-
1
-
-
84883852117
-
Managing complexity in supply chains: A discussion of current approaches on the example of the semiconductor industry
-
J. Aelker, T. Bauernhansl, and H. Ehm. Managing complexity in supply chains: A discussion of current approaches on the example of the semiconductor industry. Procedia CIRP, 7:79-84, 2013.
-
(2013)
Procedia CIRP
, vol.7
, pp. 79-84
-
-
Aelker, J.1
Bauernhansl, T.2
Ehm, H.3
-
2
-
-
85016207912
-
-
SEMI - Semiconductor Equipment and Materials International
-
Apek Mulay. The macroeconomics of 450mm wafers. SEMI - Semiconductor Equipment and Materials International, 2014.
-
(2014)
The Macroeconomics of 450mm Wafers
-
-
Mulay, A.1
-
6
-
-
17444371106
-
Learning distributed reactive strategies by genetic programming for the general job shop problem
-
IEEE Press
-
L. Atlan, J. Bonnet, and M. Naillon. Learning distributed reactive strategies by genetic programming for the general job shop problem. Proceedings of the 7th annual Florida Artificial Intelligence Research Symposium, Pensacola, Florida, USA. IEEE Press, 1994.
-
(1994)
Proceedings of the 7th Annual Florida Artificial Intelligence Research Symposium, Pensacola, Florida, USA
-
-
Atlan, L.1
Bonnet, J.2
Naillon, M.3
-
7
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
H. Aytug, M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research, 161(1):86-110, 2005.
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.1
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
8
-
-
0031207044
-
A fuzzy approach for performance modeling in a batch plant: Application to semiconductor manufacturing
-
C. Azzaro-Pantel, P. Floquet, L. Pibouleau, and S. Domenech. A fuzzy approach for performance modeling in a batch plant: Application to semiconductor manufacturing. IEEE Transactions on Fuzzy Systems, 5(3):338-357, 1997.
-
(1997)
IEEE Transactions on Fuzzy Systems
, vol.5
, Issue.3
, pp. 338-357
-
-
Azzaro-Pantel, C.1
Floquet, P.2
Pibouleau, L.3
Domenech, S.4
-
10
-
-
84931057226
-
Hyper-heuristic evolution of dispatching rules: A comparison of rule representations
-
J. Branke, T. Hildebrandt, and B. Scholz-Reiter. Hyper-heuristic evolution of dispatching rules: A comparison of rule representations. Evolutionary computation, 23(2):249-277, 2015.
-
(2015)
Evolutionary Computation
, vol.23
, Issue.2
, pp. 249-277
-
-
Branke, J.1
Hildebrandt, T.2
Scholz-Reiter, B.3
-
11
-
-
84962109552
-
Automated design of production scheduling heuristics: A review
-
J. Branke, S. Nguyen, C. W. Pickardt, and M. Zhang. Automated design of production scheduling heuristics: A review. IEEE Transactions on Evolutionary Computation, 20(1):110-124, 2016.
-
(2016)
IEEE Transactions on Evolutionary Computation
, vol.20
, Issue.1
, pp. 110-124
-
-
Branke, J.1
Nguyen, S.2
Pickardt, C.W.3
Zhang, M.4
-
12
-
-
85026684694
-
-
GOR-publications. Springer-Verlag Berlin Heidelberg, Heidelberg and New York, 2. ed. edition
-
P. Brucker and S. Knust. Complex scheduling. GOR-publications. Springer-Verlag Berlin Heidelberg, Heidelberg and New York, 2. ed. edition, 2012.
-
(2012)
Complex Scheduling
-
-
Brucker, P.1
Knust, S.2
-
13
-
-
78149247678
-
A classification of hyper-heuristic approaches
-
M. Gendreau and J.-Y. Potvin, editors, Springer US, Boston, MA
-
E. K. Burke, M. Hyde, G. Kendall, G. Ochoa, E. Özcan, and J. R. Woodward. A classification of hyper-heuristic approaches. In M. Gendreau and J.-Y. Potvin, editors, Handbook of Metaheuristics, pages 449-468. Springer US, Boston, MA, 2010.
