메뉴 건너뛰기




Volumn 15, Issue 6, 1996, Pages 367-378

Modeling reentrant manufacturing systems with inspection stations

Author keywords

Inspection and testing; Mean value analysis; Multiclass queuing models; Reentrant lines

Indexed keywords


EID: 0001441631     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0278-6125(97)83051-8     Document Type: Article
Times cited : (46)

References (34)
  • 2
    • 0022161687 scopus 로고
    • Performance evaluation of a flexible manufacturing cell with random feedback flow
    • A. Seidmann, P.J. Schweitzer, and S.Y. Nof, "Performance Evaluation of a Flexible Manufacturing Cell with Random Feedback Flow," International Journal of Production Research (v23, n6, 1985), pp 1171-1184.
    • (1985) International Journal of Production Research , vol.23 , Issue.6 , pp. 1171-1184
    • Seidmann, A.1    Schweitzer, P.J.2    Nof, S.Y.3
  • 3
    • 0040835609 scopus 로고
    • Processing rate optimization for FMSs with distinct multiple job visits to work centers
    • K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers
    • P.J. Schweitzer and A. Seidmann, "Processing Rate Optimization for FMSs with Distinct Multiple Job Visits to Work Centers," Flexible Manufacturing Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, 1989),pp79-84.
    • (1989) Flexible Manufacturing Systems: Operations Research Models and Applications , pp. 79-84
    • Schweitzer, P.J.1    Seidmann, A.2
  • 4
    • 0042940747 scopus 로고    scopus 로고
    • Recursion models for describing and managing transient flow of materials in generalized flowlines
    • S. Saboo, L. Wang, and WE. Wilhelm, "Recursion Models for Describing and Managing Transient Flow of Materials in Generalized Flowlines," Management Science (v35, n6, 1989), pp722-742.
    • Management Science , vol.35 , Issue.1989 , pp. 722-742
    • Saboo, S.1    Wang, L.2    Wilhelm, W.E.3
  • 5
    • 77951537288 scopus 로고
    • The effect of test and rework operations on the flow of materials in circuit card assembly
    • W.E. Wilhelm, "The Effect of Test and Rework Operations on the Flow of Materials in Circuit Card Assembly," Journal of Manufacturing Systems (v10, n3, 1990), pp163-178.
    • (1990) Journal of Manufacturing Systems , vol.10 , Issue.3 , pp. 163-178
    • Wilhelm, W.E.1
  • 10
    • 0029771094 scopus 로고    scopus 로고
    • Performance analysis of scheduling policies in re-entrant manufacturing systems
    • Y. Narahari and L.M. Khan, "Performance Analysis of Scheduling Policies in Re-Entrant Manufacturing Systems," Computers and Operations Research (v23, nl, 1996), pp37-51.
    • (1996) Computers and Operations Research , vol.23 , Issue.1 , pp. 37-51
    • Narahari, Y.1    Khan, L.M.2
  • 11
    • 34250111631 scopus 로고
    • Analysis of flexible manufacturing systems with priority scheduling: PMVA
    • S. Shalev Oren, A. Seidmann, and P.J. Schweitzer, "Analysis of Flexible Manufacturing Systems with Priority Scheduling: PMVA," Annals of Operations Research (v3, 1985), pp1 15-139.
    • (1985) Annals of Operations Research , vol.3 , pp. 115-139
    • Shalev Oren, S.1    Seidmann, A.2    Schweitzer, P.J.3
  • 12
    • 0021623890 scopus 로고
    • Modeling flexible manufacturing systems using mean value analysis
    • R. Suri and R.R. Hildebrant, "Modeling Flexible Manufacturing Systems Using Mean Value Analysis," Journal of Manufacturing Systems (v3, nl, 1984),pp27-38.
    • (1984) Journal of Manufacturing Systems , vol.3 , Issue.1 , pp. 27-38
    • Suri, R.1    Hildebrant, R.R.2
  • 13
    • 77957033398 scopus 로고
    • Performance evaluation of production networks
    • S.C. Graves, A.G. Rinnoy Kan, and P. Zipkin, eds. (Amsterdam: Elsevier Science Publishers
    • R. Suri, J.L. Sanders, and M. Kamath, "Performance Evaluation of Production Networks," Handbooks in OR and MS, v4, S.C. Graves, A.G. Rinnoy Kan, and P. Zipkin, eds. (Amsterdam: Elsevier Science Publishers, 1993), pp199-286.
    • (1993) Handbooks in OR and MS , vol.4 , pp. 199-286
    • Suri, R.1    Sanders, J.L.2    Kamath, M.3
  • 14
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Aug.
    • S.H. Lu, Deepa Ramaswamy, and P.R. Kumar, "Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants," IEEE Transactions on Semiconductor Manufacturing (v7, n3, Aug. 1994), pp374-388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 15
    • 0043113152 scopus 로고
    • Modeling the effect of hot lots in semiconductor manufacturing systems
    • Department of Computer Science and Automation, Indian Institute of Science, June
    • Y. Narahari and L.M. Khan, "Modeling the Effect of Hot Lots in Semiconductor Manufacturing Systems," Technical Report (Department of Computer Science and Automation, Indian Institute of Science, June 1994).
    • (1994) Technical Report
    • Narahari, Y.1    Khan, L.M.2
  • 16
    • 0028494016 scopus 로고
    • Performance bounds for queueing networks and scheduling policies
    • Aug.
    • S. Kumar and P.R. Kumar, "Performance Bounds for Queueing Networks and Scheduling Policies," IEEE Transactions on Automatic Control (v39, n8, Aug. 1994), pp1600-1611.
