메뉴 건너뛰기




Volumn 35, Issue 10, 1997, Pages 2759-2772

A decomposition model for continuous materials flow production systems

Author keywords

[No Author keywords available]

Indexed keywords

APPROXIMATION THEORY; CONVERGENCE OF NUMERICAL METHODS; FLEXIBLE MANUFACTURING SYSTEMS; ITERATIVE METHODS; MATHEMATICAL MODELS;

EID: 0031259221     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497194435     Document Type: Article
Times cited : (11)

References (18)
  • 1
    • 0020276011 scopus 로고
    • Approximate analysis of exponential tandem queues with blocking
    • Altiok, T., 1982, Approximate analysis of exponential tandem queues with blocking. European Journal of Operations Research, 11, 390-398.
    • (1982) European Journal of Operations Research , vol.11 , pp. 390-398
    • Altiok, T.1
  • 2
    • 0024700721 scopus 로고
    • Approximate analysis of queues in series with phase-type service times and blocking
    • Altiok, T., 1989, Approximate analysis of queues in series with phase-type service times and blocking. Operations Research, 37, 601-610.
    • (1989) Operations Research , vol.37 , pp. 601-610
    • Altiok, T.1
  • 3
    • 0005378267 scopus 로고
    • Multistage flow line analysis with the stopped arrival queue model
    • Buzacott, J. A., Liu, X. G., and Shantikumar, J. G., 1995, Multistage flow line analysis with the stopped arrival queue model. IIE Transactions, 27, 444-455.
    • (1995) IIE Transactions , vol.27 , pp. 444-455
    • Buzacott, J.A.1    Liu, X.G.2    Shantikumar, J.G.3
  • 4
    • 0023366315 scopus 로고
    • A decomposition method for the approximate evaluation and capacitated transfer lines with unreliable machines and random processing times
    • Choong, Y. E., and Gershwin, S. B., 1987, A decomposition method for the approximate evaluation and capacitated transfer lines with unreliable machines and random processing times. IIE Transactions, 19, 150-159.
    • (1987) IIE Transactions , vol.19 , pp. 150-159
    • Choong, Y.E.1    Gershwin, S.B.2
  • 5
    • 0000755068 scopus 로고
    • On decomposition methods for tandem queueing networks with blocking
    • Dallery, Y., and Frein, Y., 1993, On decomposition methods for tandem queueing networks with blocking. Operations Research, 41 (2), 386-399.
    • (1993) Operations Research , vol.41 , Issue.2 , pp. 386-399
    • Dallery, Y.1    Frein, Y.2
  • 7
    • 0024070564 scopus 로고
    • An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R., and Xie, X. L., 1988, An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20 (3), 280-283.
    • (1988) IIE Transactions , vol.20 , Issue.3 , pp. 280-283
    • Dallery, Y.1    David, R.2    Xie, X.L.3
  • 8
    • 0024732503 scopus 로고
    • Approximate analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R., and Xie, X. L., 1988b, Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions of Automatic Control, 34, 943-953.
    • (1988) IEEE Transactions of Automatic Control , vol.34 , pp. 943-953
    • Dallery, Y.1    David, R.2    Xie, X.L.3
  • 10
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queue with finite storage space and blocking
    • Gershwin, S. B., 1987, An efficient decomposition method for the approximate evaluation of tandem queue with finite storage space and blocking. Operations Research, 35 (2), 291-305.
    • (1987) Operations Research , vol.35 , Issue.2 , pp. 291-305
    • Gershwin, S.B.1
  • 11
    • 0027555001 scopus 로고
    • Analysis of behaviour of an unreliable n-stage transfer line with (N - 1) inter-stage storage buffers
    • Glassey, C. R., and Hong, Y., 1993, Analysis of behaviour of an unreliable n-stage transfer line with (n - 1) inter-stage storage buffers. International Journal of Production Research, 31 (3), 519-530.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 519-530
    • Glassey, C.R.1    Hong, Y.2
  • 12
    • 0008896143 scopus 로고
    • PhD thesis, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL
    • Tan, B., 1994, A decomposition method for multistation production systems. PhD thesis, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL.
    • (1994) A Decomposition Method for Multistation Production Systems.
    • Tan, B.1
  • 15
    • 0030122940 scopus 로고
    • A fuzzy decomposition method for multistation production systems subject to blocking
    • Tan, B., and Yeralan, S., 1995, A fuzzy decomposition method for multistation production systems subject to blocking. International Journal of Production Economics, 42 (3), 245-262.
    • (1995) International Journal of Production Economics , vol.42 , Issue.3 , pp. 245-262
    • Tan, B.1    Yeralan, S.2
  • 16
    • 0023366797 scopus 로고
    • A general model of a production line with intermediate buffer and station breakdown
    • Yeralan, S., and Muth, E. J., 1987, A general model of a production line with intermediate buffer and station breakdown. IIE Transactions, 19 (2), 130-139.
    • (1987) IIE Transactions , vol.19 , Issue.2 , pp. 130-139
    • Yeralan, S.1    Muth, E.J.2
  • 17
    • 0042167888 scopus 로고
    • Research Report 92-24, Industrial and Systems Engineering, University of Florida, Gainesville, FL
    • Yeralan, S., and Tan, B., 1992, Approximate solutions to multistation production lines. Research Report 92-24, Industrial and Systems Engineering, University of Florida, Gainesville, FL.
    • (1992) Approximate Solutions to Multistation Production Lines.
    • Yeralan, S.1    Tan, B.2
  • 18
    • 0031237423 scopus 로고    scopus 로고
    • A station model for continuous materials flow production
    • Yeralan, S., and Tan, B., 1997, A station model for continuous materials flow production. International Journal of Production Research, 35 (9), 2525-2541.
    • (1997) International Journal of Production Research , vol.35 , Issue.9 , pp. 2525-2541
    • Yeralan, S.1    Tan, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.