-
(2010)
Handbook of Metaheuristics
, pp. 449-468
-
-
Burke, E.K.1
Hyde, M.2
Kendall, G.3
Ochoa, G.4
Özcan, E.5
Woodward, J.R.6
-
14
-
-
84861234351
-
Single-machine scheduling with advanced process control constraints
-
Y. Cai, E. Kutanoglu, J. Hasenbein, and J. Qin. Single-machine scheduling with advanced process control constraints. Journal of Scheduling, 15(2):165-179, 2012.
-
(2012)
Journal of Scheduling
, vol.15
, Issue.2
, pp. 165-179
-
-
Cai, Y.1
Kutanoglu, E.2
Hasenbein, J.3
Qin, J.4
-
16
-
-
68949201653
-
Computational intelligence in flow shop and job shop scheduling
-
Springer, Berlin
-
U. K. Chakraborty. Computational intelligence in flow shop and job shop scheduling, volume v. 230 of Studies in computational intelligence, 1860-949X. Springer, Berlin, 2009.
-
(2009)
Studies in Computational Intelligence, 1860-949X
, vol.230
-
-
Chakraborty, U.K.1
-
21
-
-
85016215213
-
A neural network approach to dynamic job shop scheduling
-
Springer
-
T. Eguchi, F. Oba, and T. Hirai. A neural network approach to dynamic job shop scheduling. In Global Production Management, pages 152-159. Springer, 1999.
-
(1999)
Global Production Management
, pp. 152-159
-
-
Eguchi, T.1
Oba, F.2
Hirai, T.3
-
22
-
-
0034326224
-
Sequencing jobs on a single machine: A neural network approach
-
A. El-Bouri, S. Balakrishnan, and N. Popplewell. Sequencing jobs on a single machine: A neural network approach. European Journal of Operational Research, 126(3):474-490, 2000.
-
(2000)
European Journal of Operational Research
, vol.126
, Issue.3
, pp. 474-490
-
-
El-Bouri, A.1
Balakrishnan, S.2
Popplewell, N.3
-
23
-
-
85016184560
-
-
FAST Technologies. Smart manufacturing. https://fasttechnologies.com/, 2016.
-
(2016)
Smart Manufacturing
-
-
-
25
-
-
84964005592
-
Modeling and integration of planning, scheduling, and equipment configuration in semiconductor manufacturing part i. Review of sucesses and opportunities
-
K. Fordyce, R. J. Milne, C.-T. Wang, and H. Zisgen. Modeling and integration of planning, scheduling, and equipment configuration in semiconductor manufacturing part i. review of sucesses and opportunities. International Journal of Industrial Engineering: Theory, Applications and Practice, 22(5), 2015.
-
(2015)
International Journal of Industrial Engineering: Theory, Applications and Practice
, vol.22
, Issue.5
-
-
Fordyce, K.1
Milne, R.J.2
Wang, C.-T.3
Zisgen, H.4
-
26
-
-
0026866908
-
Real-time control of multiproduct bulk-service semiconductor manufacturing processes
-
J. W. Fowler, D. T. Phillips, and G. L. Hogg. Real-time control of multiproduct bulk-service semiconductor manufacturing processes. Semiconductor Manufacturing, IEEE Transactions on, 5(2):158-163, 1992.
-
(1992)
Semiconductor Manufacturing, IEEE Transactions on
, vol.5
, Issue.2
, pp. 158-163
-
-
Fowler, J.W.1
Phillips, D.T.2
Hogg, G.L.3
-
27
-
-
84928584798
-
Stochastic optimization of product-machine qualification in a semiconductor back-end facility
-
M. Fu, R. Askin, J. Fowler, and M. Zhang. Stochastic optimization of product-machine qualification in a semiconductor back-end facility. IIE Transactions, 47(7):739-750, 2014.
-
(2014)
IIE Transactions
, vol.47
, Issue.7
, pp. 739-750
-
-
Fu, M.1
Askin, R.2
Fowler, J.3
Zhang, M.4
-
28
-
-
33847042377
-
Analysis of a borderless fab using interoperating autosched ap models
-
B. P. Gan, L. F. Liow, A. K. Gupta, P. Lendermann, S. J. Turner, and X. Wang. Analysis of a borderless fab using interoperating autosched ap models. International Journal of Production Research, 45(3):675-697, 2007.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.3
, pp. 675-697
-
-
Gan, B.P.1
Liow, L.F.2
Gupta, A.K.3
Lendermann, P.4
Turner, S.J.5
Wang, X.6
-
29
-
-
0016952078
-
The complexity of flowshop and jobshop scheduling
-
M. R. Garey, D. S. Johnson, and R. Sethi. The complexity of flowshop and jobshop scheduling. Mathematics of operations research, 1(2):117-129, 1976.
