-
2
-
-
0032206271
-
Stochastic cyclic scheduling problem in synchronous assembly and production lines
-
Karabati S and Tan B (1998). Stochastic cyclic scheduling problem in synchronous assembly and production lines. J Opl ResSoc 49: 1173-1187.
-
(1998)
J Opl Ressoc
, vol.49
, pp. 1173-1187
-
-
Karabati, S.1
Tan, B.2
-
3
-
-
0022147932
-
Performance valuation of systems of cyclic sequential processes with mutual exclusion using petri nets
-
Magott J (1987). Performance valuation of systems of cyclic sequential processes with mutual exclusion using petri nets. Inform Process Lett 21: 229-232.
-
(1987)
Inform Process Lett
, vol.21
, pp. 229-232
-
-
Magott, J.1
-
5
-
-
0025664084
-
Performance evaluation ofrepetitive automated manufacturing systems
-
IEEE Computer Society Press, Troy, NY
-
Campos J, Colom J and Silva M (1990). Performance evaluation ofrepetitive automated manufacturing systems. In: Proceedings of Rennselaer’s Second International Conference on Computer Integrated Manufacturing. IEEE Computer Society Press, Troy, NY, pp 74-81.
-
(1990)
Proceedings of Rennselaer’s Second International Conference on Computer Integrated Manufacturing
, pp. 74-81
-
-
Campos, J.1
Colom, J.2
Silva, M.3
-
6
-
-
85010816453
-
Estimating performance measures in stochastic cyclic schedules
-
Rao US and Jackson PL (1996). Estimating performance measures in stochastic cyclic schedules. IIE Trans 8: 229-939.
-
(1996)
IIE Trans
, vol.8
, pp. 229-939
-
-
Rao, U.S.1
Jackson, P.L.2
-
7
-
-
0027666485
-
Stochastic analysis of cyclic schedules
-
Bowman R and Muckstadt J (1993). Stochastic analysis of cyclic schedules. Opns Res 41: 947-958.
-
(1993)
Opns Res
, vol.41
, pp. 947-958
-
-
Bowman, R.1
Muckstadt, J.2
-
8
-
-
0032368483
-
Stochastic cyclic flow lines: Nonblocking, Markovian models
-
Lee TE and Seo JW (1998). Stochastic cyclic flow lines: nonblocking, Markovian models. J Opl Res 49: 537-548.
-
(1998)
J Opl Res
, vol.49
, pp. 537-548
-
-
Lee, T.E.1
Seo, J.W.2
-
9
-
-
0031277070
-
Cyclic scheduling in a stochastic environment
-
Zhang H and Graves S (1997). Cyclic scheduling in a stochastic environment. Opns Res 45: 894-903.
-
(1997)
Opns Res
, vol.45
, pp. 894-903
-
-
Zhang, H.1
Graves, S.2
-
10
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Dallery Y and Gershwin SB (1992). Manufacturing flow line systems: a review of models and analytical results. Oueueing Syst 12: 3-94.
-
(1992)
Oueueing Syst
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
12
-
-
0023366797
-
A general model of a production line with intermediate buffer and station breakdown
-
Yeralan S and Muth EJ (1987). A general model of a production line with intermediate buffer and station breakdown. IIE Trans 19: 130-139.
-
(1987)
IIE Trans
, vol.19
, pp. 130-139
-
-
Yeralan, S.1
Muth, E.J.2
-
13
-
-
0003242555
-
The throughput rate of multistation reliable production lines with no intermediate buffers
-
Papadopoulos HT (1995). The throughput rate of multistation reliable production lines with no intermediate buffers. Opns Res 43: 712-715.
-
(1995)
Opns Res
, vol.43
, pp. 712-715
-
-
Papadopoulos, H.T.1
-
15
-
-
0342901348
-
-
Working paper. Management Sciences Department, School of Business, University of British Columbia, Vancouver BC, Canada
-
McCormick ST, Pinedo ML and Wolf B (1987). The complexity of scheduling a flexible assembly system. Working paper. Management Sciences Department, School of Business, University of British Columbia, Vancouver BC, Canada.
-
(1987)
The Complexity of Scheduling a Flexible Assembly System.
-
-
McCormick, S.T.1
Pinedo, M.L.2
Wolf, B.3
-
16
-
-
0343772241
-
Effects of variability on the performance of a production line under cyclic scheduling
-
Kaylan AR and Lehmann A (eds)., Simulational International, San Diego, CA
-
Tan B and Karabati S (1997). Effects of variability on the performance of a production line under cyclic scheduling. In: Kaylan AR and Lehmann A (eds). Proceedings of the 1997 European Simulation Multiconference, Society for Computer Simulational International, San Diego, CA, pp 795-802.
-
(1997)
Proceedings of the 1997 European Simulation Multiconference
, pp. 795-802
-
-
Tan, B.1
Karabati, S.2
-
18
-
-
0024699977
-
A recursive algorithm for generating the transition matrix of multistation series production lines
-
Papadopoulos HT and O’Kelly MEJ (1989). A recursive algorithm for generating the transition matrix of multistation series production lines. Comp Ind 12: 227-240.
-
(1989)
Comp Ind
, vol.12
, pp. 227-240
-
-
Papadopoulos, H.T.1
O’Kelly, M.2
-
19
-
-
0001332637
-
An investigation of phasedistribution moment-matching algorithms for use in queueing models
-
Johnson MA and Taaffe MR (1991). An investigation of phasedistribution moment-matching algorithms for use in queueing models. Queueing Syst 8: 129-148.
-
(1991)
Queueing Syst
, vol.8
, pp. 129-148
-
-
Johnson, M.A.1
Taaffe, M.R.2
-
20
-
-
0025498065
-
Cyclic sequencing problems in the two- machine permutation flowshop: Complexity, worst-case and average-case analysis
-
Matsuo H (1990). Cyclic sequencing problems in the two- machine permutation flowshop: Complexity, worst-case and average-case analysis. Naval Res Logist 37: 679-694.
-
(1990)
Naval Res Logist
, vol.37
, pp. 679-694
-
-
Matsuo, H.1
-
21
-
-
0001510482
-
Sequencing a one state- variable machine: A solvable case of the traveling salesman problem
-
Gilmore PC and Gomory GE (1964). Sequencing a one state- variable machine: a solvable case of the traveling salesman problem. Opns Res 12: 655-679.
-
(1964)
Opns Res
, vol.12
, pp. 655-679
-
-
Gilmore, P.C.1
Gomory, G.E.2
|