메뉴 건너뛰기




Volumn 40, Issue 3, 2008, Pages 162-176

Production system design for quality robustness

Author keywords

Automotive paint shops; Frst time quality; Production system design; Quality robustness; Repair and rework

Indexed keywords

ASSEMBLY; AUTOMOBILE MANUFACTURE; JUST IN TIME PRODUCTION; QUALITY CONTROL; REPAIR;

EID: 38049033423     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170601013661     Document Type: Conference Paper
Times cited : (54)

References (31)
  • 2
    • 0010775479 scopus 로고
    • Impact of quality improvement on optimal buffer design and productivity in automatic assembly systems
    • Bulgak, A. A. (1992) Impact of quality improvement on optimal buffer design and productivity in automatic assembly systems. Journal of Manufacturing Systems, 11, pp. 124-136.
    • (1992) Journal of Manufacturing Systems , vol.11 , pp. 124-136
    • Bulgak, A.A.1
  • 4
    • 0033116502 scopus 로고    scopus 로고
    • Determining a threshold control policy for an imperfect production system with rework jobs
    • Chern, C. C. and Yang, P. (1999) Determining a threshold control policy for an imperfect production system with rework jobs. Naval Research Logistics, 46, pp. 273-301.
    • (1999) Naval Research Logistics , vol.46 , pp. 273-301
    • Chern, C.C.1    Yang, P.2
  • 5
    • 0000628123 scopus 로고    scopus 로고
    • Optimization of process improvement and inspection location for serial manufacturing
    • Deliman, N. C. and Feldman, R. M. (1996) Optimization of process improvement and inspection location for serial manufacturing. International Journal of Production Research, 34, pp. 395-405.
    • (1996) International Journal of Production Research , vol.34 , pp. 395-405
    • Deliman, N.C.1    Feldman, R.M.2
  • 6
    • 29144503897 scopus 로고    scopus 로고
    • Economic optimization of off-line inspection in a process subject to failure and recovery
    • Finkelshtein, A., Herer, Y. T., Raz, T. and Ben-Gal, I. (2005) Economic optimization of off-line inspection in a process subject to failure and recovery. IIE Transactions, 37, pp. 995-1009.
    • (2005) IIE Transactions , vol.37 , pp. 995-1009
    • Finkelshtein, A.1    Herer, Y.T.2    Raz, T.3    Ben-Gal, I.4
  • 7
    • 0032162842 scopus 로고    scopus 로고
    • Performance analysis of serial production lines with quality inspection machines
    • Han, M. -S., Lim, J. -T. and Park, D. -J. (1998) Performance analysis of serial production lines with quality inspection machines. International Journal of System Science, 29, pp. 939-951.
    • (1998) International Journal of System Science , vol.29 , pp. 939-951
    • Han, M.-S.1    Lim, J.-T.2    Park, D.-J.3
  • 9
    • 0242269872 scopus 로고    scopus 로고
    • Designing production system for quality: Research opportunities from automotive industry perspective
    • Inman, R. R., Blumenfeld, D. E., Huang, N. and Li, J. (2003) Designing production system for quality: Research opportunities from automotive industry perspective. International Journal of Production Research, 41, pp. 1953-1971.
    • (2003) International Journal of Production Research , vol.41 , pp. 1953-1971
    • Inman, R.R.1    Blumenfeld, D.E.2    Huang, N.3    Li, J.4
  • 10
    • 0242265534 scopus 로고
    • Asympototically reliable serial production lines with quality control systems
    • Jacobs, D. A. and Meerkov, S. M. (1991) Asympototically reliable serial production lines with quality control systems. Computers Mathematics and Applications, 21, pp. 85-90.
    • (1991) Computers Mathematics and Applications , vol.21 , pp. 85-90
    • Jacobs, D.A.1    Meerkov, S.M.2
  • 12
    • 17444379378 scopus 로고    scopus 로고
    • Integrated quality and quantity model of a production line
    • Kim, J. and Gershwin, S. B. (2005) Integrated quality and quantity model of a production line. OR Spectrum, 27, pp. 287-314.
    • (2005) OR Spectrum , vol.27 , pp. 287-314
    • Kim, J.1    Gershwin, S.B.2
  • 13
    • 3242682462 scopus 로고    scopus 로고
