-
1
-
-
0022060308
-
Production lines with phase-type operation and repair times and finite buffers
-
Altiok, T. (1985). Production lines with phase-type operation and repair times and finite buffers. International Journal of Production Research, 23:489-498.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 489-498
-
-
Altiok, T.1
-
2
-
-
0024700721
-
Approximate analysis of queues in series with phase-type service times and blocking'
-
Altiok, T. (1989). Approximate analysis of queues in series with phase-type service times and blocking'. Operations Research, 37:601-610.
-
(1989)
Operations Research
, vol.37
, pp. 601-610
-
-
Altiok, T.1
-
4
-
-
0024717419
-
Analysis of production lines with general service times and finite buffers: A two-node decomposition approach
-
Altiok, T. and Ranjan, R. (1989). Analysis of Production Lines with general service times and finite buffers: A two-node decomposition approach. Engineering Costs and Production Economics, 17:155-165.
-
(1989)
Engineering Costs and Production Economics
, vol.17
, pp. 155-165
-
-
Altiok, T.1
Ranjan, R.2
-
5
-
-
0034405773
-
A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers
-
Le Bihan, H. and Dallery, Y. (2000). A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93:265-297.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 265-297
-
-
Le Bihan, H.1
Dallery, Y.2
-
6
-
-
0015603944
-
Production flow line systems design-A review
-
Buxey, G.M., Slack, N.D., and Wild, R. (1973). Production flow line systems design-A review. AIIE Transactions, 5:37-48.
-
(1973)
AIIE Transactions
, vol.5
, pp. 37-48
-
-
Buxey, G.M.1
Slack, N.D.2
Wild, R.3
-
8
-
-
84954971480
-
Models of automatic transfer lines with inventory banks: A review and comarison
-
Buzacott, J.A. and Hanifin, L.E. (1978). Models of automatic transfer lines with inventory banks: A review and comarison. AIIE Transactions, 10:197-207.
-
(1978)
AIIE Transactions
, vol.10
, pp. 197-207
-
-
Buzacott, J.A.1
Hanifin, L.E.2
-
9
-
-
0023533125
-
Matrix-geometric and recursive algorithm solution of a two-stage unreliable flow line
-
Buzacott, J.A. and Kostelski, D. (1987). Matrix-geometric and recursive algorithm solution of a two-stage unreliable flow line. HE Transactions, 19:429-438.
-
(1987)
HE Transactions
, vol.19
, pp. 429-438
-
-
Buzacott, J.A.1
Kostelski, D.2
-
11
-
-
0032048158
-
Bottlenecks in Markovian production lines
-
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S.M. (1998). Bottlenecks in Markovian production lines. IEEE Transactions on Robotics and Automation, 14:352-359.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, pp. 352-359
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
12
-
-
0034291972
-
DT-bottleneck in serial production lines: Theory and application
-
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S.M. (2000). DT-bottleneck in serial production lines: Theory and application. IEEE Transactions on Robotics and Automation, 16:567-580.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, pp. 567-580
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
13
-
-
0345854809
-
C-bottleneck in serial production lines: Identification and application
-
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S.M. (2001). c-bottleneck in serial production lines: Identification and application. Mathematical Problems in Engineering, 6:543-578.
-
(2001)
Mathematical Problems in Engineering
, vol.6
, pp. 543-578
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
14
-
-
0023366315
-
A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
-
Choong, Y.F. and Gershwin, S.B. (1987). A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. HE Transactions, 19:150-159.
-
(1987)
HE Transactions
, vol.19
, pp. 150-159
-
-
Choong, Y.F.1
Gershwin, S.B.2
-
15
-
-
0033097497
-
An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
-
Dallery, Y. and Le Bihan, H. (1999). An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. International Journal of Production Research, 37:1093-1117.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 1093-1117
-
-
Dallery, Y.1
Le Bihan, H.2
-
16
-
-
0024070564
-
An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R., and Xie, X.-L. (1988). An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. HE Transactions, 20:280-283.
-
(1988)
HE Transactions
, vol.20
, pp. 280-283
-
-
Dallery, Y.1
David, R.2
Xie, X.-L.3
-
17
-
-
0024732503
-
Approximate analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R., and Xie, X.-L. (1989). Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34:943-953.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, pp. 943-953
-
-
Dallery, Y.1
David, R.2
Xie, X.-L.3
-
18
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Dallery, Y. and Gershwin, S.B. (1992). Manufacturing flow line systems: A review of models and analytical results. Queuing Systems, 12:3-94.
-
(1992)
Queuing Systems
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
19
-
-
0037085111
-
Buffer capacity to accommodating machine downtime in serial production lines
-
Enginarlar, E., Li, J., Meerkov, S.M., and Zhang, R.Q. (2002). Buffer capacity to accommodating machine downtime in serial production lines. International Journal of Production Research, 40:601-624.
