-
1
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Y. Dallery and S. B. Gershwin, "Manufacturing flow line systems: A review of models and analytical results," Queu. Syst., vol. 12, pp. 3-94, 1992.
-
(1992)
Queu. Syst.
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
2
-
-
0030570340
-
Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
-
H. T. Papadopoulos and C. Heavey, "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," Eur. J. Oper. Res., vol. 92, pp. 1-27, 1996.
-
(1996)
Eur. J. Oper. Res.
, vol.92
, pp. 1-27
-
-
Papadopoulos, H.T.1
Heavey, C.2
-
7
-
-
0023315347
-
An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
-
S. B. Gershwin, "An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking," Oper. Res., vol. 35, pp. 291-305, 1987.
-
(1987)
Oper. Res.
, vol.35
, pp. 291-305
-
-
Gershwin, S.B.1
-
8
-
-
0023329472
-
Estimation of the line efficiency by aggregation
-
M. B. M. De Koster, "Estimation of the line efficiency by aggregation," Int. J. Prod. Res., vol. 25, pp. 615-626, 1987.
-
(1987)
Int. J. Prod. Res.
, vol.25
, pp. 615-626
-
-
De Koster, M.B.M.1
-
9
-
-
0023244473
-
An aggregation technique for performance evaluation of transfer lines with unreliable machine and finite buffers
-
C. Terracol and R. David, "An aggregation technique for performance evaluation of transfer lines with unreliable machine and finite buffers," in Proc. IEEE Int. Conf. Robotics Automation, 1987, pp. 1333-1338.
-
(1987)
Proc. IEEE Int. Conf. Robotics Automation
, pp. 1333-1338
-
-
Terracol, C.1
David, R.2
-
10
-
-
0024070564
-
An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
-
Y. Dallery, R. David, and X.-L. Xie, "An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers," IIE Trans., vol. 20, pp. 280-283, 1988.
-
(1988)
IIE Trans.
, vol.20
, pp. 280-283
-
-
Dallery, Y.1
David, R.2
Xie, X.-L.3
-
11
-
-
0024732503
-
Approximate analysis of transfer lines with unreliable machines and finite buffers
-
_, "Approximate analysis of transfer lines with unreliable machines and finite buffers," IEEE Trans. Automat. Contr., vol. 34, pp. 943-953, 1989.
-
(1989)
IEEE Trans. Automat. Contr.
, vol.34
, pp. 943-953
-
-
-
12
-
-
0025432495
-
Homogeneous, asymptotically reliable serial production lines: Theory and a case study
-
J.-T. Lim, S. M. Meerkov, and F. Top, "Homogeneous, asymptotically reliable serial production lines: Theory and a case study," IEEE Trans. Automat. Contr., vol. 35, pp. 524-534, 1990.
-
(1990)
IEEE Trans. Automat. Contr.
, vol.35
, pp. 524-534
-
-
Lim, J.-T.1
Meerkov, S.M.2
Top, F.3
-
13
-
-
0000440767
-
Assembly/disassembly systems: An efficient decomposition algorithm for tree-structured networks
-
S. B. Gershwin, "Assembly/disassembly systems: An efficient decomposition algorithm for tree-structured networks," IIE Trans., vol. 23, pp. 315-331, 1991.
-
(1991)
IIE Trans.
, vol.23
, pp. 315-331
-
-
Gershwin, S.B.1
-
14
-
-
84873013614
-
Modeling and analysis of assembly systems with unreliable machines and finite buffers
-
M. Di Mascolo, R. David, and Y. Dallery, "Modeling and analysis of assembly systems with unreliable machines and finite buffers," IIE Trans., vol. 23, pp. 315-330, 1991.
-
(1991)
IIE Trans.
, vol.23
, pp. 315-330
-
-
Di Mascolo, M.1
David, R.2
Dallery, Y.3
-
15
-
-
0029291550
-
A system-theoretic property of serial production lines: Improvability
-
D. A. Jacobs and S. M. Meerkov, "A system-theoretic property of serial production lines: Improvability," Int. J. Syst. Sci., vol. 26, pp. 95-137, 1995.
-
(1995)
Int. J. Syst. Sci.
, vol.26
, pp. 95-137
-
-
Jacobs, D.A.1
Meerkov, S.M.2
-
16
-
-
0002758765
-
Improvability theory for assembly systems: Two component - One assembly machine case
-
C.-T. Kuo, J.-T. Lim, S. M. Meerkov, and E. Park, "Improvability theory for assembly systems: Two component - One assembly machine case," Math. Prob. Eng., vol. 3, pp. 95-171, 1997.
