2
-
-
0026138752
-
The KAT (Knowledge-Action-Transformation) approach to the modeling and evaluation of reliability and availability growth
-
April
-
J. Laprie, K. Kanoun, C. Beounes, and M. Kaaniche, "The KAT (Knowledge-Action-Transformation) Approach to the Modeling and Evaluation of Reliability and Availability Growth," IEEE Transactions on Software Engineering (v17, n4, April 1991), pp370-382.
-
(1991)
IEEE Transactions on Software Engineering
, vol.17
, Issue.4
, pp. 370-382
-
-
Laprie, J.1
Kanoun, K.2
Beounes, C.3
Kaaniche, M.4
-
3
-
-
0026393398
-
Decision support for improving systems reliability by redundancy
-
D. Petrovic, "Decision Support for Improving Systems Reliability by Redundancy," European Journal of Operational Research (v55, 1991), pp357-367.
-
(1991)
European Journal of Operational Research
, vol.55
, pp. 357-367
-
-
Petrovic, D.1
-
5
-
-
0026929007
-
A Two-Phase procedure for the study of computer network reliability in automated manufacturing systems
-
T. Gupta and E.S. Abuelyaman, "A Two-Phase Procedure for the Study of Computer Network Reliability in Automated Manufacturing Systems," Computers in Industry (v20, 1992), pp335-344.
-
(1992)
Computers in Industry
, vol.20
, pp. 335-344
-
-
Gupta, T.1
Abuelyaman, E.S.2
-
6
-
-
0023016804
-
EXMAS-Knowledge based system for maintenance of complex mechanical systems
-
V.D. Majstorovic and V.R. Milacic, "EXMAS-Knowledge Based System for Maintenance of Complex Mechanical Systems," Robotics and Computer-Integrated Manufacturing (v3, n2, 1987), pp 187-193.
-
(1987)
Robotics and Computer-Integrated Manufacturing
, vol.3
, Issue.2
, pp. 187-193
-
-
Majstorovic, V.D.1
Milacic, V.R.2
-
7
-
-
0025505730
-
Expert systems for maintenance in the CIM concept
-
V.D. Majstorovic and V.R. Milacic, "Expert Systems for Maintenance in the CIM Concept," Computers in Industry (v15, 1990), pp83-93.
-
(1990)
Computers in Industry
, vol.15
, pp. 83-93
-
-
Majstorovic, V.D.1
Milacic, V.R.2
-
8
-
-
0026909646
-
Celeritas: A coloured petri net approach to simulation and control of flexible manufacturing systems
-
R. Cossins and P. Ferreira, "Celeritas: A Coloured Petri Net Approach to Simulation and Control of Flexible Manufacturing Systems," International Journal of Production Research (v30, n8, 1992), pp1925-1956.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.8
, pp. 1925-1956
-
-
Cossins, R.1
Ferreira, P.2
-
9
-
-
0025554695
-
TORA: A petri net based tool for rapid prototyping of FMS control systems and its application to assembly
-
A. Micovsky, L. Sesera, M. Veishab, and M. Albert, "TORA: A Petri Net Based Tool for Rapid Prototyping of FMS Control Systems and Its Application to Assembly," Computers in Industry (v15, n4, 1990), pp279-292.
-
(1990)
Computers in Industry
, vol.15
, Issue.4
, pp. 279-292
-
-
Micovsky, A.1
Sesera, L.2
Veishab, M.3
Albert, M.4
-
10
-
-
0026102908
-
Modeling and On-Line scheduling of flexible manufacturing systems using stochastic petri nets
-
Feb.
-
I. Hatono, K. Yamagata, and H. Tamura, "Modeling and On-Line Scheduling of Flexible Manufacturing Systems Using Stochastic Petri Nets," IEEE Transactions on Software Engineering (v17, n2, Feb. 1991), pp126-132.
-
(1991)
IEEE Transactions on Software Engineering
, vol.17
, Issue.2
, pp. 126-132
-
-
Hatono, I.1
Yamagata, K.2
Tamura, H.3
-
11
-
-
0019544056
-
Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
-
Mar.
-
S.B. Gershwin and O. Berman, "Analysis of Transfer Lines Consisting of Two Unreliable Machines with Random Processing Times and Finite Storage Buffers," AIIE Transactions (v13, n1, Mar. 1981), pp2-11.
