-
1
-
-
0031211263
-
Scheduling parallel machines to minimize total weighted and unweighted tardiness
-
1463067 0893.90083 10.1016/S0305-0548(96)00080-9
-
Alidaee B, Rosa D (1997) Scheduling parallel machines to minimize total weighted and unweighted tardiness. Comput Oper Res 24(8):775-788
-
(1997)
Comput Oper Res
, vol.24
, Issue.8
, pp. 775-788
-
-
Alidaee, B.1
Rosa, D.2
-
3
-
-
64449088021
-
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
-
10.1016/j.eswa.2008.10.007
-
Behnamian J, Zandieh M, Fatemi Ghomi SMT (2009) Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Expert Syst Appl 36(2):9637-9644
-
(2009)
Expert Syst Appl
, vol.36
, Issue.2
, pp. 9637-9644
-
-
Behnamian, J.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
4
-
-
69649088452
-
Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms
-
10.1007/s00170-008-1885-7
-
Behnamian J, Zandieh M, Fatemi Ghomi SMT (2009) Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms. Int J Adv Manuf Technol 44:795-808
-
(2009)
Int J Adv Manuf Technol
, vol.44
, pp. 795-808
-
-
Behnamian, J.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
5
-
-
84947905083
-
Ant colony optimization for the total weighted tardiness problem
-
10.1007/3-540-45356-3-60
-
Besten MD, Stützle T, Dorigo M (2000) Ant colony optimization for the total weighted tardiness problem. Lecture Notes in Computer Science 1917:611-620
-
(2000)
Lecture Notes in Computer Science
, vol.1917
, pp. 611-620
-
-
Besten, M.D.1
Stützle, T.2
Dorigo, M.3
-
6
-
-
49049084818
-
Scheduling identical parallel machines to minimize total tardiness
-
10.1016/j.ijpe.2008.04.011
-
Biskup D, Herrmann J, Gupta JND (2008) Scheduling identical parallel machines to minimize total tardiness. Int J Prod Econ 115(1):134-142
-
(2008)
Int J Prod Econ
, vol.115
, Issue.1
, pp. 134-142
-
-
Biskup, D.1
Herrmann, J.2
Gupta, J.N.D.3
-
7
-
-
0004048738
-
-
Springer Berlin 10.1007/978-3-662-03217-6
-
Blazewicz J, Ecker K, Pesch E, Schmidt G, Weglarz J (1996) Scheduling computer and manufacturing process. Springer, Berlin
-
(1996)
Scheduling Computer and Manufacturing Process
-
-
Blazewicz, J.1
Ecker, K.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
-
9
-
-
10644241667
-
Parallel machine selection and job scheduling to minimize machine cost and job tardiness
-
1068.90054 10.1016/j.cor.2004.01.001
-
Cao D, Chen M, Wan G (2005) Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Comput Oper Res 32(8):1995-2012
-
(2005)
Comput Oper Res
, vol.32
, Issue.8
, pp. 1995-2012
-
-
Cao, D.1
Chen, M.2
Wan, G.3
-
10
-
-
0033084695
-
Ant algorithms for distributed discrete optimization
-
10.1162/106454699568728
-
Dorigo M, Di Caro G, Gambardella LM (1999) Ant algorithms for distributed discrete optimization. Artificial Life 5(2):137-172
-
(1999)
Artificial Life
, vol.5
, Issue.2
, pp. 137-172
-
-
Dorigo, M.1
Di Caro, G.2
Gambardella, L.M.3
-
12
-
-
80051952405
-
Ant colony optimization: Overview and recent advances
-
10.1007/978-1-4419-1665-5-8
-
Dorigo M, Stützle T (2010) Ant colony optimization: overview and recent advances. Int Ser Oper Res Manage Sci 146:227-263
-
(2010)
Int ser Oper Res Manage Sci
, vol.146
, pp. 227-263
-
-
Dorigo, M.1
Stützle, T.2
-
13
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
0411.90044 10.1016/S0167-5060(08)70356-X
-
Graham R, Lawler E, Lenstra J, Rinnooy KA (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discret Math 5:287-326