    • Performance analysis of production systems with rework loops
    • Li, J. (2004) Performance analysis of production systems with rework loops. IIE Transactions, 36, pp. 755-765.
    • (2004) IIE Transactions , vol.36 , pp. 755-765
    • Li, J.1
  • 15
    • 12844287589 scopus 로고    scopus 로고
    • Overlapping decomposition: A system-theoretic method for modeling and analysis of complex manufacturing systems
    • Li, J. (2005) Overlapping decomposition: A system-theoretic method for modeling and analysis of complex manufacturing systems. IEEE Transactions on Automation Science and Engineering, 2, pp. 40-53.
    • (2005) IEEE Transactions on Automation Science and Engineering , vol.2 , pp. 40-53
    • Li, J.1
  • 18
    • 38049046579 scopus 로고    scopus 로고
    • Quality evaluation in flexible manufacturing systems: A Markovian approach
    • Li, J. and Huang, N. (2007) Quality evaluation in flexible manufacturing systems: A Markovian approach. Mathematical Problems in Engineering
    • (2007) Mathematical Problems in Engineering
    • Li, J.1    Huang, N.2
  • 19
    • 0027539390 scopus 로고
    • On asymptotic reliable closed serial production lines
    • Lim, J. -T. and Meerkov, S. M. (1993) On asymptotic reliable closed serial production lines. Control Engineering Practices, 1, pp. 147-152.
    • (1993) Control Engineering Practices , vol.1 , pp. 147-152
    • Lim, J.-T.1    Meerkov, S.M.2
  • 20
    • 0025432495 scopus 로고
    • Homogeneous, asymptotic reliable serial production lines: Theory and a case study
    • Lim, J. -T., Meerkov, S. M. and Top, F. (1990) Homogeneous, asymptotic reliable serial production lines: Theory and a case study. IEEE Transactions on Automatic Control, 35, pp. 524-534.
    • (1990) IEEE Transactions on Automatic Control , vol.35 , pp. 524-534
    • Lim, J.-T.1    Meerkov, S.M.2    Top, F.3
  • 21
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu, J. J. and Yang, P. (1996) Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research, 91, pp. 517-527.
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 22
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines to reduce work overload
    • Matanachai, S. and Yano, C. A. (2001) Balancing mixed-model assembly lines to reduce work overload. IIE Transactions, 33, pp. 29-42.
    • (2001) IIE Transactions , vol.33 , pp. 29-42
    • Matanachai, S.1    Yano, C.A.2
  • 23
    • 0001441631 scopus 로고    scopus 로고
    • Modeling reentrant manufacturing system with inspection stations
    • Narahari, Y. and Khan, L. M. (1996) Modeling reentrant manufacturing system with inspection stations. Journal of Manufacturing Systems, 15, pp. 367-378.
    • (1996) Journal of Manufacturing Systems , vol.15 , pp. 367-378
    • Narahari, Y.1    Khan, L.M.2
  • 28
    • 0023596514 scopus 로고
    • Economic measure of productivity, quality and flexibility in advanced manufacturing systems
    • Son, Y. K. and Park, C. S. (1987) Economic measure of productivity, quality and flexibility in advanced manufacturing systems. Journal of Manufacturing Systems, 6, pp. 193-207.
    • (1987) Journal of Manufacturing Systems , vol.6 , pp. 193-207
    • Son, Y.K.1    Park, C.S.2
  • 29
    • 0032203962 scopus 로고    scopus 로고
    • Analysis of production systems when run length influences product quality
    • Urban, T. L. (1998) Analysis of production systems when run length influences product quality. International Journal of Production Research, 36, pp. 3085-3094.
    • (1998) International Journal of Production Research , vol.36 , pp. 3085-3094
    • Urban, T.L.1
  • 31
    • 0030916278 scopus 로고    scopus 로고
    • Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method
    • Yerelan, S. and Tan, B. (1997) Analysis of multistation production systems with limited buffer capacity part 2: The decomposition method. Mathematics and Computer Modeling, 25, pp. 109-123.
    • (1997) Mathematics and Computer Modeling , vol.25 , pp. 109-123
    • Yerelan, S.1    Tan, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.