-
(1981)
AIIE Transactions
, vol.13
, Issue.1
, pp. 2-11
-
-
Gershwin, S.B.1
Berman, O.2
-
12
-
-
0002058236
-
The Analysis of a production line with unreliable machines and random processing times
-
Mar.
-
Y. Hong, C.R. Glassey, and D. Seong, "The Analysis of a Production Line with Unreliable Machines and Random Processing Times," HE Transactions (v24, n1, Mar. 1992), pp77-83.
-
(1992)
HE Transactions
, vol.24
, Issue.1
, pp. 77-83
-
-
Hong, Y.1
Glassey, C.R.2
Seong, D.3
-
13
-
-
0020721475
-
Modeling and analysis of Three-Stage transfer lines with unreliable machines and finite buffers
-
S.B. Gershwin and I.C. Schick, "Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers," Operations Research (v31, 1983), pp354-380.
-
(1983)
Operations Research
, vol.31
, pp. 354-380
-
-
Gershwin, S.B.1
Schick, I.C.2
-
14
-
-
0023315347
-
An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
-
Mar.-Apr.
-
S.B. Gershwin, "An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking," Operations Research (v35, n2, Mar.-Apr. 1987), pp291-305.
-
(1987)
Operations Research
, vol.35
, Issue.2
, pp. 291-305
-
-
Gershwin, S.B.1
-
15
-
-
0023366315
-
A Decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
-
June
-
Y.F. Choong and S.B. Gershwin, "A Decomposition Method for the Approximate Evaluation of Capacitated Transfer Lines with Unreliable Machines and Random Processing Times," IIE Transactions (v19, June 1987), pp150-159.
-
(1987)
IIE Transactions
, vol.19
, pp. 150-159
-
-
Choong, Y.F.1
Gershwin, S.B.2
-
16
-
-
0025566605
-
Production rate of transfer lines without buffer storage
-
Dec.
-
C. Commault and Y. Dallery, "Production Rate of Transfer Lines Without Buffer Storage," IIE Transactions (v22, Dec. 1990), pp315-329.
-
(1990)
IIE Transactions
, vol.22
, pp. 315-329
-
-
Commault, C.1
Dallery, Y.2
-
17
-
-
84873013614
-
Modeling and analysis of assembly systems with unreliable machines and finite buffers
-
Dec.
-
M.D. Mascolo, Y. Dallery, and R. David, "Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffers," IIE Transactions (v23, n4, Dec. 1991), pp315-330.
-
(1991)
IIE Transactions
, vol.23
, Issue.4
, pp. 315-330
-
-
Mascolo, M.D.1
Dallery, Y.2
David, R.3
-
18
-
-
0027342083
-
Performance analysis of a transfer line with unreliable machines and finite buffers
-
Jan.
-
X. Xie, "Performance Analysis of a Transfer Line with Unreliable Machines and Finite Buffers," IIE Transactions (v25, n1, Jan. 1993), pp99-108.
-
(1993)
IIE Transactions
, vol.25
, Issue.1
, pp. 99-108
-
-
Xie, X.1
-
19
-
-
0008236264
-
Representation and analysis of transfer lines with machines that have different processing rates
-
S.B. Gershwin, "Representation and Analysis of Transfer Lines with Machines That Have Different Processing Rates," Annals of Operations Research (v9, 1987), pp511-530.
-
(1987)
Annals of Operations Research
, vol.9
, pp. 511-530
-
-
Gershwin, S.B.1
-
20
-
-
0024070564
-
An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
-
Sept.
-
Y. Dallery, R. David, and X.L. Xie, "An Efficient Algorithm for Analysis of Transfer Lines with Unreliable Machines and Finite Buffers," IIE Transactions (v20, n3, Sept. 1988), pp280-283.
-
(1988)
IIE Transactions
, vol.20
, Issue.3
, pp. 280-283
-
-
Dallery, Y.1
David, R.2
Xie, X.L.3
-
21
-
-
0024732503
-
Approximate analysis of transfer lines with unreliable machines and finite buffers
-
Sept.
-
Y. Dallery, R. David, and X.L. Xie, "Approximate Analysis of Transfer Lines with Unreliable Machines and Finite Buffers," IEEE Transactions on Automatic Control (v34, n9, Sept. 1989), pp943-953.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, Issue.9
, pp. 943-953
-
-
Dallery, Y.1
David, R.2
Xie, X.L.3
|