-
(1979)
Ann Discret Math
, vol.5
, pp. 287-326
-
-
Graham, R.1
Lawler, E.2
Lenstra, J.3
Rinnooy, K.A.4
-
14
-
-
42449111726
-
Customer order scheduling problem a comparative metaheuristics study
-
10.1007/s00170-007-0998-8
-
HazIr Ö, Günalay Y, Erel E (2008) Customer order scheduling problem a comparative metaheuristics study. Int J Adv Manuf Technol 37(5-6):589-598
-
(2008)
Int J Adv Manuf Technol
, vol.37
, Issue.5-6
, pp. 589-598
-
-
Hazir, Ö.1
Günalay, Y.2
Erel, E.3
-
15
-
-
22744450247
-
A fast ant-colony algorithm for single-machine scheduling to minimize the sum of weighted tardiness of jobs
-
02200965 10.1057/palgrave.jors.2601906
-
Holthaus O, Rajendran C (2005) A fast ant-colony algorithm for single-machine scheduling to minimize the sum of weighted tardiness of jobs. J Oper Res Soc 56(8):947-953
-
(2005)
J Oper Res Soc
, vol.56
, Issue.8
, pp. 947-953
-
-
Holthaus, O.1
Rajendran, C.2
-
16
-
-
0031075568
-
Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
-
0882.90068 10.1002/(SICI)1520-6750(199702)44:1<109: AID-NAV7>3.0.CO;2-E
-
Koulamas C (1997) Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem. Nav Res Logist 44(1):109-125
-
(1997)
Nav Res Logist
, vol.44
, Issue.1
, pp. 109-125
-
-
Koulamas, C.1
-
18
-
-
70349284999
-
ACO-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints
-
10.1007/s00170-008-1904-8
-
Li L, Qiao F, Wu QD (2009) ACO-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints. Int J Adv Manuf Technol 44(9-10):985-994
-
(2009)
Int J Adv Manuf Technol
, vol.44
, Issue.9-10
, pp. 985-994
-
-
Li, L.1
Qiao, F.2
Wu, Q.D.3
-
19
-
-
33845332680
-
An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups
-
1112.90030 10.1016/j.cor.2005.07.020
-
Liao CJ, Juan HC (2007) An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups. Comput Oper Res 34(7):1899-1909
-
(2007)
Comput Oper Res
, vol.34
, Issue.7
, pp. 1899-1909
-
-
Liao, C.J.1
Juan, H.C.2
-
20
-
-
0042311378
-
Scheduling unrelated parallel machines to minimize total weighted tardiness
-
2007915 1047.90021 10.1016/S0305-0548(02)00105-3
-
Liaw CF, Lin YK, Cheng CY, Chen MC (2003) Scheduling unrelated parallel machines to minimize total weighted tardiness. Comput Oper Res 30(12):1777-1789
-
(2003)
Comput Oper Res
, vol.30
, Issue.12
, pp. 1777-1789
-
-
Liaw, C.F.1
Lin, Y.K.2
Cheng, C.Y.3
Chen, M.C.4
-
21
-
-
78549251688
-
Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems
-
2737887 1205.90130 10.1016/j.cor.2010.08.018
-
Lin YK, Pfund ME, Fowler JW (2011) Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Comput Oper Res 38(6):901-916
-
(2011)
Comput Oper Res
, vol.38
, Issue.6
, pp. 901-916
-
-
Lin, Y.K.1
Pfund, M.E.2
Fowler, J.W.3
-
22
-
-
0042622980
-
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
-
1998689 1009.90045 10.1002/jos.102
-
Mason SC, Fowler JW, Carlyle WM (2002) A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. J Sched 5(3):247-262
-
(2002)
J Sched
, vol.5
, Issue.3
, pp. 247-262
-
-
Mason, S.C.1
Fowler, J.W.2
Carlyle, W.M.3
-
23
-
-
0037272238
-
Ant colony optimization with global pheromone evaluation for scheduling a single machine
-
1033.68018 10.1023/A:1020999407672
-
Merkle D, Middendorf M (2003) Ant colony optimization with global pheromone evaluation for scheduling a single machine. Appl Intell 18(1):105-111
-
(2003)
Appl Intell
, vol.18
, Issue.1
, pp. 105-111
-
-
Merkle, D.1
Middendorf, M.2
-
26
-
-
0027906584
-