-
(1997)
Math. Prob. Eng.
, vol.3
, pp. 95-171
-
-
Kuo, C.-T.1
Lim, J.-T.2
Meerkov, S.M.3
Park, E.4
-
17
-
-
0034291972
-
DT-bottlenecks in serial production lines: Theory and application
-
S.-Y. Chiang, C.-T. Kuo, and S. M. Meerkov, "DT-bottlenecks in serial production lines: Theory and application," IEEE Trans. Robot. Automat., vol. 16, pp. 567-580, 2000.
-
(2000)
IEEE Trans. Robot. Automat.
, vol.16
, pp. 567-580
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
18
-
-
0006506394
-
Improvability theory of assembly systems I: Problem formulation and performance evaluation
-
S.-Y. Chiang, C.-T. Kuo, J.-T. Lim, and S. M. Meerkov, "Improvability theory of assembly systems I: Problem formulation and performance evaluation," Math. Prob. Eng., vol. 6, pp. 321-357, 2000.
-
(2000)
Math. Prob. Eng.
, vol.6
, pp. 321-357
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
19
-
-
0345854809
-
c-Bottlenecks in serial production lines: Identification and application
-
S.-Y. Chiang, C.-T. Kuo, and S. M. Meerkov, "c-Bottlenecks in serial production lines: Identification and application," Math. Prob. Eng., vol. 6, pp. 543-578, 2001.
-
(2001)
Math. Prob. Eng.
, vol.6
, pp. 543-578
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
20
-
-
0025414457
-
Approximate models of assembly systems with finite inventory banks
-
X.-G. Liu and J. A. Buzacott, "Approximate models of assembly systems with finite inventory banks," Eur. J. Oper. Res., vol. 45, pp. 143-154, 1990.
-
(1990)
Eur. J. Oper. Res.
, vol.45
, pp. 143-154
-
-
Liu, X.-G.1
Buzacott, J.A.2
-
21
-
-
0003228793
-
Availability and average inventory of balanced assembly-like flow systems
-
J. T. Simon and W. J, Hopp, "Availability and average inventory of balanced assembly-like flow systems," IIE Trans., vol. 23, pp. 161-168, 1991.
-
(1991)
IIE Trans.
, vol.23
, pp. 161-168
-
-
Simon, J.T.1
Hopp, W.J.2
-
22
-
-
0031701532
-
Performance analysis of assembly/disassembly systems with unreliable machines and random processing times
-
K.-C. Jeong and Y.-D. Kim, "Performance analysis of assembly/disassembly systems with unreliable machines and random processing times," IIE Trans., vol. 30, pp. 41-53, 1998.
-
(1998)
IIE Trans.
, vol.30
, pp. 41-53
-
-
Jeong, K.-C.1
Kim, Y.-D.2
-
23
-
-
12844268351
-
-
Ph.D.dissertation, Dept. EECS, Univ. Michigan, Ann Arbor
-
S.-Y. Chiang, "Bottlenecks in production systems with markovian machines: Theory and applications," Ph.D.dissertation, Dept. EECS, Univ. Michigan, Ann Arbor, 1999.
-
(1999)
Bottlenecks in Production Systems with Markovian Machines: Theory and Applications
-
-
Chiang, S.-Y.1
-
24
-
-
0006486130
-
-
Ph.D. dissertation, Dept. EECS, Univ. Michigan, Ann Arbor
-
J. Li, "Production variability in manufacturing systems: A systems approach," Ph.D. dissertation, Dept. EECS, Univ. Michigan, Ann Arbor, 2000.
-
(2000)
Production Variability in Manufacturing Systems: A Systems Approach
-
-
Li, J.1
-
25
-
-
0345795631
-
Improvability theory of assembly systems II: Improvability indicators and case study
-
S.-Y. Chiang, C.-T. Kuo, J.-T. Lim, and S. M. Meerkov, "Improvability theory of assembly systems II: Improvability indicators and case study," Math. Prob. Eng., vol. 6, pp. 359-393, 2000.
-
(2000)
Math. Prob. Eng.
, vol.6
, pp. 359-393
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Lim, J.-T.3
Meerkov, S.M.4
-
26
-
-
0034397418
-
A decomposition method for analyzing inhomogeneous assembly/disassembly systems
-
S. B. Gershwin and M. H. Burman, "A decomposition method for analyzing inhomogeneous assembly/disassembly systems," Ann. Oper. Res., vol. 93, pp. 91-115, 2000.
