scopus 로고
    • On asymptotic reliable closed serial production lines
    • Lim, J.-T. and Meerkov, S.M. (1993) On asymptotic reliable closed serial production lines. Control Engineering Practices, 1, 147-152.
    • (1993) Control Engineering Practices , vol.1 , pp. 147-152
    • Lim, J.-T.1    Meerkov, S.M.2
  • 17
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliable machines and finite buffers
    • Mascolo, M.D., David, R. and Dallery, Y. (1991) Modeling and analysis of assembly systems with unreliable machines and finite buffers. IIE Transactions, 23, 315-330.
    • (1991) IIE Transactions , vol.23 , pp. 315-330
    • Mascolo, M.D.1    David, R.2    Dallery, Y.3
  • 18
    • 0025448957 scopus 로고
    • A survey of closed queueing networks with blocking
    • Onvural, R.O. (1990) A survey of closed queueing networks with blocking. ACM Computing Surveys, 22, 83-121.
    • (1990) ACM Computing Surveys , vol.22 , pp. 83-121
    • Onvural, R.O.1
  • 19
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H.T. and Heavey, C. (1996) Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. European Journal of Operational Research, 92, 1-27.
    • (1996) European Journal of Operational Research , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 20
    • 0035400771 scopus 로고    scopus 로고
    • Modeling and analysis of an unreliable flow line composed of parallel-machine stages
    • Patchong, A. and Willaeys, D. (2001) Modeling and analysis of an unreliable flow line composed of parallel-machine stages. IIE Transactions, 33, 559-568.
    • (2001) IIE Transactions , vol.33 , pp. 559-568
    • Patchong, A.1    Willaeys, D.2
  • 21
    • 77957033398 scopus 로고
    • Performance evaluation of production networks
    • Graves S.C., Rinnooy Kan A.G., Zip Kin P. (eds.), Elsevier Science, Amsterdam
    • Suri, R., Sanders, J.L. and Kamath, M. (1993) Performance evaluation of production networks, in Handbooks in OR & MS: Volume 4, Graves S.C., Rinnooy Kan A.G., Zip Kin P. (eds.), Elsevier Science, Amsterdam, pp. 199-286.
    • (1993) Handbooks in OR and MS , vol.4 , pp. 199-286
    • Suri, R.1    Sanders, J.L.2    Kamath, M.3
  • 22
    • 0030916278 scopus 로고    scopus 로고
    • Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method
    • Yerelan, S. and Tan, B. (1997) Analysis of multistation production systems with limited buffer capacity part 2: the decomposition method. Mathematics and Computer Modeling, 25, 109-123.
    • (1997) Mathematics and Computer Modeling , vol.25 , pp. 109-123
    • Yerelan, S.1    Tan, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.