메뉴 건너뛰기




Volumn 54, Issue 20, 2016, Pages 6232-6250

Balancing stochastic two-sided assembly lines

Author keywords

manufacturing; particle swarm optimization; stochastic task time; two sided assembly line

Indexed keywords

ASSEMBLY; ASSEMBLY MACHINES; MANUFACTURE; NORMAL DISTRIBUTION; PARTICLE SWARM OPTIMIZATION (PSO);

EID: 84927536868     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2015.1029084     Document Type: Article
Times cited : (38)

References (41)
  • 2
    • 0027675494 scopus 로고
    • Balancing Two-sided Assembly Lines: A Case Study
    • J.J.Bartholdi, 1993. “Balancing Two-sided Assembly Lines:A Case Study.” International Journal of Production Research 31 (10):2447–2461.10.1080/00207549308956868
    • (1993) International Journal of Production Research , vol.31 , Issue.10 , pp. 2447-2461
    • Bartholdi, J.J.1
  • 3
    • 84874540167 scopus 로고    scopus 로고
    • A Taxonomy of Line Balancing Problems and Their Solution Approaches
    • O.Battaïa, and A.Dolgui. 2013. “A Taxonomy of Line Balancing Problems and Their Solution Approaches.” International Journal of Production Economics 142 (2):259–277.10.1016/j.ijpe.2012.10.020
    • (2013) International Journal of Production Economics , vol.142 , Issue.2 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 4
  • 5
    • 25144450992 scopus 로고    scopus 로고
    • A Survey on Problems and Methods in Generalized Assembly Line Balancing
    • C.Becker, and A.Scholl. 2006. “A Survey on Problems and Methods in Generalized Assembly Line Balancing.” European Journal of Operational Research 168 (3):694–715.10.1016/j.ejor.2004.07.023
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 6
    • 34249995941 scopus 로고    scopus 로고
    • A Classification of Assembly Line Balancing Problems
    • N.Boysen, M.Fliedner, and A.Scholl. 2007. “A Classification of Assembly Line Balancing Problems.” European Journal of Operational Research 183 (2):674–693.10.1016/j.ejor.2006.10.010
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 674-693
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 8
    • 0013054874 scopus 로고
    • A Dynamic Programming Approach to Stochastic Assembly Line Balancing
    • R.L.Carraway, 1989. “A Dynamic Programming Approach to Stochastic Assembly Line Balancing.” Management Science 35 (4):459–471.10.1287/mnsc.35.4.459
    • (1989) Management Science , vol.35 , Issue.4 , pp. 459-471
    • Carraway, R.L.1
  • 9
    • 33748934553 scopus 로고    scopus 로고
    • The Stochastic U-line Balancing Problem: A Heuristic Procedure
    • W.-C.Chiang, and T.L.Urban. 2006. “The Stochastic U-line Balancing Problem:A Heuristic Procedure.” European Journal of Operational Research 175 (3):1767–1781.10.1016/j.ejor.2004.10.031
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.-C.1    Urban, T.L.2
  • 10
    • 82755197729 scopus 로고    scopus 로고
    • Multi-objective Two-sided Mixed-model Assembly Line Balancing Using Particle Swarm Optimization with Negative Knowledge
    • P.Chutima, and P.Chimklai. 2012. “Multi-objective Two-sided Mixed-model Assembly Line Balancing Using Particle Swarm Optimization with Negative Knowledge.” Computers & Industrial Engineering 62 (1):39–55.
    • (2012) Computers & Industrial Engineering , vol.62 , Issue.1 , pp. 39-55
    • Chutima, P.1    Chimklai, P.2
  • 11
    • 0001310038 scopus 로고
    • The Greatest of a Finite Set of Random Variables
    • C.E.Clark, Charles E. 1961. “The Greatest of a Finite Set of Random Variables.” Operations Research 9 (2):145–162.10.1287/opre.9.2.145
    • (1961) Operations Research , vol.9 , Issue.2 , pp. 145-162
    • Clark, C.E.1
  • 12
    • 77951095039 scopus 로고    scopus 로고
    • Optimising and Simulating the Assembly Line Balancing Problem in a Motorcycle Manufacturing Company: A Case Study
    • P.Cortés, L.Onieva, and J.Guadix. 2010. “Optimising and Simulating the Assembly Line Balancing Problem in a Motorcycle Manufacturing Company:A Case Study.” International Journal of Production Research 48 (12):3637–3656.10.1080/00207540902926522
    • (2010) International Journal of Production Research , vol.48 , Issue.12 , pp. 3637-3656