-
(1976)
Mathematics of Operations Research
, vol.1
, Issue.2
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
31
-
-
49249101700
-
Operations management in automated semiconductor manufacturing with integrated targeting, near real-time scheduling, and dispatching
-
N. Govind, E. W. Bullock, L. He, B. Iyer, M. Krishna, and C. S. Lockwood. Operations management in automated semiconductor manufacturing with integrated targeting, near real-time scheduling, and dispatching. Semiconductor Manufacturing, IEEE Transactions on, 21(3):363-370, 2008.
-
(2008)
Semiconductor Manufacturing, IEEE Transactions on
, vol.21
, Issue.3
, pp. 363-370
-
-
Govind, N.1
Bullock, E.W.2
He, L.3
Iyer, B.4
Krishna, M.5
Lockwood, C.S.6
-
32
-
-
31644451948
-
Job shop scheduling techniques in semiconductor manufacturing: The international journal of advanced manufacturing technology
-
A. K. Gupta and A. I. Sivakumar. Job shop scheduling techniques in semiconductor manufacturing: The international journal of advanced manufacturing technology. Int J Adv Manuf Technol, 27(11-12):1163-1169, 2006.
-
(2006)
Int J Adv Manuf Technol
, vol.27
, Issue.11-12
, pp. 1163-1169
-
-
Gupta, A.K.1
Sivakumar, A.I.2
-
34
-
-
84938798587
-
A practical two-phase approach to scheduling of photolithography production
-
A. M. Ham and M. Cho. A practical two-phase approach to scheduling of photolithography production. IEEE Transactions on Semiconductor Manufacturing, 28(3):367-373, 2015.
-
(2015)
IEEE Transactions on Semiconductor Manufacturing
, vol.28
, Issue.3
, pp. 367-373
-
-
Ham, A.M.1
Cho, M.2
-
35
-
-
50849109484
-
Scheduling of wet etch and furnace operations with next arrival control heuristic: The international journal of advanced manufacturing technology
-
M. Ham and J. Fowler. Scheduling of wet etch and furnace operations with next arrival control heuristic: The international journal of advanced manufacturing technology. Int J Adv Manuf Technol, 38(9-10):1006-1017, 2008.
-
(2008)
Int J Adv Manuf Technol
, vol.38
, Issue.9-10
, pp. 1006-1017
-
-
Ham, M.1
Fowler, J.2
-
43
-
-
84867870798
-
Supervised learning linear priority dispatch rules for job-shop scheduling
-
C. A. C. Coello, editor, Springer Berlin Heidelberg, Berlin, Heidelberg
-
H. Ingimundardottir and T. P. Runarsson. Supervised learning linear priority dispatch rules for job-shop scheduling. In C. A. C. Coello, editor, Learning and Intelligent Optimization: 5th International Conference, LION 5, Rome, Italy, January 17-21, 2011. Selected Papers, pages 263-277. Springer Berlin Heidelberg, Berlin, Heidelberg, 2011.
-
(2011)
Learning and Intelligent Optimization: 5th International Conference, LION 5, Rome, Italy, January 17-21, 2011. Selected Papers
, pp. 263-277
-
-
Ingimundardottir, H.1
Runarsson, T.P.2
-
46
-
-
72049118439
-
A column generation heuristic for complex job shop multiple orders per job scheduling
-
J. Jampani and S. J. Mason. A column generation heuristic for complex job shop multiple orders per job scheduling. Computers & Industrial Engineering, 58(1):108-118, 2010.
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.1
, pp. 108-118
-
-
Jampani, J.1
Mason, S.J.2
-
47
-
-
84946606270
-
An aco algorithm for makespan minimization in parallel batch machines with non-identical job sizes and incompatible job families
-
Z.-h. Jia, C. Wang, and J. Y.-T. Leung. An aco algorithm for makespan minimization in parallel batch machines with non-identical job sizes and incompatible job families. Applied Soft Computing, 38:395-404, 2016.
