-
2
-
-
0027675494
-
Balancing Two-sided Assembly Lines: A Case Study
-
J.J.Bartholdi, 1993. “Balancing Two-sided Assembly Lines:A Case Study.” International Journal of Production Research 31 (10):2447–2461.10.1080/00207549308956868
-
(1993)
International Journal of Production Research
, vol.31
, Issue.10
, pp. 2447-2461
-
-
Bartholdi, J.J.1
-
3
-
-
84874540167
-
A Taxonomy of Line Balancing Problems and Their Solution Approaches
-
O.Battaïa, and A.Dolgui. 2013. “A Taxonomy of Line Balancing Problems and Their Solution Approaches.” International Journal of Production Economics 142 (2):259–277.10.1016/j.ijpe.2012.10.020
-
(2013)
International Journal of Production Economics
, vol.142
, Issue.2
, pp. 259-277
-
-
Battaïa, O.1
Dolgui, A.2
-
5
-
-
25144450992
-
A Survey on Problems and Methods in Generalized Assembly Line Balancing
-
C.Becker, and A.Scholl. 2006. “A Survey on Problems and Methods in Generalized Assembly Line Balancing.” European Journal of Operational Research 168 (3):694–715.10.1016/j.ejor.2004.07.023
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
7
-
-
84859523532
-
A Modified Particle Swarm Optimization for Disaster Relief Logistics under Uncertain Environment
-
A.Bozorgi-Amiri, M.S.Jabalameli, M.Alinaghian, and M.Heydari. 2012. “A Modified Particle Swarm Optimization for Disaster Relief Logistics under Uncertain Environment.” The International Journal of Advanced Manufacturing Technology 60 (1–4):357–371.10.1007/s00170-011-3596-8
-
(2012)
The International Journal of Advanced Manufacturing Technology
, vol.60
, Issue.1-4
, pp. 357-371
-
-
Bozorgi-Amiri, A.1
Jabalameli, M.S.2
Alinaghian, M.3
Heydari, M.4
-
8
-
-
0013054874
-
A Dynamic Programming Approach to Stochastic Assembly Line Balancing
-
R.L.Carraway, 1989. “A Dynamic Programming Approach to Stochastic Assembly Line Balancing.” Management Science 35 (4):459–471.10.1287/mnsc.35.4.459
-
(1989)
Management Science
, vol.35
, Issue.4
, pp. 459-471
-
-
Carraway, R.L.1
-
9
-
-
33748934553
-
The Stochastic U-line Balancing Problem: A Heuristic Procedure
-
W.-C.Chiang, and T.L.Urban. 2006. “The Stochastic U-line Balancing Problem:A Heuristic Procedure.” European Journal of Operational Research 175 (3):1767–1781.10.1016/j.ejor.2004.10.031
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.3
, pp. 1767-1781
-
-
Chiang, W.-C.1
Urban, T.L.2
-
10
-
-
82755197729
-
Multi-objective Two-sided Mixed-model Assembly Line Balancing Using Particle Swarm Optimization with Negative Knowledge
-
P.Chutima, and P.Chimklai. 2012. “Multi-objective Two-sided Mixed-model Assembly Line Balancing Using Particle Swarm Optimization with Negative Knowledge.” Computers & Industrial Engineering 62 (1):39–55.
-
(2012)
Computers & Industrial Engineering
, vol.62
, Issue.1
, pp. 39-55
-
-
Chutima, P.1
Chimklai, P.2
-
11
-
-
0001310038
-
The Greatest of a Finite Set of Random Variables
-
C.E.Clark, Charles E. 1961. “The Greatest of a Finite Set of Random Variables.” Operations Research 9 (2):145–162.10.1287/opre.9.2.145
-
(1961)
Operations Research
, vol.9
, Issue.2
, pp. 145-162
-
-
Clark, C.E.1
-
12
-
-
77951095039
-
Optimising and Simulating the Assembly Line Balancing Problem in a Motorcycle Manufacturing Company: A Case Study
-
P.Cortés, L.Onieva, and J.Guadix. 2010. “Optimising and Simulating the Assembly Line Balancing Problem in a Motorcycle Manufacturing Company:A Case Study.” International Journal of Production Research 48 (12):3637–3656.10.1080/00207540902926522
-
(2010)
International Journal of Production Research
, vol.48
, Issue.12
, pp. 3637-3656
-
-
Cortés, P.1
Onieva, L.2
Guadix, J.3
-
13
-
-
0032117097
-
A Survey of the Assembly Line Balancing Procedures
-
E.Erel, and S.C.Sarin. 1998. “A Survey of the Assembly Line Balancing Procedures.” Production Planning & Control 9 (5):414–434.
