메뉴 건너뛰기




Volumn 126, Issue 1-4, 2004, Pages 159-175

Random demand satisfaction in unreliable production-inventory-customer systems

Author keywords

Due time performance; Finished goods buffer; Markovian reliability; Random demand

Indexed keywords


EID: 4043097797     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/B:ANOR.0000012279.78938.6b     Document Type: Article
Times cited : (19)

References (27)
  • 1
    • 0024627934 scopus 로고
    • (R, r) production inventory systems
    • Altiok, T. (1989). "(R, r) Production Inventory Systems." Operations Research 37, 266-276.
    • (1989) Operations Research , vol.37 , pp. 266-276
    • Altiok, T.1
  • 5
    • 0001110481 scopus 로고
    • A periodic review production-planning model with uncertain capacity and uncertain demand - Optimality of extended myopic policies
    • Ciarallo, C.W., R. Akella, and T.E. Morton. (1994). "A Periodic Review Production-Planning Model with Uncertain Capacity and Uncertain Demand - Optimality of Extended Myopic Policies." Management Science 40, 320-332.
    • (1994) Management Science , vol.40 , pp. 320-332
    • Ciarallo, C.W.1    Akella, R.2    Morton, T.E.3
  • 6
    • 0022721357 scopus 로고
    • An inventory model with limited production capacity and uncertain demands. I. The average-cost criterion
    • Federgruen, A. and P. Zipkin. (1986). "An Inventory Model with Limited Production Capacity and Uncertain Demands. I. The Average-Cost Criterion." Mathematics of Operations Research 11, 193-207.
    • (1986) Mathematics of Operations Research , vol.11 , pp. 193-207
    • Federgruen, A.1    Zipkin, P.2
  • 7
    • 0019704140 scopus 로고
    • Production-inventory systems with a stochastic production-rate under a continuous review policy
    • Gavish, B. and S.C. Graves. (1981). "Production-Inventory Systems with a Stochastic Production-Rate under a Continuous Review Policy." Computers & Operations Research 8, 169-183.
    • (1981) Computers & Operations Research , vol.8 , pp. 169-183
    • Gavish, B.1    Graves, S.C.2
  • 8
    • 0030084420 scopus 로고    scopus 로고
    • A simple approximation for a multistage capacitated production-inventory system
    • Glasserman, P. and S. Tayur. (1996). "A Simple Approximation for a Multistage Capacitated Production-Inventory System." Naval Research Logistics 43, 41-58.
    • (1996) Naval Research Logistics , vol.43 , pp. 41-58
    • Glasserman, P.1    Tayur, S.2
  • 9
    • 0031997474 scopus 로고    scopus 로고
    • Base stock policies for production/inventory problems with uncertain capacity levels
    • Gullu, R. (1998). "Base Stock Policies for Production/Inventory Problems with Uncertain Capacity Levels." European Journal of Operational Research 105, 43-51.
    • (1998) European Journal of Operational Research , vol.105 , pp. 43-51
    • Gullu, R.1
  • 10
    • 0031197705 scopus 로고    scopus 로고
    • Analysis of a deterministic demand production/inventory system under nonstationary supply uncertainty
    • Gullu, R., E. Onol, and N. Erkip. (1997). "Analysis of a Deterministic Demand Production/Inventory System under Nonstationary Supply Uncertainty." IIE Transactions 29, 703-709.
    • (1997) IIE Transactions , vol.29 , pp. 703-709
    • Gullu, R.1    Onol, E.2    Erkip, N.3
  • 14
    • 0000034424 scopus 로고
    • System-theoretic analysis of due-time performance in production systems
    • Jacobs, D.A. and S.M. Meerkov. (1995). "System-Theoretic Analysis of Due-Time Performance in Production Systems." Mathematical Problems in Engineering 1, 225-243.
    • (1995) Mathematical Problems in Engineering , vol.1 , pp. 225-243
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 15
    • 0034384883 scopus 로고    scopus 로고
    • Production variability in manufacturing systems: Bernoulli reliability case