-
(2002)
International Journal of Production Research
, vol.40
, pp. 601-624
-
-
Enginarlar, E.1
Li, J.2
Meerkov, S.M.3
Zhang, R.Q.4
-
21
-
-
0019544056
-
Analysis of transfer lines consisting of two unreliable machines and random processing times and finite storage buffers
-
Gershwin, S.B. and Berman, O. (1981). Analysis of transfer lines consisting of two unreliable machines and random processing times and finite storage buffers. AIIE Transactions, 13:2-11.
-
(1981)
AIIE Transactions
, vol.13
, pp. 2-11
-
-
Gershwin, S.B.1
Berman, O.2
-
22
-
-
0023315347
-
An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
-
Gershwin, S.B. (1987). An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35:291-305.
-
(1987)
Operations Research
, vol.35
, pp. 291-305
-
-
Gershwin, S.B.1
-
23
-
-
0027555001
-
Analysis of behavior of an unreliable n-stage transfer line with (n-1) inter-storage buffers
-
Glassey, C.R. and Hong, Y. (1993). Analysis of behavior of an unreliable n-stage transfer line with (n-1) inter-storage buffers. International Journal of Production Research, 31:519-530.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 519-530
-
-
Glassey, C.R.1
Hong, Y.2
-
24
-
-
0001012830
-
The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems
-
Hillier, F.S. and So, K.C. (1991a). The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems. HE Transactions, 23:198-206.
-
(1991)
HE Transactions
, vol.23
, pp. 198-206
-
-
Hillier, F.S.1
So, K.C.2
-
25
-
-
0026239015
-
The effect of machine breakdowns and internal storage on the performance of production line systems
-
Hillier, F.S. and So, K.C. (1991b). The effect of machine breakdowns and internal storage on the performance of production line systems. International Journal of Production Research, 29:2043-2055.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2043-2055
-
-
Hillier, F.S.1
So, K.C.2
-
26
-
-
0000285320
-
De koster empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
-
Inman, R.R. (1999). De Koster Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operation Management, 8:409-432.
-
(1999)
Production and Operation Management
, vol.8
, pp. 409-432
-
-
Inman, R.R.1
-
27
-
-
0029291550
-
A system-theoretic property of serial production lines: Improvability
-
Jacobs, D.A. and Meerkov, S.M. (1995a). A system-theoretic property of serial production lines: Improvability. International Journal of System Science, 26:95-137.
-
(1995)
International Journal of System Science
, vol.26
, pp. 95-137
-
-
Jacobs, D.A.1
Meerkov, S.M.2
-
29
-
-
0023416254
-
An approximate model of multistage automatic transfer lines with possible scrapping of works-pieces
-
Jafari, M. and Shanthikumar, J.G. (1987). An approximate model of multistage automatic transfer lines with possible scrapping of works-pieces. HE Transactions, 19:252-265.
-
(1987)
HE Transactions
, vol.19
, pp. 252-265
-
-
Jafari, M.1
Shanthikumar, J.G.2
-
30
-
-
0000009851
-
Production lines and internal storage-A review
-
Koenigsberg, E. (1959). Production lines and internal storage-A review. Management Sciences, 5:410-433.
-
(1959)
Management Sciences
, vol.5
, pp. 410-433
-
-
Koenigsberg, E.1
-
32
-
-
0023997862
-
An improved algorithm to approximate the behavior of flow lines
-
De Koster, M.B.M. (1988). An improved algorithm to approximate the behavior of flow lines. International Journal of Production Research, 26:691-700.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 691-700
-
-
De Koster, M.B.M.1
-
33
-
-
84885732078
-
On the coefficients of variation of up-and downtime in manufacturing equipment
-
03-14, Forthcoming in: HE Transactions on Quality and Reliability Engineering
-
Li, J. and Meerkov, S.M. (2003). On the coefficients of variation of up-and downtime in manufacturing equipment. Control Group Report CGR 03-14, Forthcoming in: HE Transactions on Quality and Reliability Engineering.
-
(2003)
Control Group Report CGR
-
-
Li, J.1
Meerkov, S.M.2
-
34
-
-
0025432495
-
Homogeneous, asymptotically reliable serial production lines: Theory and a case study
-
Lim, J.-T., Meerkov, S.M., and Top, F. (1990). Homogeneous, asymptotically reliable serial production lines: Theory and a case study. IEEE Transactions on Automatic Control, 35:524-534.
-
(1990)
IEEE Transactions on Automatic Control
, vol.35
, pp. 524-534
-
-
Lim, J.-T.1
Meerkov, S.M.2
Top, F.3
-
35
-
-
0342524337
-
A zero-buffer equivalence technique for decomposing queueing networks with blocking
-
(H.G. Perros and T. Altiok, eds.) North-Holland
-
Liu, X.-G. and Buzacott, J.A. (1989). A zero-buffer equivalence technique for decomposing queueing networks with blocking. In: Queueing Networks with Blocking (H.G. Perros and T. Altiok, eds.), pages 87-104, North-Holland.