-
(1998)
Production Planning & Control
, vol.9
, Issue.5
, pp. 414-434
-
-
Erel, E.1
Sarin, S.C.2
-
14
-
-
43449129661
-
Line Balancing in the Real World
-
Bouras A., Gurumoorthy B., Sudarsan R., (eds), Lyon: Inderscience Enterprises
-
E.Falkenauer, 2005. Line Balancing in the Real World. In Proceedings of the International Conference on Product Lifecycle Management (PLC’05), edited by A.Bouras, B.Gurumoorthy, and R.Sudarsan, 360–370. Lyon:Inderscience Enterprises.
-
(2005)
Proceedings of the International Conference on Product Lifecycle Management (PLC’05)
, pp. 360-370
-
-
Falkenauer, E.1
-
15
-
-
77951096660
-
A Branch-and-bound Algorithm to Minimize the Line Length of a Two-sided Assembly Line
-
X.Hu, E.Wu, J.Bao, and J.Ye. 2010. “A Branch-and-bound Algorithm to Minimize the Line Length of a Two-sided Assembly Line.” European Journal of Operational Research 206 (3):703–707.
-
(2010)
European Journal of Operational Research
, vol.206
, Issue.3
, pp. 703-707
-
-
Hu, X.1
Wu, E.2
Bao, J.3
Ye, J.4
-
16
-
-
35348949412
-
A Station-oriented Enumerative Algorithm for Two-sided Assembly Line Balancing
-
X.Hu, E.Wu, and Y.Jin. 2008. “A Station-oriented Enumerative Algorithm for Two-sided Assembly Line Balancing.” European Journal of Operational Research 186 (1):435–440.10.1016/j.ejor.2007.01.022
-
(2008)
European Journal of Operational Research
, vol.186
, Issue.1
, pp. 435-440
-
-
Hu, X.1
Wu, E.2
Jin, Y.3
-
18
-
-
0033993174
-
Two-sided Assembly Line Balancing: A Genetic Algorithm Approach
-
Y.K.Kim, Y.Kim, and Y.J.Kim. 2000. “Two-sided Assembly Line Balancing:A Genetic Algorithm Approach.” Production Planning & Control 11 (1):44–53.
-
(2000)
Production Planning & Control
, vol.11
, Issue.1
, pp. 44-53
-
-
Kim, Y.K.1
Kim, Y.2
Kim, Y.J.3
-
19
-
-
53749096405
-
A Mathematical Model and a Genetic Algorithm for Two-sided Assembly Line Balancing
-
Y.K.Kim, W.S.Song, and J.H.Kim. 2009. “A Mathematical Model and a Genetic Algorithm for Two-sided Assembly Line Balancing.” Computers & Operations Research 36 (3):853–865.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.3
, pp. 853-865
-
-
Kim, Y.K.1
Song, W.S.2
Kim, J.H.3
-
20
-
-
3042688706
-
Balancing Assembly Lines: An Industrial Case Study
-
S.D.Lapierre, and A.B.Ruiz. 2004. “Balancing Assembly Lines:An Industrial Case Study.” Journal of the Operational Research Society 55 (6):589–597.10.1057/palgrave.jors.2601708
-
(2004)
Journal of the Operational Research Society
, vol.55
, Issue.6
, pp. 589-597
-
-
Lapierre, S.D.1
Ruiz, A.B.2
-
22
-
-
0035399914
-
Two-sided Assembly Line Balancing to Maximize Work Relatedness and Slackness
-
T.O.Lee, Y.Kim, and Y.K.Kim. 2001. “Two-sided Assembly Line Balancing to Maximize Work Relatedness and Slackness.” Computers & Industrial Engineering 40 (3):273–292.