-
(2016)
Applied Soft Computing
, vol.38
, pp. 395-404
-
-
Jia, Z.-H.1
Wang, C.2
Leung, J.Y.-T.3
-
49
-
-
42449153783
-
Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
-
J. Jungwattanakit, M. Reodecha, P. Chaovalitwongse, and F. Werner. Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. The International Journal of Advanced Manufacturing Technology, 37(3-4):354-370, 2008.
-
(2008)
The International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.3-4
, pp. 354-370
-
-
Jungwattanakit, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
51
-
-
84914122490
-
Die horizontale integration der wertschöpfungskette in der halbleiterindustrie - Chancen und herausforderungen
-
Thomas Bauernhansl, Michael ten Hompel, Birgit Vogel-Heuser, editor, Springer Fachmedien Wiesbaden
-
T. Kaufmann and L. Forstner. Die horizontale integration der wertschöpfungskette in der halbleiterindustrie - chancen und herausforderungen. In Thomas Bauernhansl, Michael ten Hompel, Birgit Vogel-Heuser, editor, Industrie 4.0 in Produktion, Automatisierung und Logistik. Springer Fachmedien Wiesbaden, 2014.
-
(2014)
Industrie 4.0 in Produktion, Automatisierung und Logistik
-
-
Kaufmann, T.1
Forstner, L.2
-
55
-
-
79951618940
-
A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing
-
A. Klemmt, J. Lange, G. Weigert, F. Lehmann, and J. Seyfert, editors. A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. Winter Simulation Conference, 2010.
-
(2010)
Winter Simulation Conference
-
-
Klemmt, A.1
Lange, J.2
Weigert, G.3
Lehmann, F.4
Seyfert, J.5
-
57
-
-
84964335831
-
Mixed integer programming models for job shop scheduling: A computational analysis
-
W.-Y. Ku and J. C. Beck. Mixed integer programming models for job shop scheduling: A computational analysis. Computers & Operations Research, 73:165-173, 2016.
-
(2016)
Computers & Operations Research
, vol.73
, pp. 165-173
-
-
Ku, W.-Y.1
Beck, J.C.2
-
58
-
-
77952709893
-
Efficient generation of near optimal initial populations to enhance genetic algorithms for job-shop scheduling
-
A. M. Kuczapski, M. V. Micea, L. A. Maniu, and V. I. Cretu. Efficient generation of near optimal initial populations to enhance genetic algorithms for job-shop scheduling. Information Technology and Control, 39(1), 2015.
-
(2015)
Information Technology and Control
, vol.39
, Issue.1
-
-
Kuczapski, A.M.1
Micea, M.V.2
Maniu, L.A.3
Cretu, V.I.4
-
61
-
-
70349284999
-
Aco-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints
-
L. Li, F. Qiao, and Q. D. Wu. Aco-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints. The International Journal of Advanced Manufacturing Technology, 44(9-10):985-994, 2009.
-
(2009)
The International Journal of Advanced Manufacturing Technology
, vol.44
, Issue.9-10
, pp. 985-994
-
-
Li, L.1
Qiao, F.2
Wu, Q.D.3
-
62
-
-
84888391224
-
Ant colony optimization for unrelated parallel machine scheduling: The international journal of advanced manufacturing technology
-
C.-W. Lin, Y.-K. Lin, and H.-T. Hsieh. Ant colony optimization for unrelated parallel machine scheduling: The international journal of advanced manufacturing technology. Int J Adv Manuf Technol, 67(1-4):35-45, 2013.
-
(2013)
Int J Adv Manuf Technol
, vol.67
, Issue.1-4
, pp. 35-45
-
-
Lin, C.-W.1
Lin, Y.-K.2
Hsieh, H.-T.3
-
63
-
-
0000861722
-
A proof for the queuing formula: L = l w
-
J. D. C. Little. A proof for the queuing formula: L = l w. Operations Research, 9(3):383-387, 1961.
-
(1961)
