메뉴 건너뛰기




Volumn 21, Issue 1, 2008, Pages 83-91

A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints

Author keywords

Decision making systems; Hard temporal constraints; Multiagent systems; Scheduling; Semiconductor manufacturing

Indexed keywords

CONSTRAINT THEORY; MULTI AGENT SYSTEMS; PROBLEM SOLVING; SCHEDULING; WSI CIRCUITS;

EID: 38949143264     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2007.914388     Document Type: Conference Paper
Times cited : (46)

References (27)
  • 2
    • 0002648815 scopus 로고    scopus 로고
    • Agents, holons and function blocks: Distributed intelligent control in manufacturing
    • R. W. Brennan and D. H. Norrie, "Agents, holons and function blocks: Distributed intelligent control in manufacturing," J. Appl. Syst. Studies, vol. 2, no. 1, pp. 1-19, 2001.
    • (2001) J. Appl. Syst. Studies , vol.2 , Issue.1 , pp. 1-19
    • Brennan, R.W.1    Norrie, D.H.2
  • 3
    • 1842503831 scopus 로고    scopus 로고
    • Development of holonic manufacturing execution systems
    • F. T. Cheng, C. F. Chang, and S. L. Wu, "Development of holonic manufacturing execution systems," J. Intell. Manuf., vol. 15, pp. 253-267, 2004.
    • (2004) J. Intell. Manuf , vol.15 , pp. 253-267
    • Cheng, F.T.1    Chang, C.F.2    Wu, S.L.3
  • 4
    • 0032000755 scopus 로고    scopus 로고
    • Cyclic scheduling of a hoist with time window constraints
    • Jan
    • H. Chen, C. Chu, and J. M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Automat., vol. 14, no. 1, pp. 144-152, Jan. 1998.
    • (1998) IEEE Trans. Robot. Automat , vol.14 , Issue.1 , pp. 144-152
    • Chen, H.1    Chu, C.2    Proth, J.M.3
  • 6
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • N. G. Hall and C. Sriskandarajah, "A survey of machine scheduling problems with blocking and no-wait in process," Oper. Res., vol. 44, no. 3, pp. 510-525, 1996.
    • (1996) Oper. Res , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 8
    • 38949215380 scopus 로고    scopus 로고
    • K. Kempf, Intel Five-Machine Six Step Mini-Fab Description. [Online]. Available: http://www.eas.asu.edu/~aar/research/intel/papers/fabspec.html Intel/ASU Rep. [online].
    • K. Kempf, Intel Five-Machine Six Step Mini-Fab Description. [Online]. Available: http://www.eas.asu.edu/~aar/research/intel/papers/fabspec.html Intel/ASU Rep. [online].
  • 9
    • 0035485317 scopus 로고    scopus 로고
    • Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates
    • May
    • Y. D. Kim, J. G. Kim, B. Choi, and H. U. Kim., "Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates," IEEE Trans. Robot Automat., vol. 17, no. 5, pp. 589-598, May 2001.
    • (2001) IEEE Trans. Robot Automat , vol.17 , Issue.5 , pp. 589-598
    • Kim, Y.D.1    Kim, J.G.2    Choi, B.3    Kim, H.U.4
  • 10
    • 0032002955 scopus 로고    scopus 로고
    • Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility
    • Feb
    • Y. D. Kim, J. U. Kim, S. K. Lim, and H. B. Jun, "Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility," IEEE Trans. Semiconduct. Manuf., vol. 11, no. 1, pp. 155-154, Feb. 1998.
    • (1998) IEEE Trans. Semiconduct. Manuf , vol.11 , Issue.1 , pp. 155-154
    • Kim, Y.D.1    Kim, J.U.2    Lim, S.K.3    Jun, H.B.4
  • 11
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • Dec
    • S. H. Lu and P. R. Kumar, "Distributed scheduling based on due dates and buffer priorities," IEEE Trans. Automat. Contr., vol. 36, no. 12, pp. 1406-1416, Dec. 1991.
    • (1991) IEEE Trans. Automat. Contr , vol.36 , Issue.12 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2
  • 12
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Aug
    • S. H. Lu, D. Ramaswamy, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants," IEEE Trans. Semiconduct. Manuf., vol. 7, no. 3, pp. 374-388, Aug. 1994.
    • (1994) IEEE Trans. Semiconduct. Manuf , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 13
    • 1342308533 scopus 로고    scopus 로고
    • Rescheduling strategies for minimizing total weighted tardiness in complex job shop
    • S. J. Mason, S. Jin, and C. M. Wessels, "Rescheduling strategies for minimizing total weighted tardiness in complex job shop," Int. J. Production Res., vol. 42, no. 3, pp. 613-628, 2004.
    • (2004) Int. J. Production Res , vol.42 , Issue.3 , pp. 613-628
    • Mason, S.J.1    Jin, S.2    Wessels, C.M.3
  • 14
    • 38949145629 scopus 로고    scopus 로고
    • An ontology for production control of semi-conductor manufacturing processes
    • Erfurt, Germany, Sep. 22-25