-
(2000)
Ann. Oper. Res.
, vol.93
, pp. 91-115
-
-
Gershwin, S.B.1
Burman, M.H.2
-
27
-
-
0017504870
-
The output of a two-stage system with unreliable machines and limited storage
-
E. Ignall and A. Silver, "The output of a two-stage system with unreliable machines and limited storage," AIIE Trans., vol. 9, pp. 183-188, 1977.
-
(1977)
AIIE Trans.
, vol.9
, pp. 183-188
-
-
Ignall, E.1
Silver, A.2
-
28
-
-
0000357748
-
Stochastic theory of a fluid model of producers and consumers coupled by a buffer
-
D. Mitra, "Stochastic theory of a fluid model of producers and consumers coupled by a buffer," Adv. App. Prob., vol. 20, pp. 646-676, 1988.
-
(1988)
Adv. App. Prob.
, vol.20
, pp. 646-676
-
-
Mitra, D.1
-
29
-
-
0023401973
-
The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage
-
T. Iyama and S. Ito, "The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage," Int. J. Prod. Res., vol. 25, pp. 1157-1179, 1987.
-
(1987)
Int. J. Prod. Res.
, vol.25
, pp. 1157-1179
-
-
Iyama, T.1
Ito, S.2
-
30
-
-
0012550155
-
Performance evaluation of series-parallel systems
-
R. Alves, "Performance evaluation of series-parallel systems," J. Manufact. Oper. Manag., vol. 3, pp. 224-250, 1990.
-
(1990)
J. Manufact. Oper. Manag.
, vol.3
, pp. 224-250
-
-
Alves, R.1
-
31
-
-
0003681233
-
-
Ph.D. dissertation, Dept. EECS, MIT, Cambridge, MA
-
M. H. Burman, "New results in flow line analysis," Ph.D. dissertation, Dept. EECS, MIT, Cambridge, MA, 1995.
-
(1995)
New Results in Flow Line Analysis
-
-
Burman, M.H.1
-
32
-
-
70449679518
-
-
Dept. of IE, Tel Aviv Univ., Tel Aviv, Israel
-
Y. Arzi and A. Kalir, "Approximating throughput of non-homogeneous multiple-paralle machines' production lines," Dept. of IE, Tel Aviv Univ., Tel Aviv, Israel, 1996.
-
(1996)
Approximating Throughput of Non-homogeneous Multiple-paralle Machines' Production Lines
-
-
Arzi, Y.1
Kalir, A.2
-
33
-
-
0035400771
-
Modeling and analysis of an unreliable flow line composed of parallel-machine stages
-
A. Patchong and D. Willaeys, "Modeling and analysis of an unreliable flow line composed of parallel-machine stages," IIE Trans., vol. 33, pp. 559-568, 2001.
-
(2001)
IIE Trans.
, vol.33
, pp. 559-568
-
-
Patchong, A.1
Willaeys, D.2
-
34
-
-
0032652306
-
An approximation method for performance analysis of assembly/disasembly systems with parallel-machine stations
-
K.-C. Jeong and Y.-D. Kim, "An approximation method for performance analysis of assembly/disasembly systems with parallel-machine stations," IIE Trans., vol. 31, pp. 391-394, 1999.
-
(1999)
IIE Trans.
, vol.31
, pp. 391-394
-
-
Jeong, K.-C.1
Kim, Y.-D.2
-
35
-
-
0025448957
-
A survey of closed queueing networks with blocking
-
R. O. Onvural, "A survey of closed queueing networks with blocking," ACM Comp. Surveys, vol. 22, pp. 83-121, 1990.
-
(1990)
ACM Comp. Surveys
, vol.22
, pp. 83-121
-
-
Onvural, R.O.1
-
36
-
-
77957033398
-
Performance evaluation of production networks
-
S. C. Graves et al., Eds. Amsterdam, The Netherlands: Elsevier Science
-
R. Suri, J. L. Sanders, and M. Kamath et al., "Performance evaluation of production networks," in Handbooks in OR & MS, S. C. Graves et al., Eds. Amsterdam, The Netherlands: Elsevier Science, 1993, vol. 4, pp. 199-286.