Operations Research
, vol.9
, Issue.3
, pp. 383-387
-
-
Little, J.D.C.1
-
65
-
-
0000237789
-
On the job-shop scheduling problem
-
A. S. Manne. On the job-shop scheduling problem. Operations Research, 8(2):219-223, 1960.
-
(1960)
Operations Research
, vol.8
, Issue.2
, pp. 219-223
-
-
Manne, A.S.1
-
66
-
-
27944487498
-
Heuristics for minimizing total weighted tardiness in complex job shops
-
S. J. Mason, J. W. Fowler, W. M. Carlyle, and D. C. Montgomery. Heuristics for minimizing total weighted tardiness in complex job shops. International Journal of Production Research, 43(10):1943-1963, 2005.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.10
, pp. 1943-1963
-
-
Mason, S.J.1
Fowler, J.W.2
Carlyle, W.M.3
Montgomery, D.C.4
-
67
-
-
0042622980
-
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
-
S. J. Mason, J. W. Fowler, and W. Matthew Carlyle. A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5(3):247-262, 2002.
-
(2002)
Journal of Scheduling
, vol.5
, Issue.3
, pp. 247-262
-
-
Mason, S.J.1
Fowler, J.W.2
Matthew Carlyle, W.3
-
68
-
-
1342308533
-
Rescheduling strategies for minimizing total weighted tardiness in complex job shops
-
S. J. Mason, S. Jin, and C. M. Wessels. Rescheduling strategies for minimizing total weighted tardiness in complex job shops. International Journal of Production Research, 42(3):613-628, 2004.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.3
, pp. 613-628
-
-
Mason, S.J.1
Jin, S.2
Wessels, C.M.3
-
72
-
-
26444453872
-
A distributed shifting bottleneck heuristic for complex job shops
-
L. Mönch and R. Driessel. A distributed shifting bottleneck heuristic for complex job shops. Computers & Industrial Engineering, 49(3):363-380, 2005.
-
(2005)
Computers & Industrial Engineering
, vol.49
, Issue.3
, pp. 363-380
-
-
Mönch, L.1
Driessel, R.2
-
73
-
-
84855921402
-
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
-
L. Mönch, J. W. Fowler, S. Dauzère-Pérès, S. J. Mason, and O. Rose. A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling, 14(6):583-599, 2011.
-
(2011)
Journal of Scheduling
, vol.14
, Issue.6
, pp. 583-599
-
-
Mönch, L.1
Fowler, J.W.2
Dauzère-Pérès, S.3
Mason, S.J.4
Rose, O.5
-
74
-
-
84887752143
-
Production planning and control for semiconductor wafer fabrication facilities: Modeling, analysis, and systems
-
Springer, New York
-
L. Mönch, J. W. Fowler, and S. J. Mason. Production planning and control for semiconductor wafer fabrication facilities: Modeling, analysis, and systems, volume vol. 52 of Operations research/computer science interfaces series. Springer, New York, 2013.
-
(2013)
Operations Research/computer Science Interfaces Series
, vol.52
-
-
Mönch, L.1
Fowler, J.W.2
Mason, S.J.3
-
75
-
-
33750718514
-
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
-
L. Mönch, R. Schabacker, D. Pabst, and J. W. Fowler. Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. European Journal of Operational Research, 177(3):2100-2118, 2007.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2100-2118
-
-
Mönch, L.1
Schabacker, R.2
Pabst, D.3
Fowler, J.W.4
-
76
-
-
84948978492
-
Fabmas: An agent-based system for production control of semiconductor manufacturing processes
-
V. Mařík, D. McFarlane, and P. Valckenaers, editors, Lecture Notes in Computer Science, Springer Berlin Heidelberg
-
L. Mönch, M. Stehli, and J. Zimmermann. Fabmas: An agent-based system for production control of semiconductor manufacturing processes. In V. Mařík, D. McFarlane, and P. Valckenaers, editors, Holonic and Multi-Agent Systems for Manufacturing, volume 2744 of Lecture Notes in Computer Science, pages 258-267. Springer Berlin Heidelberg, 2003.
-
(2003)
Holonic and Multi-Agent Systems for Manufacturing
, vol.2744
, pp. 258-267
-
-
Mönch, L.1
Stehli, M.2
Zimmermann, J.3
-
77
-
-
33750536437
-
The fabmas multi-agent-system prototype for production control of water fabs: Design, implementation and performance assessment
-
L. Mönch, M. Stehli, J. Zimmermann, and I. Habenicht. The fabmas multi-agent-system prototype for production control of water fabs: design, implementation and performance assessment. Production Planning & Control, 17(7):701-716, 2006.
