메뉴 건너뛰기




Volumn 45, Issue 3, 2007, Pages 675-697

Analysis of a borderless fab using interoperating AutoSched AP models

Author keywords

Borderless fab; Capacity sharing; Distributed simulation; Outsourcing

Indexed keywords

ALGORITHMS; COMPUTER AIDED MANUFACTURING; COMPUTER SIMULATION; COMPUTER SOFTWARE; DISTRIBUTED COMPUTER SYSTEMS; MATHEMATICAL MODELS; OUTSOURCING; PROCESS CONTROL;

EID: 33847042377     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600792382     Document Type: Conference Paper
Times cited : (14)

References (21)
  • 2
    • 33847019991 scopus 로고    scopus 로고
    • Brooks Automation. AutoSched AP Customization Guide v 7.0, 2001.
    • Brooks Automation. AutoSched AP Customization Guide v 7.0, 2001.
  • 3
    • 5644226369 scopus 로고
    • Shared capacity resource reallocation in a decentralized service system
    • Charalambides, L.C., Shared capacity resource reallocation in a decentralized service system. J. Oper. Manag., 1984, 5(1), 57-74.
    • (1984) J. Oper. Manag , vol.5 , Issue.1 , pp. 57-74
    • Charalambides, L.C.1
  • 5
    • 18744373317 scopus 로고    scopus 로고
    • Comparison and evaluation of lot-to-order matching policies for a semiconductor assembly and test facility
    • Fowler, J., Knutson, K. and Carlyle, M., Comparison and evaluation of lot-to-order matching policies for a semiconductor assembly and test facility. Int. J. Prod. Res., 2000, 38(8), 1841-1853.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.8 , pp. 1841-1853
    • Fowler, J.1    Knutson, K.2    Carlyle, M.3
  • 6
    • 0000726609 scopus 로고    scopus 로고
    • Time management in the High Level Architecture
    • Fujimoto, R.M., Time management in the High Level Architecture. SIMULATION, 1998, 71(6), 388-400.
    • (1998) SIMULATION , vol.71 , Issue.6 , pp. 388-400
    • Fujimoto, R.M.1
  • 8
    • 0034818424 scopus 로고    scopus 로고
    • Theory and methodology benefits of co-operation in a production distribution environment
    • Gavirneni, S., Theory and methodology benefits of co-operation in a production distribution environment. Eur. J. Oper. Res., 2001, 130, 612-622.
    • (2001) Eur. J. Oper. Res , vol.130 , pp. 612-622
    • Gavirneni, S.1
  • 9
    • 0012345221 scopus 로고    scopus 로고
    • IEEE standard for modeling and simulation (M&S) High Level Architecture (HLA),
    • IEEE 1516, New York, NY: Institute of Electrical and Electronics Engineers
    • IEEE 1516, IEEE standard for modeling and simulation (M&S) High Level Architecture (HLA), 2000 (New York, NY: Institute of Electrical and Electronics Engineers).
    • (2000)
  • 10
    • 0242302286 scopus 로고    scopus 로고
    • Distributed allocation of the capacity of a single-facility using cooperative interaction via coupling agents
    • Jeong, In-Jae and Leon, V.J., Distributed allocation of the capacity of a single-facility using cooperative interaction via coupling agents. Int. J. Prod. Res., 2003, 41(1), 15-30.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.1 , pp. 15-30
    • Jeong, I.1    Leon, V.J.2
  • 11
    • 0035485317 scopus 로고    scopus 로고
    • Production scheduling in a semiconductor wafer fabrication fabrication facility producing multiple product types with distinct due dates
    • Kim, Y.D., Kim, Y.G., Choi, B. and Kim, H.U., Production scheduling in a semiconductor wafer fabrication fabrication facility producing multiple product types with distinct due dates. IEEE Trans. Robot. Autom., 2001, 17(5), 589-598.
    • (2001) IEEE Trans. Robot. Autom , vol.17 , Issue.5 , pp. 589-598
    • Kim, Y.D.1    Kim, Y.G.2    Choi, B.3    Kim, H.U.4
  • 12
    • 0003768321 scopus 로고    scopus 로고
    • Understanding fab economics
    • Report CSM-47, Engineering Systems Research Center, University of California at Berkeley
    • Leachman, R.C., Plummer, J. and Sato-Misawa, N., Understanding fab economics. Report CSM-47, Engineering Systems Research Center, University of California at Berkeley, 1999.
    • (1999)
    • Leachman, R.C.1    Plummer, J.2    Sato-Misawa, N.3
  • 13
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Lee, Y.H., Advanced planning and scheduling with outsourcing in manufacturing supply chain. Comput. Indust. Engng, 2002, 43(1-2), 351-357.
    • (2002) Comput. Indust. Engng , vol.43 , Issue.1-2 , pp. 351-357
    • Lee, Y.H.1
  • 15
    • 0034429115 scopus 로고    scopus 로고
    • Simulation based cause and effect analysis of cycle time distribution in semiconductor backend
    • Sivakumar, A.I., Simulation based cause and effect analysis of cycle time distribution in semiconductor backend. In 2000 Winter Simulation Conference, 2000, pp. 1464-1471.
    • (2000) 2000 Winter Simulation Conference , pp. 1464-1471
    • Sivakumar, A.I.1
  • 16
    • 0003949316 scopus 로고    scopus 로고
    • Stadtler, H. and Kilger, C, Eds, 2nd edition, Springer Verlag: Berlin
    • Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning, 2nd edition, 2002 (Springer Verlag: Berlin).
    • (2002) Supply Chain Management and Advanced Planning
  • 17
    • 0001578006 scopus 로고    scopus 로고
    • Migration of HLA into civil domains
    • Strassburger, S., Schulze, T. and Klein, U., Migration of HLA into civil domains. SIMULATION, 1999, 73(5), 296-303.
    • (1999) SIMULATION , vol.73 , Issue.5 , pp. 296-303
    • Strassburger, S.1    Schulze, T.2    Klein, U.3
  • 18
    • 84867554583 scopus 로고    scopus 로고
    • The COTS Simulation Interoperability Product Development Group
    • Simulation Interoperability Standards Organization, Institute for Simulation and Training, Florida, 05E-SIW-056
    • Taylor, S.J.E., Turner, S.J. and Low, M.Y.H., The COTS Simulation Interoperability Product Development Group. In Proceedings of the 2005 European Interoperability Workshop. Simulation Interoperability Standards Organization, Institute for Simulation and Training, Florida, 05E-SIW-056, 2005.
    • (2005) Proceedings of the 2005 European Interoperability Workshop
    • Taylor, S.J.E.1    Turner, S.J.2    Low, M.Y.H.3
  • 21
    • 0032167361 scopus 로고    scopus 로고
    • Managing production with flexible capacity deployment for serial multi-stage manufacturing systems
    • Weng, Z.K., Managing production with flexible capacity deployment for serial multi-stage manufacturing systems. Eur. J. Oper. Res., 1998, 109(3), 587-598.
    • (1998) Eur. J. Oper. Res , vol.109 , Issue.3 , pp. 587-598
    • Weng, Z.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.