-
(2001)
Computers & Industrial Engineering
, vol.40
, Issue.3
, pp. 273-292
-
-
Lee, T.O.1
Kim, Y.2
Kim, Y.K.3
-
23
-
-
84873690552
-
Particle Swarm Optimization for the Vehicle Routing Problem with Stochastic Demands
-
Y.Marinakis, G.-R.Iordanidou, and M.Marinaki. 2013. “Particle Swarm Optimization for the Vehicle Routing Problem with Stochastic Demands.” Applied Soft Computing 13 (4):1693–1704.10.1016/j.asoc.2013.01.007
-
(2013)
Applied Soft Computing
, vol.13
, Issue.4
, pp. 1693-1704
-
-
Marinakis, Y.1
Iordanidou, G.-R.2
Marinaki, M.3
-
24
-
-
0002569892
-
A Heuristic Method of Assembly Line for Assumptions of Constant or Variable Work Element Times
-
C.L.Moodie, and H.H.Young. 1965. “A Heuristic Method of Assembly Line for Assumptions of Constant or Variable Work Element Times.” Journal of Industrial Engineering 16 (1):23–29.
-
(1965)
Journal of Industrial Engineering
, vol.16
, Issue.1
, pp. 23-29
-
-
Moodie, C.L.1
Young, H.H.2
-
25
-
-
79955580803
-
Bee Colony Intelligence in Zone Constrained Two-sided Assembly Line Balancing Problem
-
L.Özbakır, and P.Tapkan. 2011. “Bee Colony Intelligence in Zone Constrained Two-sided Assembly Line Balancing Problem.” Expert Systems with Applications 38 (9):11947–11957.10.1016/j.eswa.2011.03.089
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.9
, pp. 11947-11957
-
-
Özbakır, L.1
Tapkan, P.2
-
26
-
-
75849138540
-
Balancing Stochastic Two-sided Assembly Lines: A Chance-constrained, Piecewise-linear, Mixed Integer Program and a Simulated Annealing Algorithm
-
U.Özcan, 2010. “Balancing Stochastic Two-sided Assembly Lines:A Chance-constrained, Piecewise-linear, Mixed Integer Program and a Simulated Annealing Algorithm.” European Journal of Operational Research 205 (1):81–97.
-
(2010)
European Journal of Operational Research
, vol.205
, Issue.1
, pp. 81-97
-
-
Özcan, U.1
-
29
-
-
67349117327
-
Balancing of Mixed-model Two-sided Assembly Lines
-
U.Özcan, and B.Toklu. 2009b. “Balancing of Mixed-model Two-sided Assembly Lines.” Computers & Industrial Engineering 57 (1):217–227.
-
(2009)
Computers & Industrial Engineering
, vol.57
, Issue.1
, pp. 217-227
-
-
Özcan, U.1
Toklu, B.2
-
30
-
-
56549085980
-
Multiple-criteria Decision-making in Two-sided Assembly Line Balancing: A Goal Programming and a Fuzzy Goal Programming Models
-
U.Özcan, and B.Toklu. 2009c. “Multiple-criteria Decision-making in Two-sided Assembly Line Balancing:A Goal Programming and a Fuzzy Goal Programming Models.” Computers & Operations Research 36 (6):1955–1965.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.6
, pp. 1955-1965
-
-
Özcan, U.1
Toklu, B.2
-
31
-
-
81555198352
-
Solving the Stochastic Dynamic Lot-sizing Problem through Nature-inspired Heuristics
-
G.S.Piperagkas, I.Konstantaras, K.Skouri, and K.E.Parsopoulos. 2012. “Solving the Stochastic Dynamic Lot-sizing Problem through Nature-inspired Heuristics.” Computers & Operations Research 39 (7):1555–1565.
