-
1
-
-
0017504870
-
The output of a two-stage system with unreliable machines and limited storage
-
E. Ignall and A. Silver, "The output of a two-stage system with unreliable machines and limited storage," AIIE Trans., vol. 9, pp. 183-188, 1977.
-
(1977)
AIIE Trans.
, vol.9
, pp. 183-188
-
-
Ignall, E.1
Silver, A.2
-
2
-
-
0023401973
-
The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage
-
T. Iyama and S. Ito, "The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage," Int. J. Prod. Res., vol. 25, pp. 1157-1179, 1987.
-
(1987)
Int. J. Prod. Res.
, vol.25
, pp. 1157-1179
-
-
Iyama, T.1
Ito, S.2
-
3
-
-
0000357748
-
Stochastic theory of a fluid model of producers and consumers coupled by a buffer
-
D. Mitra, "Stochastic theory of a fluid model of producers and consumers coupled by a buffer," Adv. Appl. Probab., vol. 20, pp. 646-676, 1988.
-
(1988)
Adv. Appl. Probab.
, vol.20
, pp. 646-676
-
-
Mitra, D.1
-
4
-
-
0012550155
-
Performance evaluation of series-parallel systems
-
R. Alves, "Performance evaluation of series-parallel systems," J. Manufact. Oper. Manage., vol. 3, pp. 224-250, 1990.
-
(1990)
J. Manufact. Oper. Manage.
, vol.3
, pp. 224-250
-
-
Alves, R.1
-
5
-
-
0003681233
-
-
Ph.D. dissertation, MIT, Cambridge, MA
-
M. H. Burman, "New results in flow line analysis," Ph.D. dissertation, MIT, Cambridge, MA, 1995.
-
(1995)
New Results in Flow Line Analysis
-
-
Burman, M.H.1
-
6
-
-
0035400771
-
Modeling and analysis of an unreliable flow line composed of parallel-machine stages
-
A. Patchong and D. Willaeys, "Modeling and analysis of an unreliable flow line composed of parallel-machine stages," IIE Trans., vol. 33, pp. 559-568, 2001.
-
(2001)
IIE Trans.
, vol.33
, pp. 559-568
-
-
Patchong, A.1
Willaeys, D.2
-
7
-
-
0032652306
-
An approximation method for performance analysis of assembly/disasembly systems with parallel-machine stations
-
K.-C. Jeong and Y.-D. Kim, "An approximation method for performance analysis of assembly/disasembly systems with parallel-machine stations," IIE Trans., vol. 31, pp. 391-394, 1999.
-
(1999)
IIE Trans.
, vol.31
, pp. 391-394
-
-
Jeong, K.-C.1
Kim, Y.-D.2
-
8
-
-
7244261294
-
-
Genral Motors R and D Center, Warren, MI, R and D Rep. 9384
-
J. Li, "Modeling and analysis of production systems with parallel lines," Genral Motors R&D Center, Warren, MI, R&D Rep. 9384, 2002.
-
(2002)
Modeling and Analysis of Production Systems With Parallel Lines
-
-
Li, J.1
-
9
-
-
3242682462
-
Performance analysis of production systems with rework loops
-
J. Li, "Performance analysis of production systems with rework loops," IIE Trans., vol. 36, pp. 755-765, 2004.
-
(2004)
IIE Trans.
, vol.36
, pp. 755-765
-
-
Li, J.1
-
10
-
-
3042630551
-
Throughput analysis in automotive paint shops: A case study
-
Jan
-
J. Li, "Throughput analysis in automotive paint shops: A case study," IEEE Trans. Automat. Sci. Eng., vol. 1, pp. 90-98, Jan. 2004.
-
(2004)
IEEE Trans. Automat. Sci. Eng.
, vol.1
, pp. 90-98
-
-
Li, J.1
-
11
-
-
0345854809
-
c-bottlenecks in serial production lines: Identification and application
-
S.-Y. Chiang, C.-T. Kuo, and S. M. Meerkov, "c-bottlenecks in serial production lines: Identification and application," Math. Prob. Eng., vol. 7, pp. 543-578, 2001.
-
(2001)
Math. Prob. Eng.
, vol.7
, pp. 543-578
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
12
-
-
0034291972
-
DT-bottlenecks in serial production lines: Theory and application
-
Apr
-
S.-Y. Chiang, "DT-bottlenecks in serial production lines: theory and application," IEEE Trans. Robot. Automat., vol. 16, pp. 567-580, Apr. 2000.
-
(2000)
IEEE Trans. Robot. Automat.
, vol.16
, pp. 567-580
-
-
Chiang, S.-Y.1
-
13
-
-
0029291550
-
A system-theoretic property of serial production lines: Improvability
-
D. A. Jacobs and S. M. Meerkov, "A system-theoretic property of serial production lines: Improvability," Int. J. Syst. Sci., vol. 26, pp. 95-137, 1995.
-
(1995)
Int. J. Syst. Sci.
, vol.26
, pp. 95-137
-
-
Jacobs, D.A.1
Meerkov, S.M.2
|