    • L. Mönch and M. Stehli, "An ontology for production control of semi-conductor manufacturing processes," in Proc. First German Conf. Multiagent System Technologies, Erfurt, Germany, Sep. 22-25, 2003.
    • (2003) Proc. First German Conf. Multiagent System Technologies
    • Mönch, L.1    Stehli, M.2
  • 16
  • 17
    • 0028320392 scopus 로고
    • Scheduling algorithm and operating systems support for real-time systems
    • Jan
    • K. Ramamritham and J. A. Stankovic, "Scheduling algorithm and operating systems support for real-time systems," Proc. IEEE, vol. 82, no. 1, pp. 55-67, Jan. 1994.
    • (1994) Proc. IEEE , vol.82 , Issue.1 , pp. 55-67
    • Ramamritham, K.1    Stankovic, J.A.2
  • 18
    • 0025417235 scopus 로고
    • Efficient scheduling algorithms for real-time multiprocessor systems
    • K. Ramamritham, J. A. Stankovic, and P. F. Shiah, "Efficient scheduling algorithms for real-time multiprocessor systems," IEEE Trans. Parallel Distributed Syst., vol. 1, no. 2, pp. 184-194, 1990.
    • (1990) IEEE Trans. Parallel Distributed Syst , vol.1 , Issue.2 , pp. 184-194
    • Ramamritham, K.1    Stankovic, J.A.2    Shiah, P.F.3
  • 19
    • 27744540020 scopus 로고    scopus 로고
    • Capacity planning in a semiconductor wafer fabrication facility with time constraints between process steps,
    • Ph.D. dissertation, Department Mechanical and Industrial Engineering, Univ. Massachusetts, Amherst
    • J. K. Robinson, "Capacity planning in a semiconductor wafer fabrication facility with time constraints between process steps," Ph.D. dissertation, Department Mechanical and Industrial Engineering, Univ. Massachusetts, Amherst, 1998.
    • (1998)
    • Robinson, J.K.1
  • 20
    • 0028207780 scopus 로고
    • Generalized rate-monotonic scheduling theory: A framework for developing real-time systems
    • Feb
    • L. Sha, R. Rajkumar, and S. S. Sathaye, "Generalized rate-monotonic scheduling theory: A framework for developing real-time systems," Proc. IEEE, vol. 82, no. 1, pp. 68-82, Feb. 1994.
    • (1994) Proc. IEEE , vol.82 , Issue.1 , pp. 68-82
    • Sha, L.1    Rajkumar, R.2    Sathaye, S.S.3
  • 21
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • W. Shen, "Distributed manufacturing scheduling using intelligent agents," IEEE Intell. Syst., vol. 17, no. 1, pp. 88-94, 2002.
    • (2002) IEEE Intell. Syst , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1
  • 23
    • 0006600437 scopus 로고    scopus 로고
    • Improving fab performance
    • Jul
    • H. Watts, "Improving fab performance," Future Fab Int., vol. 9, Jul. 2000.
    • (2000) Future Fab Int , vol.9
    • Watts, H.1
  • 24
    • 0003866809 scopus 로고    scopus 로고
    • Reference architecture for holonic manufacturing systems: The key to support evolution and reconfiguration,
    • Ph.D. dissertation, Department Mechanical Eng, Katholieke Universiteit Leuven, Belgium
    • J. Wyns, "Reference architecture for holonic manufacturing systems: The key to support evolution and reconfiguration," Ph.D. dissertation, Department Mechanical Eng., Katholieke Universiteit Leuven, Belgium, 1999.
    • (1999)
    • Wyns, J.1
  • 25
    • 38949090969 scopus 로고    scopus 로고
    • Real-Time scheduling of semiconductor integrated single-wafer processing tools,
    • Ph.D. dissertation, Department Mechanical Eng, Korea Advanced Institute of Science and Technology, Daejeon
    • H. J. Yoon, "Real-Time scheduling of semiconductor integrated single-wafer processing tools," Ph.D. dissertation, Department Mechanical Eng., Korea Advanced Institute of Science and Technology, Daejeon, 2004.
    • (2004)
    • Yoon, H.J.1
  • 26
    • 0034250152 scopus 로고    scopus 로고
    • A control method to reduce the standard deviation of flow time in wafer fabrication
    • Aug
    • H. J. Yoon and D. Y. Lee, "A control method to reduce the standard deviation of flow time in wafer fabrication," IEEE Trans. Semiconduct. Manuf, vol. 13, no. 3, pp. 389-392, Aug. 2000.
    • (2000) IEEE Trans. Semiconduct. Manuf , vol.13 , Issue.3 , pp. 389-392
    • Yoon, H.J.1    Lee, D.Y.2
  • 27
    • 0035737821 scopus 로고    scopus 로고
    • Development of the order fulfillment process in the foundry fab by applying distributed multi-agents on a generic message-passing platform
    • C. Y. Yu and H. P. Huang, "Development of the order fulfillment process in the foundry fab by applying distributed multi-agents on a generic message-passing platform," IEEE/ASME Trans. Mechatronics, vol. 6, no. 4, pp. 387-398, 2001.
    • (2001) IEEE/ASME Trans. Mechatronics , vol.6 , Issue.4 , pp. 387-398
    • Yu, C.Y.1    Huang, H.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.