-
(2012)
Computers & Operations Research
, vol.39
, Issue.7
, pp. 1555-1565
-
-
Piperagkas, G.S.1
Konstantaras, I.2
Skouri, K.3
Parsopoulos, K.E.4
-
33
-
-
0031700696
-
A Modified Particle Swarm Optimizer
-
Anchorage, AK, USA:
-
Y.Shi, and R.C.Eberhart. 1998. “A Modified Particle Swarm Optimizer.” In Proceedings of the IEEE Congress on Evolutionary Computation, 69–173, Anchorage, AK, USA.
-
(1998)
Proceedings of the IEEE Congress on Evolutionary Computation
, pp. 69-173
-
-
Shi, Y.1
Eberhart, R.C.2
-
34
-
-
0022698734
-
A Cost-based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages
-
F.N.Silverman, and J.C.Carter. 1986. “A Cost-based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages.” Management Science 32 (4):455–463.10.1287/mnsc.32.4.455
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
35
-
-
59349112769
-
2-Antbal: An Ant Colony Optimization Algorithm for Balancing Two-sided Assembly Lines
-
A.S.Simaria, and P.M.Vilarinho. 2009. “2-Antbal:An Ant Colony Optimization Algorithm for Balancing Two-sided Assembly Lines.” Computers & Industrial Engineering 56 (2):489–506.
-
(2009)
Computers & Industrial Engineering
, vol.56
, Issue.2
, pp. 489-506
-
-
Simaria, A.S.1
Vilarinho, P.M.2
-
37
-
-
84864403256
-
Bees Algorithm for Constrained Fuzzy Multi-objective Two-sided Assembly Line Balancing Problem
-
P.Tapkan, L.Özbakır, and A.Baykasoğlu. 2012. “Bees Algorithm for Constrained Fuzzy Multi-objective Two-sided Assembly Line Balancing Problem.” Optimization Letters 6 (6):1039–1049.10.1007/s11590-011-0344-9
-
(2012)
Optimization Letters
, vol.6
, Issue.6
, pp. 1039-1049
-
-
Tapkan, P.1
Özbakır, L.2
Baykasoğlu, A.3
-
38
-
-
25144472327
-
An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task times
-
T.L.Urban, and W.-C.Chiang. 2006. “An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task times.” European Journal of Operational Research 168 (3):771–782.10.1016/j.ejor.2004.07.027
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 771-782
-
-
Urban, T.L.1
Chiang, W.-C.2
-
39
-
-
0023108688
-
On the Normality of Operation times in Small-lot Assembly Systems: A Technical Note
-
W.E.Wilhelm, 1987. “On the Normality of Operation times in Small-lot Assembly Systems:A Technical Note.” International Journal of Production Research 25 (1):145–149.10.1080/00207548708919828
-
(1987)
International Journal of Production Research
, vol.25
, Issue.1
, pp. 145-149
-
-
Wilhelm, W.E.1
-
40
-
-
55649112933
-
A Branch-and-bound Algorithm for Two-sided Assembly Line Balancing
-
E.Wu, Y.Jin, J.Bao, and X.Hu. 2008. “A Branch-and-bound Algorithm for Two-sided Assembly Line Balancing.” The International Journal of Advanced Manufacturing Technology 39 (9–10):1009–1015.10.1007/s00170-007-1286-3
-
(2008)
The International Journal of Advanced Manufacturing Technology
, vol.39
, Issue.9-10
, pp. 1009-1015
-
-
Wu, E.1
Jin, Y.2
Bao, J.3
Hu, X.4
-
41
-
-
84855930280
-
A Two-stage Hybrid Particle Swarm Optimization Algorithm for the Stochastic Job Shop Scheduling Problem
-
R.Zhang, S.Song, and C.Wu. 2012. “A Two-stage Hybrid Particle Swarm Optimization Algorithm for the Stochastic Job Shop Scheduling Problem.” Knowledge-Based Systems 27:393–406.10.1016/j.knosys.2011.11.018
-
(2012)
Knowledge-Based Systems
, vol.27
, pp. 393-406
-
-
Zhang, R.1
Song, S.2
Wu, C.3
|