-
(1989)
Queueing Networks with Blocking
, pp. 87-104
-
-
Liu, X.-G.1
Buzacott, J.A.2
-
36
-
-
0030570340
-
Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
-
Papadopoulos, H.T. and Heavey, C. (1996). Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92:1-27.
-
(1996)
European Journal of Operational Research
, vol.92
, pp. 1-27
-
-
Papadopoulos, H.T.1
Heavey, C.2
-
37
-
-
0000816262
-
Buffer allocation in unbalanced three-station lines
-
Powell, S.G. (1994). Buffer allocation in unbalanced three-station lines. International Journal of Production Research, 32:2201-2217.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2201-2217
-
-
Powell, S.G.1
-
39
-
-
0009455220
-
Influence of storage bin capacity on the average standstill time of a production line
-
Sevast'yanov, S.T. (1962). Influence of storage bin capacity on the average standstill time of a production line. Theory of Probability Applications, 429-438.
-
(1962)
Theory of Probability Applications
, pp. 429-438
-
-
Sevast'yanov, S.T.1
-
40
-
-
0009425539
-
Monotonicity and concavity properties in cyclic queueing networks with finite buffers
-
(H.G. Perros and T. Altiok, eds.) North-Holland
-
Shanthikumar, J.G. and Yao, D.D. (1989). Monotonicity and concavity properties in cyclic queueing networks with finite buffers. In: Queueing Networks with Blocking (H.G. Perros and T. Altiok, eds.), pages 325-345, North-Holland.
-
(1989)
Queueing Networks with Blocking
, pp. 325-345
-
-
Shanthikumar, J.G.1
Yao, D.D.2
-
41
-
-
0016931496
-
Allocation of interstage storage along an automatic production line
-
Sheskin, T.J. (1976). Allocation of interstage storage along an automatic production line. AIIE Transaction, 8:146-152.
-
(1976)
AIIE Transaction
, vol.8
, pp. 146-152
-
-
Sheskin, T.J.1
-
42
-
-
0018480174
-
Allocations of buffer capacities for a class of fixed cycle production systems
-
Soyster, A.L., Schmidt, J.W., and Rohrer, M.W. (1979). Allocations of buffer capacities for a class of fixed cycle production systems. AIIE Transactions, 11:140-146.
-
(1979)
AIIE Transactions
, vol.11
, pp. 140-146
-
-
Soyster, A.L.1
Schmidt, J.W.2
Rohrer, M.W.3
-
43
-
-
0031259221
-
A decomposition model for continuous materials flow production systems
-
Tan, T. and Yeralan, S. (1997). A decomposition model for continuous materials flow production systems. International Journal of Production Research, 35:2759-2772.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2759-2772
-
-
Tan, T.1
Yeralan, S.2
-
44
-
-
0242270555
-
Practical considerations in the optimization of flow production systems
-
Tempelmeier, H. (2003). Practical considerations in the optimization of flow production systems. International Journal of Production Research, 41:149-170.
-
(2003)
International Journal of Production Research
, vol.41
, pp. 149-170
-
-
Tempelmeier, H.1
-
45
-
-
0035311479
-
Performance evaluation of unbalanced flow line with general distributed processing times, failures and imperfect production
-
Tempelmeier, H. and Burger, M. (2001). Performance evaluation of unbalanced flow line with general distributed processing times, failures and imperfect production. HE Transactions, 33:293-302.
-
(2001)
HE Transactions
, vol.33
, pp. 293-302
-
-
Tempelmeier, H.1
Burger, M.2
-
46
-
-
0023244473
-
An aggregation technique for performance evaluation of transfer lines with unreliable machine and finite buffers
-
Terracol, C. and David, R. (1987). An aggregation technique for performance evaluation of transfer lines with unreliable machine and finite buffers. Proceedings of IEEE International Conference on Robotics and Automation, pages 1333-1338.
-
(1987)
Proceedings of IEEE International Conference on Robotics and Automation
, pp. 1333-1338
-
-
Terracol, C.1
David, R.2
-
49
-
-
0018444869
-
The effect of interstage buffer storage on the output of two unreliable production units in series with different production rates
-
Wijingaard, J. (1979). The effect of interstage buffer storage on the output of two unreliable production units in series with different production rates. AIIE Transactions, 11:42-47.
-
(1979)
AIIE Transactions
, vol.11
, pp. 42-47
-
-
Wijingaard, J.1
-
50
-
-
0032178271
-
Buffer capacity allocation for a desired throughput of production lines
-
Yamashita, H. and Altiok, T. (1998). Buffer capacity allocation for a desired throughput of production lines. IIE Transactions, 30:883-891.
-
(1998)
IIE Transactions
, vol.30
, pp. 883-891
-
-
Yamashita, H.1
Altiok, T.2
|