-
(2006)
Production Planning & Control
, vol.17
, Issue.7
, pp. 701-716
-
-
Mönch, L.1
Stehli, M.2
Zimmermann, J.3
Habenicht, I.4
-
78
-
-
31744446040
-
Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines
-
L. Mönch, J. Zimmermann, and P. Otto. Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. Engineering Applications of Artificial Intelligence, 19(3):235-245, 2006.
-
(2006)
Engineering Applications of Artificial Intelligence
, vol.19
, Issue.3
, pp. 235-245
-
-
Mönch, L.1
Zimmermann, J.2
Otto, P.3
-
79
-
-
0000793139
-
Cramming more components onto integrated circuits
-
electronics, april
-
G. E. Moore. Cramming more components onto integrated circuits. (electronics, 38 (8), april 1965). VLSI Technologies and Architectures, 2010.
-
(1965)
VLSI Technologies and Architectures
, vol.38
, Issue.8
-
-
Moore, G.E.1
-
80
-
-
84881563554
-
A computational study of representations in genetic programming to evolve dispatching rules for the job shop scheduling problem
-
S. Nguyen, M. Zhang, M. Johnston, and K. C. Tan. A computational study of representations in genetic programming to evolve dispatching rules for the job shop scheduling problem. IEEE Transactions on Evolutionary Computation, 17(5):621-639, 2013.
-
(2013)
IEEE Transactions on Evolutionary Computation
, vol.17
, Issue.5
, pp. 621-639
-
-
Nguyen, S.1
Zhang, M.2
Johnston, M.3
Tan, K.C.4
-
82
-
-
0011662821
-
-
VDI-Buch. Springer Berlin, Berlin, korr. aufl. edition
-
P. Nyhuis and H. P. Wiendahl. Logistische Kennlinien: Grundlagen, Werkzeuge und Anwendungen. VDI-Buch. Springer Berlin, Berlin, 3., korr. aufl. edition, 2010.
-
(2010)
Logistische Kennlinien: Grundlagen, Werkzeuge und Anwendungen
, vol.3
-
-
Nyhuis, P.1
Wiendahl, H.P.2
-
83
-
-
0036960197
-
From overall equipment efficiency (oee) to overall fab effectiveness (ofe)
-
R. Oechsner, M. Pfeffer, L. Pfitzner, H. Binder, E. Müller, and T. Vonderstrass. From overall equipment efficiency (oee) to overall fab effectiveness (ofe). EMRS, symposium O, 5(4-5):333-339, 2002.
-
(2002)
EMRS, Symposium O
, vol.5
, Issue.4-5
, pp. 333-339
-
-
Oechsner, R.1
Pfeffer, M.2
Pfitzner, L.3
Binder, H.4
Müller, E.5
Vonderstrass, T.6
-
84
-
-
77957790861
-
Learning effective new single machine dispatching rules from optimal scheduling data
-
S. Olafsson and X. Li. Learning effective new single machine dispatching rules from optimal scheduling data. International Journal of Production Economics, 128(1):118-126, 2010.
-
(2010)
International Journal of Production Economics
, vol.128
, Issue.1
, pp. 118-126
-
-
Olafsson, S.1
Li, X.2
-
87
-
-
33746054949
-
A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
-
D. Petrovic and A. Duenas. A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy sets and systems, 157(16):2273-2285, 2006.
-
(2006)
Fuzzy Sets and Systems
, vol.157
, Issue.16
, pp. 2273-2285
-
-
Petrovic, D.1
Duenas, A.2
-
88
-
-
84955263052
-
Semiconductor manufacturing scheduling and dispatching
-
J. Herrmann, editor, International Series in Operations Research & Management Science, Springer US
-
M. Pfund, S. Mason, and J. Fowler. Semiconductor manufacturing scheduling and dispatching. In J. Herrmann, editor, Handbook of Production Scheduling, volume 89 of International Series in Operations Research & Management Science, pages 213-241. Springer US, 2006.
-
(2006)
Handbook of Production Scheduling
, vol.89
, pp. 213-241
-
-
Pfund, M.1
Mason, S.2
Fowler, J.3
-
89
-
-
84880918018
-
Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems
-
C. W. Pickardt, T. Hildebrandt, J. Branke, J. Heger, and B. Scholz-Reiter. Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems. International Journal of Production Economics, 145(1):67-77, 2013.