    • Cortés, P.1    Onieva, L.2    Guadix, J.3
  • 13
    • 0032117097 scopus 로고    scopus 로고
    • A Survey of the Assembly Line Balancing Procedures
    • E.Erel, and S.C.Sarin. 1998. “A Survey of the Assembly Line Balancing Procedures.” Production Planning & Control 9 (5):414–434.
    • (1998) Production Planning & Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 15
    • 77951096660 scopus 로고    scopus 로고
    • A Branch-and-bound Algorithm to Minimize the Line Length of a Two-sided Assembly Line
    • X.Hu, E.Wu, J.Bao, and J.Ye. 2010. “A Branch-and-bound Algorithm to Minimize the Line Length of a Two-sided Assembly Line.” European Journal of Operational Research 206 (3):703–707.
    • (2010) European Journal of Operational Research , vol.206 , Issue.3 , pp. 703-707
    • Hu, X.1    Wu, E.2    Bao, J.3    Ye, J.4
  • 16
    • 35348949412 scopus 로고    scopus 로고
    • A Station-oriented Enumerative Algorithm for Two-sided Assembly Line Balancing
    • X.Hu, E.Wu, and Y.Jin. 2008. “A Station-oriented Enumerative Algorithm for Two-sided Assembly Line Balancing.” European Journal of Operational Research 186 (1):435–440.10.1016/j.ejor.2007.01.022
    • (2008) European Journal of Operational Research , vol.186 , Issue.1 , pp. 435-440
    • Hu, X.1    Wu, E.2    Jin, Y.3
  • 18
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided Assembly Line Balancing: A Genetic Algorithm Approach
    • Y.K.Kim, Y.Kim, and Y.J.Kim. 2000. “Two-sided Assembly Line Balancing:A Genetic Algorithm Approach.” Production Planning & Control 11 (1):44–53.
    • (2000) Production Planning & Control , vol.11 , Issue.1 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.2    Kim, Y.J.3
  • 19
    • 53749096405 scopus 로고    scopus 로고
    • A Mathematical Model and a Genetic Algorithm for Two-sided Assembly Line Balancing
    • Y.K.Kim, W.S.Song, and J.H.Kim. 2009. “A Mathematical Model and a Genetic Algorithm for Two-sided Assembly Line Balancing.” Computers & Operations Research 36 (3):853–865.
    • (2009) Computers & Operations Research , vol.36 , Issue.3 , pp. 853-865
    • Kim, Y.K.1    Song, W.S.2    Kim, J.H.3
  • 20
    • 3042688706 scopus 로고    scopus 로고
    • Balancing Assembly Lines: An Industrial Case Study
    • S.D.Lapierre, and A.B.Ruiz. 2004. “Balancing Assembly Lines:An Industrial Case Study.” Journal of the Operational Research Society 55 (6):589–597.10.1057/palgrave.jors.2601708
    • (2004) Journal of the Operational Research Society , vol.55 , Issue.6 , pp. 589-597
    • Lapierre, S.D.1    Ruiz, A.B.2
  • 22
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided Assembly Line Balancing to Maximize Work Relatedness and Slackness
    • T.O.Lee, Y.Kim, and Y.K.Kim. 2001. “Two-sided Assembly Line Balancing to Maximize Work Relatedness and Slackness.” Computers & Industrial Engineering 40 (3):273–292.
    • (2001) Computers & Industrial Engineering , vol.40 , Issue.3 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 23
    • 84873690552 scopus 로고    scopus 로고
    • Particle Swarm Optimization for the Vehicle Routing Problem with Stochastic Demands
    • Y.Marinakis, G.-R.Iordanidou, and M.Marinaki. 2013. “Particle Swarm Optimization for the Vehicle Routing Problem with Stochastic Demands.” Applied Soft Computing 13 (4):1693–1704.10.1016/j.asoc.2013.01.007
    • (2013) Applied Soft Computing , vol.13 , Issue.4 , pp. 1693-1704
    • Marinakis, Y.1    Iordanidou, G.-R.2    Marinaki, M.3
  • 24
    • 0002569892 scopus 로고
    • A Heuristic Method of Assembly Line for Assumptions of Constant or Variable Work Element Times
    • C.L.Moodie, and H.H.Young. 1965. “A Heuristic Method of Assembly Line for Assumptions of Constant or Variable Work Element Times.” Journal of Industrial Engineering 16 (1):23–29.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.1 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 25
    • 79955580803 scopus 로고    scopus 로고
    • Bee Colony Intelligence in Zone Constrained Two-sided Assembly Line Balancing Problem
    • L.Özbakır, and P.Tapkan. 2011. “Bee Colony Intelligence in Zone Constrained Two-sided Assembly Line Balancing Problem.” Expert Systems with Applications 38 (9):11947–11957.10.1016/j.eswa.2011.03.089