A heuristic for the single machine tardiness problem
-
0782.90057 10.1016/0377-2217(93)90241-E
-
Panwalkar SS, Smith ML, Koulamas CP (1993) A heuristic for the single machine tardiness problem. Eur J Oper Res 70(3):304-10
-
(1993)
Eur J Oper Res
, vol.70
, Issue.3
, pp. 304-310
-
-
Panwalkar, S.S.1
Smith, M.L.2
Koulamas, C.P.3
-
27
-
-
24644516597
-
A survey of algorithm for single and multi-objective unrelated parallel-machine deterministic scheduling problems
-
Pfund M, Fowler JW, Gupta JND (2004) A survey of algorithm for single and multi-objective unrelated parallel-machine deterministic scheduling problems. J Chin Inst Ind Eng 21(3):230-241
-
(2004)
J Chin Inst Ind Eng
, vol.21
, Issue.3
, pp. 230-241
-
-
Pfund, M.1
Fowler, J.W.2
Gupta, J.N.D.3
-
29
-
-
0020205577
-
A decomposition algorithm for the single machine total tardiness problem
-
0508.90045 10.1016/0167-6377(82)90035-9
-
Potts C, Van Wassenhove LN (1982) A decomposition algorithm for the single machine total tardiness problem. Oper Res Lett 1(5):177-181
-
(1982)
Oper Res Lett
, vol.1
, Issue.5
, pp. 177-181
-
-
Potts, C.1
Van Wassenhove, L.N.2
-
30
-
-
33847695701
-
Minimizing makespan during environmental stress screening using a genetic algorithm and an ant colony optimization
-
10.1007/s00170-005-0346-9
-
Pradhan S, Lam SSY (2007) Minimizing makespan during environmental stress screening using a genetic algorithm and an ant colony optimization. Int J Adv Manuf Technol 32(5-6):571-577
-
(2007)
Int J Adv Manuf Technol
, vol.32
, Issue.5-6
, pp. 571-577
-
-
Pradhan, S.1
Lam, S.S.Y.2
-
31
-
-
33847337393
-
-
IEEE Hong Kong
-
Sankar SS, Ponnambalam S, Rathinavel V, Visveshvaren M (2005) Scheduling in parallel machine shop: an ant colony optimization approach. Industrial technology. IEEE, Hong Kong, pp 276-280
-
(2005)
Scheduling in Parallel Machine Shop: An Ant Colony Optimization Approach. Industrial Technology
, pp. 276-280
-
-
Sankar, S.S.1
Ponnambalam, S.2
Rathinavel, V.3
Visveshvaren, M.4
-
32
-
-
33751067267
-
Scheduling on parallel identical machines to minimize total tardiness
-
2270008 1111.90046 10.1016/j.ejor.2005.09.038
-
Shim SO, Kim YD (2007) Scheduling on parallel identical machines to minimize total tardiness. Eur J Oper Res 177(1):135-146
-
(2007)
Eur J Oper Res
, vol.177
, Issue.1
, pp. 135-146
-
-
Shim, S.O.1
Kim, Y.D.2
-
33
-
-
63049114827
-
Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimization
-
10.1007/s00170-008-1544-z
-
Srinivasa Raghavan NR, Venkataramana M (2009) Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimization. Int J Adv Manuf Technol 41(9):986-996
-
(2009)
Int J Adv Manuf Technol
, vol.41
, Issue.9
, pp. 986-996
-
-
Srinivasa Raghavan, N.R.1
Venkataramana, M.2
-
34
-
-
0023399009
-
Priority rules and lead time estimation for job shop scheduling with weighted tardiness costs
-
10.1287/mnsc.33.8.1035
-
Vepsalainen APJ, Morton TE (1987) Priority rules and lead time estimation for job shop scheduling with weighted tardiness costs. Manag Sci 33:1036-1047
-
(1987)
Manag Sci
, vol.33
, pp. 1036-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
35
-
-
0142258724
-
An ant colony system approach for scheduling problems
-
10.1080/0953728031000089988
-
Ying KC, Liao CJ (2003) An ant colony system approach for scheduling problems. Prod Plan Control Manag Oper 14(1):68-75
-
(2003)
Prod Plan Control Manag Oper
, vol.14
, Issue.1
, pp. 68-75
-
-
Ying, K.C.1
Liao, C.J.2
|