-
1
-
-
0029291550
-
A system-theoretic property of serial production lines: Improvability
-
D. Jacobs and S.M. Meerkov, "A system-theoretic property of serial production lines: improvability," International Journal of System Science, 26(4), 755-785, 1995.
-
(1995)
International Journal of System Science
, vol.26
, Issue.4
, pp. 755-785
-
-
Jacobs, D.1
Meerkov, S.M.2
-
2
-
-
0346798523
-
Improvability of serial production lines: Theory and applications
-
G. Yin and Q. Zhang (Eds.), Springer-Verlag, London
-
D. Jacobs, C.-T. Kuo, J.-T. Lim and S.M. Meerkov, "Improvability of serial production lines: Theory and applications," Recent Advances in Control and Optimization of Manufacturing Systems, G. Yin and Q. Zhang (Eds.), Springer-Verlag, London, pp. 121-143, 1996.
-
(1996)
Recent Advances in Control and Optimization of Manufacturing Systems
, pp. 121-143
-
-
Jacobs, D.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
3
-
-
0012354474
-
Bottlenecks in serial production lines: A System-theoretic approach
-
C.-T. Kuo, J.-T. Lim and S.M. Meerkov, "Bottlenecks in serial production lines: A System-theoretic approach," Mathematical Problems in Engineering, 2(3), 233-276, 1996.
-
(1996)
Mathematical Problems in Engineering
, vol.2
, Issue.3
, pp. 233-276
-
-
Kuo, C.-T.1
Lim, J.-T.2
Meerkov, S.M.3
-
4
-
-
0347429021
-
A system theory for production lines
-
A. Paulraj, V. Roychowdhury and C.D. Schaper (Eds.)
-
D. Jacobs, C.-T. Kuo, J.-T. Lim and S.M. Meerkov, "A system theory for production lines," Communications, Computation, Control and Signal Processing: A Tribute to Thomas Kailath, A. Paulraj, V. Roychowdhury and C.D. Schaper (Eds.), 1997.
-
(1997)
Communications, Computation, Control and Signal Processing: A Tribute to Thomas Kailath
-
-
Jacobs, D.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
5
-
-
0002758765
-
Improvability theory for assembly system: Two component-One Assembly Machine Case
-
C.-T. Kuo, J.-T. Lim, S.M. Meerkov and E. Park, "Improvability theory for assembly system: Two component-One Assembly Machine Case," Mathematical Problems in Engineering, 3, 95-171, 1997.
-
(1997)
Mathematical Problems in Engineering
, vol.3
, pp. 95-171
-
-
Kuo, C.-T.1
Lim, J.-T.2
Meerkov, S.M.3
Park, E.4
-
7
-
-
0001153787
-
Buffered and unbuffered assembly systems with variable processing times
-
K.R. Baker, S.G. Powell and D.F. Pyke, "Buffered and unbuffered assembly systems with variable processing times," J. Manufacturing Oper. Management, 3, 200-223, 1990.
-
(1990)
J. Manufacturing Oper. Management
, vol.3
, pp. 200-223
-
-
Baker, K.R.1
Powell, S.G.2
Pyke, D.F.3
-
8
-
-
0027154533
-
Optimal allocation of work in assembly systems
-
K.R. Baker, S.G. Powell and D.F. Pyke, "Optimal allocation of work in assembly systems," Management Science, 39, 101-106, 1993.
-
(1993)
Management Science
, vol.39
, pp. 101-106
-
-
Baker, K.R.1
Powell, S.G.2
Pyke, D.F.3
-
10
-
-
0004034817
-
-
North River Press, Croton-on-Hudson, NY
-
E.M. Goldratt, Theory of Constraints, North River Press, Croton-on-Hudson, NY, 1990.
-
(1990)
Theory of Constraints
-
-
Goldratt, E.M.1
-
11
-
-
85037451033
-
Improvability of assembly systems II: Improvability indicators and case study
-
The University of Michigan, Ann Arbor, MI, February
-
C.-T. Kuo, J.-T. Lim and S.M. Meerkov, "Improvability of assembly systems II: Improvability indicators and case study," Control Group Report No. 99-01, The University of Michigan, Ann Arbor, MI, February 1999.
-
(1999)
Control Group Report No. 99-01
-
-
Kuo, C.-T.1
Lim, J.-T.2
Meerkov, S.M.3
-
12
-
-
0009432605
-
Mathematical theory of improvability for production systems
-
D. Jacobs and S.M. Meerkov, "Mathematical theory of improvability for production systems," Mathematical Problems in Engineering, 1(2), 95-137, 1995.
-
(1995)
Mathematical Problems in Engineering
, vol.1
, Issue.2
, pp. 95-137
-
-
Jacobs, D.1
Meerkov, S.M.2
|