메뉴 건너뛰기




Volumn 44, Issue 7, 2006, Pages 1375-1398

Comparisons of two-machine line models in throughput analysis

Author keywords

Throughput analysis; Two machine line models

Indexed keywords

LARGE SCALE SYSTEMS; MATHEMATICAL MODELS; THROUGHPUT;

EID: 32644458004     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540500371980     Document Type: Article
Times cited : (58)

References (27)
  • 2
    • 0022060308 scopus 로고
    • Production lines with phase-type operation and repair times and finite buffers
    • Altiok, T., Production lines with phase-type operation and repair times and finite buffers. Int. J. Prod. Res., 1985, 23, 489-498.
    • (1985) Int. J. Prod. Res. , vol.23 , pp. 489-498
    • Altiok, T.1
  • 4
    • 31044437924 scopus 로고    scopus 로고
    • An analytical formula for throughput of a production line with identical stations and random failures
    • Blumenfeld, D.E. and Li, J., An analytical formula for throughput of a production line with identical stations and random failures. Math. Prob. Eng., 2005, 293-308.
    • (2005) Math. Prob. Eng. , pp. 293-308
    • Blumenfeld, D.E.1    Li, J.2
  • 5
    • 84947637958 scopus 로고
    • Automatic transfer lines with buffer stocks
    • Buzacott, J.A., Automatic transfer lines with buffer stocks. Int. J. Prod. Res., 1967, 5, 183-200.
    • (1967) Int. J. Prod. Res. , vol.5 , pp. 183-200
    • Buzacott, J.A.1
  • 6
    • 0042444340 scopus 로고
    • Methods of reliability analysis of production systems subject to breakdowns
    • edited by F. Grouchko, Gordon and Breach: New York.
    • Buzacott, J.A., Methods of reliability analysis of production systems subject to breakdowns. In Operations Research and Reliability, edited by F. Grouchko, pp. 211-232, 1971 (Gordon and Breach: New York).
    • (1971) Operations Research and Reliability , pp. 211-232
    • Buzacott, J.A.1
  • 7
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks: A review and comparison
    • Buzacott, J.A. and Hanifin, L.E., Models of automatic transfer lines with inventory banks: a review and comparison. IIE Trans., 1978, 10, 197-207.
    • (1978) IIE Trans. , vol.10 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 9
    • 0034291972 scopus 로고    scopus 로고
    • DT-bottleneck in serial production lines: Theory and application
    • Chiang, S.-Y., Kuo, C.-T. and Meerkov, S.M., DT-bottleneck in serial production lines: theory and application. IEEE T. Robotic. Autom., 2000, 16, 567-580.
    • (2000) IEEE T. Robotic. Autom. , vol.16 , pp. 567-580
    • Chiang, S.-Y.1    Kuo, C.-T.2    Meerkov, S.M.3
  • 10
    • 0345854809 scopus 로고    scopus 로고
    • c-Bottleneck in serial production lines: Identification and application
    • Chiang, S.-Y., Kuo, C.-T. and Meerkov, S.M., c-Bottleneck in serial production lines: identification and application. Math. Prob. Eng., 2001, 7, 543-578.
    • (2001) Math. Prob. Eng. , vol.7 , pp. 543-578
    • Chiang, S.-Y.1    Kuo, C.-T.2    Meerkov, S.M.3
  • 11
    • 0024070564 scopus 로고
    • An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R. and Xie, X.-L., An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Trans., 1988, 20, 280-283.
    • (1988) IIE Trans. , vol.20 , pp. 280-283
    • Dallery, Y.1    David, R.2    Xie, X.-L.3
  • 12
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery, Y. and Gershwin, S.B., Manufacturing flow line systems: a review of models and analytical results. Queuing Syst., 1992, 12, 3-94.
    • (1992) Queuing Syst. , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 13
    • 0023329472 scopus 로고
    • Estimation of the line efficiency by aggregation
    • De Koster, M.B.M., Estimation of the line efficiency by aggregation. Int. J. Prod. Res., 1987, 25, 615-626.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 615-626
    • De Koster, M.B.M.1
  • 14
    • 0037085111 scopus 로고    scopus 로고
    • Buffer capacity for accommodating machine downtime in serial production lines
    • Enginarlar, E., Li, J., Meerkov, S.M. and Zhang, R.Q., Buffer capacity for accommodating machine downtime in serial production lines. Int. J. Prod. Res., 2002, 40, 601-624.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 601-624
    • Enginarlar, E.1    Li, J.2    Meerkov, S.M.3    Zhang, R.Q.4
  • 15
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Gershwin, S.B., An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Oper. Res., 1987, 35, 291-305.
    • (1987) Oper. Res. , vol.35 , pp. 291-305
    • Gershwin, S.B.1
  • 17
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • Inman, R.R., Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Prod. Oper. Manage., 1999, 8, 409-432.
    • (1999) Prod. Oper. Manage. , vol.8 , pp. 409-432
    • Inman, R.R.1
  • 19
    • 0029291550 scopus 로고
    • A system-theoretic property of serial production lines: Improvability
    • Jacobs, D.A. and Meerkov, S.M., A system-theoretic property of serial production lines: improvability. Int. J. Sys. Sci., 1995, 26, 95-137.
    • (1995) Int. J. Sys. Sci. , vol.26 , pp. 95-137
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 21
    • 0034405773 scopus 로고    scopus 로고
    • A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
    • Le Bihan, H. and Dallery, Y., A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Ann. Oper. Res., 2000, 93, 265-297.
    • (2000) Ann. Oper. Res. , vol.93 , pp. 265-297
    • Le Bihan, H.1    Dallery, Y.2
  • 23
    • 4043098920 scopus 로고    scopus 로고
    • Due-time performance in production systems with Markovian machines
    • edited by S.B. Gershwin et al., Kluwer Academic: Boston, MA.
    • Li, J. and Meerkov, S.M., Due-time performance in production systems with Markovian machines. In Analysis of Manufacturing Systems, edited by S.B. Gershwin et al., pp. 221-253, 2003 (Kluwer Academic: Boston, MA).
    • (2003) Analysis of Manufacturing Systems , pp. 221-253
    • Li, J.1    Meerkov, S.M.2
  • 25
    • 84885784965 scopus 로고    scopus 로고
    • Evaluation of throughput in serial production lines with non-exponential machines
    • edited by E.K. Boukas and R. Malhame, Springer: New York.
    • Li, J. and Meerkov, S.M., Evaluation of throughput in serial production lines with non-exponential machines. In Analysis, Control and Optimization of Complex Dynamic Systems, edited by E.K. Boukas and R. Malhame, pp. 55-82, 2005 (Springer: New York).
    • (2005) Analysis, Control and Optimization of Complex Dynamic Systems , pp. 55-82
    • Li, J.1    Meerkov, S.M.2
  • 26
    • 0025432495 scopus 로고
    • Homogeneous, asymtotically reliable serial production lines: Theory and a case study
    • Lim, J.T., Meerkov, S.M. and Top, F., Homogeneous, asymtotically reliable serial production lines: theory and a case study. IEEE T. Automat. Contr., 1990, 35, 524-534.
    • (1990) IEEE T. Automat. Contr. , vol.35 , pp. 524-534
    • Lim, J.T.1    Meerkov, S.M.2    Top, F.3
  • 27
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H.T. and Heavey, C., Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. Eur. J. Oper. Res., 1996, 92, 1-27.
    • (1996) Eur. J. Oper. Res. , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.