    • (2011) Expert Systems with Applications , vol.38 , Issue.9 , pp. 11947-11957
    • Özbakır, L.1    Tapkan, P.2
  • 26
    • 75849138540 scopus 로고    scopus 로고
    • Balancing Stochastic Two-sided Assembly Lines: A Chance-constrained, Piecewise-linear, Mixed Integer Program and a Simulated Annealing Algorithm
    • U.Özcan, 2010. “Balancing Stochastic Two-sided Assembly Lines:A Chance-constrained, Piecewise-linear, Mixed Integer Program and a Simulated Annealing Algorithm.” European Journal of Operational Research 205 (1):81–97.
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 81-97
    • Özcan, U.1
  • 29
    • 67349117327 scopus 로고    scopus 로고
    • Balancing of Mixed-model Two-sided Assembly Lines
    • U.Özcan, and B.Toklu. 2009b. “Balancing of Mixed-model Two-sided Assembly Lines.” Computers & Industrial Engineering 57 (1):217–227.
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.1 , pp. 217-227
    • Özcan, U.1    Toklu, B.2
  • 30
    • 56549085980 scopus 로고    scopus 로고
    • Multiple-criteria Decision-making in Two-sided Assembly Line Balancing: A Goal Programming and a Fuzzy Goal Programming Models
    • U.Özcan, and B.Toklu. 2009c. “Multiple-criteria Decision-making in Two-sided Assembly Line Balancing:A Goal Programming and a Fuzzy Goal Programming Models.” Computers & Operations Research 36 (6):1955–1965.
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 1955-1965
    • Özcan, U.1    Toklu, B.2
  • 34
    • 0022698734 scopus 로고
    • A Cost-based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages
    • F.N.Silverman, and J.C.Carter. 1986. “A Cost-based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages.” Management Science 32 (4):455–463.10.1287/mnsc.32.4.455
    • (1986) Management Science , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 35
    • 59349112769 scopus 로고    scopus 로고
    • 2-Antbal: An Ant Colony Optimization Algorithm for Balancing Two-sided Assembly Lines
    • A.S.Simaria, and P.M.Vilarinho. 2009. “2-Antbal:An Ant Colony Optimization Algorithm for Balancing Two-sided Assembly Lines.” Computers & Industrial Engineering 56 (2):489–506.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.2 , pp. 489-506
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 37
    • 84864403256 scopus 로고    scopus 로고
    • Bees Algorithm for Constrained Fuzzy Multi-objective Two-sided Assembly Line Balancing Problem
    • P.Tapkan, L.Özbakır, and A.Baykasoğlu. 2012. “Bees Algorithm for Constrained Fuzzy Multi-objective Two-sided Assembly Line Balancing Problem.” Optimization Letters 6 (6):1039–1049.10.1007/s11590-011-0344-9
    • (2012) Optimization Letters , vol.6 , Issue.6 , pp. 1039-1049
    • Tapkan, P.1    Özbakır, L.2    Baykasoğlu, A.3
  • 38
    • 25144472327 scopus 로고    scopus 로고
    • An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task times
    • T.L.Urban, and W.-C.Chiang. 2006. “An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task times.” European Journal of Operational Research 168 (3):771–782.10.1016/j.ejor.2004.07.027
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 771-782
    • Urban, T.L.1    Chiang, W.-C.2
  • 39
    • 0023108688 scopus 로고
    • On the Normality of Operation times in Small-lot Assembly Systems: A Technical Note
    • W.E.Wilhelm, 1987. “On the Normality of Operation times in Small-lot Assembly Systems:A Technical Note.” International Journal of Production Research 25 (1):145–149.10.1080/00207548708919828
    • (1987) International Journal of Production Research , vol.25 , Issue.1 , pp. 145-149
    • Wilhelm, W.E.1
  • 41
    • 84855930280 scopus 로고    scopus 로고
    • A Two-stage Hybrid Particle Swarm Optimization Algorithm for the Stochastic Job Shop Scheduling Problem
    • R.Zhang, S.Song, and C.Wu. 2012. “A Two-stage Hybrid Particle Swarm Optimization Algorithm for the Stochastic Job Shop Scheduling Problem.” Knowledge-Based Systems 27:393–406.10.1016/j.knosys.2011.11.018
    • (2012) Knowledge-Based Systems , vol.27 , pp. 393-406
    • Zhang, R.1    Song, S.2    Wu, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.