-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., Balas, E. and Zawack, D., The shifting bottleneck procedure for job shop scheduling. Manage. Sci., 1988, 34, 391-401.
-
(1988)
Manage. Sci.
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0032761113
-
Implementing new dispatching rules at SGS Thomson Microelectronics
-
Cigolini, R., Comi, A., Micheletti, A., Perona, M. and Portioli, A., Implementing new dispatching rules at SGS Thomson Microelectronics. Prod. Plan. Cont., 1999, 10, 97-106.
-
(1999)
Prod. Plan. Cont.
, vol.10
, pp. 97-106
-
-
Cigolini, R.1
Comi, A.2
Micheletti, A.3
Perona, M.4
Portioli, A.5
-
3
-
-
0030415771
-
Hierarchical modeling and control of re-entrant semi-conductor manufacturing facilities
-
Kobe, Japan
-
El Adl, M.K., Rodriguez, A.A. and Tsakalis, K.S., Hierarchical modeling and control of re-entrant semi-conductor manufacturing facilities, Proc. 35th Conf. Decision Control, Kobe, Japan, 1996.
-
(1996)
Proc. 35th Conf. Decision Control
-
-
El Adl, M.K.1
Rodriguez, A.A.2
Tsakalis, K.S.3
-
5
-
-
0026866908
-
Real-time control of multiproduct bulk-service semiconductor manufacturing processes
-
Fowler, J.W., Phillips, D.T. and Hogg, G.L., Real-time control of multiproduct bulk-service semiconductor manufacturing processes, IEEE Transactions on Semi-conductor Manufacturing, 1992, 5, 159-163.
-
(1992)
IEEE Transactions on Semi-conductor Manufacturing
, vol.5
, pp. 159-163
-
-
Fowler, J.W.1
Phillips, D.T.2
Hogg, G.L.3
-
6
-
-
0034135518
-
Control of multiproduct bulk server diffusion/ oxidation processes part two: Multiple servers
-
Fowler, J.W., Hogg, G.L. and Phillips, D.T., Control of multiproduct bulk server diffusion/ oxidation processes part two: multiple servers, IIE Trans. Sched. Logist., 2000, 32, 167-176.
-
(2000)
IIE Trans. Sched. Logist.
, vol.32
, pp. 167-176
-
-
Fowler, J.W.1
Hogg, G.L.2
Phillips, D.T.3
-
7
-
-
0026153052
-
Dynamic batching heuristic for simultaneous processing
-
Glassey, C.R. and Weng, W.W., Dynamic batching heuristic for simultaneous processing, IEEE Trans. Semi-cond. Manuf., 1991, 4, 77-82.
-
(1991)
IEEE Trans. Semi-cond. Manuf.
, vol.4
, pp. 77-82
-
-
Glassey, C.R.1
Weng, W.W.2
-
8
-
-
0030151057
-
Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: A computational study
-
Holtsclaw, H.H. and Uzsoy, R., Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: a computational study. J. Oper. Res. Soc., 1996, 475, 666-677.
-
(1996)
J. Oper. Res. Soc.
, vol.475
, pp. 666-677
-
-
Holtsclaw, H.H.1
Uzsoy, R.2
-
9
-
-
0007992513
-
Recent developments in deterministic sequencing and scheduling: A survey
-
edited by M.A.H. Dempster, J.K. Lenstra and A.H.G. Rinnooy Kan, (Reidel, Dordrecht)
-
Lawler, E.L., Lenstra, J.K. and Rinnooy Kan, A.H.G., Recent developments in deterministic sequencing and scheduling: a survey. In Deterministic and Stochastic Scheduling, edited by M.A.H. Dempster, J.K. Lenstra and A.H.G. Rinnooy Kan, 1982, pp. 35-73 (Reidel, Dordrecht).
-
(1982)
Deterministic and Stochastic Scheduling
, pp. 35-73
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
10
-
-
0346298265
-
-
Technical Report, Department of Industrial Engineering and Operations Research, Columbia University, New York
-
Lee, Y.H., Bhaskaran, M.L. and Pinedo, M.L., A heuristic to minimize the total weighted tardiness with sequence-dependent set-ups. Technical Report, Department of Industrial Engineering and Operations Research, Columbia University, New York, 1991.
-
(1991)
A Heuristic to Minimize the Total Weighted Tardiness with Sequence-dependent Set-ups
-
-
Lee, Y.H.1
Bhaskaran, M.L.2
Pinedo, M.L.3
-
11
-
-
0000482108
-
Scheduling jobs on parallel machines with sequence-dependent set-up times
-
Lee, Y.H. and Pinedo, M.L., Scheduling jobs on parallel machines with sequence-dependent set-up times. Euro. J. Oper. