메뉴 건너뛰기




Volumn 15, Issue 3, 1996, Pages 143-154

Analytical modeling and analysis of flexible manufacturing systems considering system component failure/repair rates

Author keywords

Analytical modeling; Flexible manufacturing systems; FMS Failure Repair rates; Modeling and analysis of FMS

Indexed keywords


EID: 70449631886     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/0278-6125(96)89567-7     Document Type: Article
Times cited : (4)

References (21)
  • 2
    • 0026138752 scopus 로고
    • The KAT (Knowledge-Action-Transformation) approach to the modeling and evaluation of reliability and availability growth
    • April
    • J. Laprie, K. Kanoun, C. Beounes, and M. Kaaniche, "The KAT (Knowledge-Action-Transformation) Approach to the Modeling and Evaluation of Reliability and Availability Growth," IEEE Transactions on Software Engineering (v17, n4, April 1991), pp370-382.
    • (1991) IEEE Transactions on Software Engineering , vol.17 , Issue.4 , pp. 370-382
    • Laprie, J.1    Kanoun, K.2    Beounes, C.3    Kaaniche, M.4
  • 3
    • 0026393398 scopus 로고
    • Decision support for improving systems reliability by redundancy
    • D. Petrovic, "Decision Support for Improving Systems Reliability by Redundancy," European Journal of Operational Research (v55, 1991), pp357-367.
    • (1991) European Journal of Operational Research , vol.55 , pp. 357-367
    • Petrovic, D.1
  • 5
    • 0026929007 scopus 로고
    • A Two-Phase procedure for the study of computer network reliability in automated manufacturing systems
    • T. Gupta and E.S. Abuelyaman, "A Two-Phase Procedure for the Study of Computer Network Reliability in Automated Manufacturing Systems," Computers in Industry (v20, 1992), pp335-344.
    • (1992) Computers in Industry , vol.20 , pp. 335-344
    • Gupta, T.1    Abuelyaman, E.S.2
  • 6
    • 0023016804 scopus 로고
    • EXMAS-Knowledge based system for maintenance of complex mechanical systems
    • V.D. Majstorovic and V.R. Milacic, "EXMAS-Knowledge Based System for Maintenance of Complex Mechanical Systems," Robotics and Computer-Integrated Manufacturing (v3, n2, 1987), pp 187-193.
    • (1987) Robotics and Computer-Integrated Manufacturing , vol.3 , Issue.2 , pp. 187-193
    • Majstorovic, V.D.1    Milacic, V.R.2
  • 7
    • 0025505730 scopus 로고
    • Expert systems for maintenance in the CIM concept
    • V.D. Majstorovic and V.R. Milacic, "Expert Systems for Maintenance in the CIM Concept," Computers in Industry (v15, 1990), pp83-93.
    • (1990) Computers in Industry , vol.15 , pp. 83-93
    • Majstorovic, V.D.1    Milacic, V.R.2
  • 8
    • 0026909646 scopus 로고
    • Celeritas: A coloured petri net approach to simulation and control of flexible manufacturing systems
    • R. Cossins and P. Ferreira, "Celeritas: A Coloured Petri Net Approach to Simulation and Control of Flexible Manufacturing Systems," International Journal of Production Research (v30, n8, 1992), pp1925-1956.
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1925-1956
    • Cossins, R.1    Ferreira, P.2
  • 9
    • 0025554695 scopus 로고
    • TORA: A petri net based tool for rapid prototyping of FMS control systems and its application to assembly
    • A. Micovsky, L. Sesera, M. Veishab, and M. Albert, "TORA: A Petri Net Based Tool for Rapid Prototyping of FMS Control Systems and Its Application to Assembly," Computers in Industry (v15, n4, 1990), pp279-292.
    • (1990) Computers in Industry , vol.15 , Issue.4 , pp. 279-292
    • Micovsky, A.1    Sesera, L.2    Veishab, M.3    Albert, M.4
  • 10
    • 0026102908 scopus 로고
    • Modeling and On-Line scheduling of flexible manufacturing systems using stochastic petri nets
    • Feb.
    • I. Hatono, K. Yamagata, and H. Tamura, "Modeling and On-Line Scheduling of Flexible Manufacturing Systems Using Stochastic Petri Nets," IEEE Transactions on Software Engineering (v17, n2, Feb. 1991), pp126-132.
    • (1991) IEEE Transactions on Software Engineering , vol.17 , Issue.2 , pp. 126-132
    • Hatono, I.1    Yamagata, K.2    Tamura, H.3
  • 11
    • 0019544056 scopus 로고
    • Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
    • Mar.
    • S.B. Gershwin and O. Berman, "Analysis of Transfer Lines Consisting of Two Unreliable Machines with Random Processing Times and Finite Storage Buffers," AIIE Transactions (v13, n1, Mar. 1981), pp2-11.
    • (1981) AIIE Transactions , vol.13 , Issue.1 , pp. 2-11
    • Gershwin, S.B.1    Berman, O.2
  • 12
    • 0002058236 scopus 로고
    • The Analysis of a production line with unreliable machines and random processing times
    • Mar.
    • Y. Hong, C.R. Glassey, and D. Seong, "The Analysis of a Production Line with Unreliable Machines and Random Processing Times," HE Transactions (v24, n1, Mar. 1992), pp77-83.
    • (1992) HE Transactions , vol.24 , Issue.1 , pp. 77-83
    • Hong, Y.1    Glassey, C.R.2    Seong, D.3
  • 13
    • 0020721475 scopus 로고
    • Modeling and analysis of Three-Stage transfer lines with unreliable machines and finite buffers
    • S.B. Gershwin and I.C. Schick, "Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers," Operations Research (v31, 1983), pp354-380.
    • (1983) Operations Research , vol.31 , pp. 354-380
    • Gershwin, S.B.1    Schick, I.C.2
  • 14
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Mar.-Apr.
    • S.B. Gershwin, "An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking," Operations Research (v35, n2, Mar.-Apr. 1987), pp291-305.
    • (1987) Operations Research , vol.35 , Issue.2 , pp. 291-305
    • Gershwin, S.B.1
  • 15
    • 0023366315 scopus 로고
    • A Decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times
    • June
    • Y.F. Choong and S.B. Gershwin, "A Decomposition Method for the Approximate Evaluation of Capacitated Transfer Lines with Unreliable Machines and Random Processing Times," IIE Transactions (v19, June 1987), pp150-159.
    • (1987) IIE Transactions , vol.19 , pp. 150-159
    • Choong, Y.F.1    Gershwin, S.B.2
  • 16
    • 0025566605 scopus 로고
    • Production rate of transfer lines without buffer storage
    • Dec.
    • C. Commault and Y. Dallery, "Production Rate of Transfer Lines Without Buffer Storage," IIE Transactions (v22, Dec. 1990), pp315-329.
    • (1990) IIE Transactions , vol.22 , pp. 315-329
    • Commault, C.1    Dallery, Y.2
  • 17
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliable machines and finite buffers
    • Dec.
    • M.D. Mascolo, Y. Dallery, and R. David, "Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffers," IIE Transactions (v23, n4, Dec. 1991), pp315-330.
    • (1991) IIE Transactions , vol.23 , Issue.4 , pp. 315-330
    • Mascolo, M.D.1    Dallery, Y.2    David, R.3
  • 18
    • 0027342083 scopus 로고
    • Performance analysis of a transfer line with unreliable machines and finite buffers
    • Jan.
    • X. Xie, "Performance Analysis of a Transfer Line with Unreliable Machines and Finite Buffers," IIE Transactions (v25, n1, Jan. 1993), pp99-108.
    • (1993) IIE Transactions , vol.25 , Issue.1 , pp. 99-108
    • Xie, X.1
  • 19
    • 0008236264 scopus 로고
    • Representation and analysis of transfer lines with machines that have different processing rates
    • S.B. Gershwin, "Representation and Analysis of Transfer Lines with Machines That Have Different Processing Rates," Annals of Operations Research (v9, 1987), pp511-530.
    • (1987) Annals of Operations Research , vol.9 , pp. 511-530
    • Gershwin, S.B.1
  • 20
    • 0024070564 scopus 로고
    • An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
    • Sept.
    • Y. Dallery, R. David, and X.L. Xie, "An Efficient Algorithm for Analysis of Transfer Lines with Unreliable Machines and Finite Buffers," IIE Transactions (v20, n3, Sept. 1988), pp280-283.
    • (1988) IIE Transactions , vol.20 , Issue.3 , pp. 280-283
    • Dallery, Y.1    David, R.2    Xie, X.L.3
  • 21
    • 0024732503 scopus 로고
    • Approximate analysis of transfer lines with unreliable machines and finite buffers
    • Sept.
    • Y. Dallery, R. David, and X.L. Xie, "Approximate Analysis of Transfer Lines with Unreliable Machines and Finite Buffers," IEEE Transactions on Automatic Control (v34, n9, Sept. 1989), pp943-953.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , Issue.9 , pp. 943-953
    • Dallery, Y.1    David, R.2    Xie, X.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.