    • Li, J. and S.M. Meerkov. (2000a). "Production Variability in Manufacturing Systems: Bernoulli Reliability Case." Annals of Operations Research 93, 299-324.
    • (2000) Annals of Operations Research , vol.93 , pp. 299-324
    • Li, J.1    Meerkov, S.M.2
  • 16
    • 0346992882 scopus 로고    scopus 로고
    • Bottlenecks with respect to due-time performance in pull serial production lines
    • Li, J. and S.M. Meerkov. (2000b). "Bottlenecks with Respect to Due-Time Performance in Pull Serial Production Lines." Mathematical Problems in Engineering 5, 479-498.
    • (2000) Mathematical Problems in Engineering , vol.5 , pp. 479-498
    • Li, J.1    Meerkov, S.M.2
  • 17
    • 0035428378 scopus 로고    scopus 로고
    • Customer demand satisfaction: A due-time performance approach
    • Li, J. and S.M. Meerkov. (2001). "Customer Demand Satisfaction: A Due-Time Performance Approach." IEEE Transactions on Robotics and Automation 17, 472-482.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , pp. 472-482
    • Li, J.1    Meerkov, S.M.2
  • 18
    • 4043098920 scopus 로고    scopus 로고
    • Due-time performance of production systems with Markovian machines
    • S.B. Gershwin, Y. Dallery, C.T. Papadopoulos, and J.M. Smith (eds.). Kluwer Academic
    • Li, J. and S.M. Meerkov. (2002). "Due-Time Performance of Production Systems with Markovian Machines." In S.B. Gershwin, Y. Dallery, C.T. Papadopoulos, and J.M. Smith (eds.), Analysis and Modeling of Manufacturing Systems, pp. 221-253. Kluwer Academic.
    • (2002) Analysis and Modeling of Manufacturing Systems , pp. 221-253
    • Li, J.1    Meerkov, S.M.2
  • 19
    • 0036643330 scopus 로고    scopus 로고
    • Base stock versus WIP cap in single-stage make-to-stock production-inventory systems
    • Liberopoulos, G. and Y. Dallery. (2002). "Base Stock versus WIP Cap in Single-Stage Make-to-Stock Production-Inventory Systems." IIE Transactions 34, 627-636.
    • (2002) IIE Transactions , vol.34 , pp. 627-636
    • Liberopoulos, G.1    Dallery, Y.2
  • 20
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • Moinzadeh, K. and P. Aggarwal. (1997). "Analysis of a Production/Inventory System Subject to Random Disruptions." Management Science 43, 1577-1588.
    • (1997) Management Science , vol.43 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 21
    • 0000115495 scopus 로고    scopus 로고
    • Setting base stock levels using product-form queueing networks
    • Rubio, R. and L.M. Wein. (1996). "Setting Base Stock Levels Using Product-Form Queueing Networks." Management Science 42, 259-268.
    • (1996) Management Science , vol.42 , pp. 259-268
    • Rubio, R.1    Wein, L.M.2
  • 22
    • 0000770288 scopus 로고
    • Random review production inventory systems with compound poisson demands and arbitrary processing times
    • Srinivasan, M.M. and H.S. Lee. (1991). "Random Review Production Inventory Systems with Compound Poisson Demands and Arbitrary Processing Times." Management Science 37, 813-833.
    • (1991) Management Science , vol.37 , pp. 813-833
    • Srinivasan, M.M.1    Lee, H.S.2
  • 23
    • 0032484451 scopus 로고    scopus 로고
    • Effects of variability on the due-time performance of production lines
    • Tan, B. (1998). "Effects of Variability on the Due-Time Performance of Production Lines." International Journal of Production Economics, 54, 87-100.
    • (1998) International Journal of Production Economics , vol.54 , pp. 87-100
    • Tan, B.1
  • 24
    • 0032683951 scopus 로고    scopus 로고
    • Variance of the output as a function of time: Production line dynamics
    • Tan, B. (1999). "Variance of the Output as a Function of Time: Production Line Dynamics." European Journal of Operational Research 117, 470-484.
    • (1999) European Journal of Operational Research , vol.117 , pp. 470-484
    • Tan, B.1
  • 26


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.