-
(2013)
International Journal of Production Economics
, vol.145
, Issue.1
, pp. 67-77
-
-
Pickardt, C.W.1
Hildebrandt, T.2
Branke, J.3
Heger, J.4
Scholz-Reiter, B.5
-
90
-
-
84866898775
-
-
Springer International Publishing
-
M. Pinedo. Scheduling. Springer International Publishing, 2016.
-
(2016)
Scheduling
-
-
Pinedo, M.1
-
91
-
-
0036928708
-
Some issues of the critical ratio dispatch rule in semiconductor manufacturing
-
8-11 Dec.
-
O. Rose. Some issues of the critical ratio dispatch rule in semiconductor manufacturing. In 2002 Winter Simulation Conference, pages 1401-1405, 8-11 Dec. 2002.
-
(2002)
2002 Winter Simulation Conference
, pp. 1401-1405
-
-
Rose, O.1
-
92
-
-
84923023813
-
Capacitated qualification management in semiconductor manufacturing
-
M. Rowshannahad, S. Dauzère-Pérès, and B. Cassini. Capacitated qualification management in semiconductor manufacturing. Omega, 54:50-59, 2015.
-
(2015)
Omega
, vol.54
, pp. 50-59
-
-
Rowshannahad, M.1
Dauzère-Pérès, S.2
Cassini, B.3
-
94
-
-
85016206112
-
Software: Die zukunft der industrie
-
Springer
-
S. Russwurm. Software: Die zukunft der industrie. In Industrie 4.0, pages 21-36. Springer, 2013.
-
(2013)
Industrie 4.0
, pp. 21-36
-
-
Russwurm, S.1
-
95
-
-
78650614174
-
A survey of dispatching rules for operational control in wafer fabrication
-
S. C. Sarin, A. Varadarajan, and L. Wang. A survey of dispatching rules for operational control in wafer fabrication. Production Planning and Control, 22(1):4-24, 2011.
-
(2011)
Production Planning and Control
, vol.22
, Issue.1
, pp. 4-24
-
-
Sarin, S.C.1
Varadarajan, A.2
Wang, L.3
-
97
-
-
84994742651
-
-
Semiconductor Industry Associations of the United States, Europe, Japan, South Korea and Taiwan
-
Semiconductor Industry Associations of the United States, Europe, Japan, South Korea and Taiwan. The international technology roadmap for semiconductors 2.0-2015 edition, 2015.
-
(2015)
The International Technology Roadmap for Semiconductors 2.0-2015 Edition
-
-
-
98
-
-
84924111881
-
-
Cambridge University Press, Cambridge
-
Y. Shoham and K. Leyton-Brown. Multiagent systems: Algorithmic, game-theoretic, and logical foundations / Yoav Shoham, Kevin Leyton-Brown. Cambridge University Press, Cambridge, 2009.
-
(2009)
Multiagent Systems: Algorithmic, Game-theoretic, and Logical Foundations / Yoav Shoham, Kevin Leyton-Brown
-
-
Shoham, Y.1
Leyton-Brown, K.2
-
99
-
-
0002066821
-
Various optimizers for single-stage production
-
W. E. Smith. Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3(1-2):59-66, 1956.
-
(1956)
Naval Research Logistics Quarterly
, vol.3
, Issue.1-2
, pp. 59-66
-
-
Smith, W.E.1
-
100
-
-
79961190616
-
Sequence-dependent setup and clean-up times in a two-machine job-shop with minimizing makespan
-
Y. N. Sotskov and F. Werner. Sequence-dependent setup and clean-up times in a two-machine job-shop with minimizing makespan. IFAC Proceedings Volumes, 39(3):51-56, 2006.
-
(2006)
IFAC Proceedings Volumes
, vol.39
, Issue.3
, pp. 51-56
-
-
Sotskov, Y.N.1
Werner, F.2
-
101
-
-
84887649911
-
-
Fraunhofer Verlag Stuttgart
-
D. Spath, O. Ganschar, S. Gerlach, M. Hämmerle, T. Krause, and S. Schlund. Produktionsarbeit der Zukunft-Industrie 4.0. Fraunhofer Verlag Stuttgart, 2013.