-
(1993)
Handbooks in or & MS
, vol.4
, pp. 199-286
-
-
Suri, R.1
Sanders, J.L.2
Kamath, M.3
-
37
-
-
0027539390
-
On asymptotic reliable closed serial production lines
-
J.-T. Lim and S. M. Meerkov, "On asymptotic reliable closed serial production lines," Contr. Eng. Pract., vol. 1, pp. 147-152, 1993.
-
(1993)
Contr. Eng. Pract.
, vol.1
, pp. 147-152
-
-
Lim, J.-T.1
Meerkov, S.M.2
-
38
-
-
0030192549
-
Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers
-
Y. Frein, C. Commault, and Y. Dallery, "Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers," IIE Trans., vol. 28, pp. 545-554, 1996.
-
(1996)
IIE Trans.
, vol.28
, pp. 545-554
-
-
Frein, Y.1
Commault, C.2
Dallery, Y.3
-
39
-
-
1342288221
-
Analysis of loop networks by decomposition
-
Tinos Island, Greece
-
S. B. Gershwin, N. Maggio, A. Matta, T. Tolio, and L. M. Werner, "Analysis of loop networks by decomposition," in Proc. 3rd Aegean Int. Conf. Design and Analysis of Manufacturing Systems, Tinos Island, Greece, 2001, pp. 239-248.
-
(2001)
Proc. 3rd Aegean Int. Conf. Design and Analysis of Manufacturing Systems
, pp. 239-248
-
-
Gershwin, S.B.1
Maggio, N.2
Matta, A.3
Tolio, T.4
Werner, L.M.5
-
40
-
-
0030916278
-
Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method
-
S. Yerelan and B. Tan, "Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method," Math. Comp. Model., vol. 25, no. 11, pp. 109-123, 1997.
-
(1997)
Math. Comp. Model.
, vol.25
, Issue.11
, pp. 109-123
-
-
Yerelan, S.1
Tan, B.2
-
41
-
-
0023416254
-
An approximate model of multistage automatic transfer lines with possible scrapping of workpieces
-
M. A. Jafari and J. G. Shanthikumar, "An approximate model of multistage automatic transfer lines with possible scrapping of workpieces," IIE Trans., vol. 19, pp. 1157-1170, 1987.
-
(1987)
IIE Trans.
, vol.19
, pp. 1157-1170
-
-
Jafari, M.A.1
Shanthikumar, J.G.2
-
42
-
-
3042670138
-
Extending the scope of analytical methods for performance evaluation of manufacturing flow systems
-
Tinos Island, Greece, May
-
Y. Dallery, "Extending the scope of analytical methods for performance evaluation of manufacturing flow systems," in Proc. 2nd Int. Conf. Analysis and Modeling of Manufacturing Systems, Tinos Island, Greece, May 1999.
-
(1999)
Proc. 2nd Int. Conf. Analysis and Modeling of Manufacturing Systems
-
-
Dallery, Y.1
-
43
-
-
0034381835
-
Approximate analysis of unreliable transfer lines with splits in the flow of material
-
S. Helber, "Approximate analysis of unreliable transfer lines with splits in the flow of material," Ann. Oper. Res., vol. 93, pp. 217-243, 2000.
-
(2000)
Ann. Oper. Res.
, vol.93
, pp. 217-243
-
-
Helber, S.1
-
44
-
-
0024048064
-
Even-driven model of unreliable production lines with storage
-
H. D'Angelo, M. Caramanis, J. Finger, A. Mavretic, Y. Phillis, and E. Ramsden, "Even-driven model of unreliable production lines with storage," Int. J. Prod. Res., vol. 26, pp. 1173-1182, 1988.
-
(1988)
Int. J. Prod. Res.
, vol.26
, pp. 1173-1182
-
-
D'Angelo, H.1
Caramanis, M.2
Finger, J.3
Mavretic, A.4
Phillis, Y.5
Ramsden, E.6
-
46
-
-
0000285320
-
Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
-
R. R. Inman, "Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems," Prod. Oper. Manag., vol. 4, pp. 409-432, 1999.
-
(1999)
Prod. Oper. Manag.
, vol.4
, pp. 409-432
-
-
Inman, R.R.1
-
47
-
-
78549291196
-
-
General Motors Research & Development Center, Warren, MI, Tech. Rep. R&D-9600
-
J. Li, "Overlapping decomposition: A system-theoretic approach for modeling and analysis of manufacturing systems," General Motors Research & Development Center, Warren, MI, Tech. Rep. R&D-9600, 2003.
-
(2003)
Overlapping Decomposition: A System-theoretic Approach for Modeling and Analysis of Manufacturing Systems
-
-
Li, J.1
|