    • (1994) IEEE Transactions on Automatic Control , vol.39 , Issue.8 , pp. 1600-1611
    • Kumar, S.1    Kumar, P.R.2
  • 17
    • 0041610386 scopus 로고
    • The throughput of closed queueing networks: Functional bounds, asymptotic loss, efficiency, and the harrison-wein conjectures
    • The Coordinated Science Laboratory, University of Illinois at Urbana-Champaign
    • H. Jin, J. Ou, and P.R. Kumar, "The Throughput of Closed Queueing Networks: Functional Bounds, Asymptotic Loss, Efficiency, and the Harrison-Wein Conjectures," Technical Report (The Coordinated Science Laboratory, University of Illinois at Urbana-Champaign, 1995).
    • (1995) Technical Report
    • Jin, H.1    Ou, J.2    Kumar, P.R.3
  • 18
    • 0001484571 scopus 로고
    • Performance bounds for scheduling queueing networks
    • B. Ou and L.M. Wein, "Performance Bounds for Scheduling Queueing Networks," Annals of Applied Probability (v2, n2, 1992), pp460-480.
    • (1992) Annals of Applied Probability , vol.2 , Issue.2 , pp. 460-480
    • Ou, B.1    Wein, L.M.2
  • 19
    • 0002154450 scopus 로고
    • Optimization of multiclass queueing networks: Polyhedral and nonlinear characterizations of achievable performance
    • C. Bertsimas, D. Paschalidis, and J.N. Tsitsiklis, "Optimization of Multiclass Queueing Networks: Polyhedral and Nonlinear Characterizations of Achievable Performance," Annals of Applied Probability (v4, 1994), pp43-75.
    • (1994) Annals of Applied Probability , vol.4 , pp. 43-75
    • Bertsimas, C.1    Paschalidis, D.2    Tsitsiklis, J.N.3
  • 20
    • 0018999918 scopus 로고
    • Mean value analysis of closed multichain queueing networks
    • April
    • M. Reiser and S.S. Lavenberg, "Mean Value Analysis of Closed Multichain Queueing Networks," Journal of the ACM (v27, n2, April 1980), pp313-322.
    • (1980) Journal of the ACM , vol.27 , Issue.2 , pp. 313-322
    • Reiser, M.1    Lavenberg, S.S.2
  • 21
    • 0018722957 scopus 로고
    • Some extensions to multiclass queueing network analysis
    • M. Arato, A. Butrimenko, and E. Gelenbe, eds. (Amsterdam: North-Holland
    • Y. Bard, "Some Extensions to Multiclass Queueing Network Analysis," Performance of Computer Systems, M. Arato, A. Butrimenko, and E. Gelenbe, eds. (Amsterdam: North-Holland, 1979), pp51-61.
    • (1979) Performance of Computer Systems , pp. 51-61
    • Bard, Y.1
  • 22
    • 0024646115 scopus 로고
    • Modeling server unreliability in closed queueing networks
    • C.S. Ramanjaneyulu and V.VS. Sarma, "Modeling Server Unreliability in Closed Queueing Networks," IEEE Transactions on Reliability (v38, nl, 1989), pp90-95.
    • (1989) IEEE Transactions on Reliability , vol.38 , Issue.1 , pp. 90-95
    • Ramanjaneyulu, C.S.1    Sarma, V.V.S.2
  • 25
  • 27
    • 0026141756 scopus 로고
    • Optimizing processing rates for flexible manufacturing systems
    • April
    • P.J. Schweitzer and A. Seidmann, "Optimizing Processing Rates for Flexible Manufacturing Systems," Management Science (v37, n4, April 1991),pp454-466.
    • (1991) Management Science , vol.37 , Issue.4 , pp. 454-466
    • Schweitzer, P.J.1    Seidmann, A.2
  • 28
    • 0039057232 scopus 로고
    • An approximation technique for queueing networks with preemptive priority queues
    • Department of Computer Science, University of Texas at Austin
    • K.M. Chandy and M.S. Lakshmi, "An Approximation Technique for Queueing Networks with Preemptive Priority Queues," Technical Report (Department of Computer Science, University of Texas at Austin, 1983).
    • (1983) Technical Report
    • Chandy, K.M.1    Lakshmi, M.S.2
  • 29
    • 0024030231 scopus 로고
    • A new MVA based approximation for closed queueing networks with a preemptive priority server
    • A.B. Bondi and Y.M. Chung, "A New MVA Based Approximation for Closed Queueing Networks with a Preemptive Priority Server," Performance Evaluation (v8, 1988), pp195-221.
    • (1988) Performance Evaluation , vol.8 , pp. 195-221
    • Bondi, A.B.1    Chung, Y.M.2
  • 31
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Aug.
    • L.M. Wein, "Scheduling Semiconductor Wafer Fabrication," IEEE Transactions on Semiconductdr Manufacturing (v 1, n3, Aug. 1988), ppl 15-130.
    • (1988) IEEE Transactions on Semiconductdr Manufacturing , vol.1 , Issue.3 , pp. 115-130
    • Wein, L.M.1
  • 33
    • 0000861722 scopus 로고
    • A Proof of the Queueing Formula l= λw
    • J.D.C. Little, "A Proof of the Queueing Formula /= λw, " Operations Research (v9, 1961), pp383-385.
    • (1961) Operations Research , vol.9 , pp. 383-385
    • Little, J.D.C.1
  • 34
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • Dec.
    • S.H. Lu and P.R. Kumar, "Distributed Scheduling Based on Due Dates and Buffer Priorities," IEEE Transactions on Automatic Control (v36, n12, Dec. 1991), pp1406-1416.
    • (1991) IEEE Transactions on Automatic Control , vol.36 , Issue.12 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.