-
(2013)
Produktionsarbeit der Zukunft-Industrie 4.0
-
-
Spath, D.1
Ganschar, O.2
Gerlach, S.3
Hämmerle, M.4
Krause, T.5
Schlund, S.6
-
102
-
-
38849162891
-
Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
-
J. C. Tay and N. B. Ho. Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Computers & Industrial Engineering, 54(3):453-473, 2008.
-
(2008)
Computers & Industrial Engineering
, vol.54
, Issue.3
, pp. 453-473
-
-
Tay, J.C.1
Ho, N.B.2
-
103
-
-
84925874141
-
Modeling, analysis, and scheduling of cluster tools with two independent arms
-
D. Tonke and T.-E. Lee. Modeling, analysis, and scheduling of cluster tools with two independent arms. IEEE Transactions on Automation Science and Engineering, 13(2):1176-1188, 2016.
-
(2016)
IEEE Transactions on Automation Science and Engineering
, vol.13
, Issue.2
, pp. 1176-1188
-
-
Tonke, D.1
Lee, T.-E.2
-
104
-
-
0005025729
-
Performance evaluation of dispatching rules for semiconductor testing operations
-
R. Uzsoy, L. K. Church, I. M. Ovacik, and J. Hinchman. Performance evaluation of dispatching rules for semiconductor testing operations. Journal of Electronics Manufacturing, 3(02):95-105, 1993.
-
(1993)
Journal of Electronics Manufacturing
, vol.3
, Issue.2
, pp. 95-105
-
-
Uzsoy, R.1
Church, L.K.2
Ovacik, I.M.3
Hinchman, J.4
-
105
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
A. P. J. Vepsalainen and T. E. Morton. Priority rules for job shops with weighted tardiness costs. Management science, 33(8):1035-1047, 1987.
-
(1987)
Management Science
, vol.33
, Issue.8
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
107
-
-
84962359347
-
The heuristic preemptive dispatching method for convey-based automated material handling system of 450mm wafer fabrication
-
C.-N. Wang, Y.-H. Lee, H.-P. Hsu, and D.-H. Nguyen. The heuristic preemptive dispatching method for convey-based automated material handling system of 450mm wafer fabrication. Computers & Industrial Engineering, 96:52-60, 2016.
-
(2016)
Computers & Industrial Engineering
, vol.96
, pp. 52-60
-
-
Wang, C.-N.1
Lee, Y.-H.2
Hsu, H.-P.3
Nguyen, D.-H.4
-
108
-
-
0036778940
-
A genetic algorithm to minimize maximum lateness on a batch processing machine
-
C.-S. Wang and R. Uzsoy. A genetic algorithm to minimize maximum lateness on a batch processing machine. Computers & Operations Research, 29(12):1621-1640, 2002.
-
(2002)
Computers & Operations Research
, vol.29
, Issue.12
, pp. 1621-1640
-
-
Wang, C.-S.1
Uzsoy, R.2
-
109
-
-
40849126576
-
A neural network job-shop scheduler
-
G. R. Weckman, C. V. Ganduri, and D. A. Koonce. A neural network job-shop scheduler. Journal of Intelligent Manufacturing, 19(2):191-201, 2008.
-
(2008)
Journal of Intelligent Manufacturing
, vol.19
, Issue.2
, pp. 191-201
-
-
Weckman, G.R.1
Ganduri, C.V.2
Koonce, D.A.3
-
112
-
-
38949143264
-
A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints
-
H. J. Yoon and W. Shen. A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints. Semiconductor Manufacturing, IEEE Transactions on, 21(1):83-91, 2008.
-
(2008)
Semiconductor Manufacturing, IEEE Transactions on
, vol.21
, Issue.1
, pp. 83-91
-
-
Yoon, H.J.1
Shen, W.2
-
113
-
-
84924221289
-
Integration of scheduling and advanced process control in semiconductor manufacturing: Review and outlook
-
C. Yugma, J. Blue, S. Dauzère-Pérès, and A. Obeid. Integration of scheduling and advanced process control in semiconductor manufacturing: Review and outlook. Journal of Scheduling, 18(2):195-205, 2015.
-
(2015)
Journal of Scheduling
, vol.18
, Issue.2
, pp. 195-205
-
-
Yugma, C.1
Blue, J.2
Dauzère-Pérès, S.3
Obeid, A.4
|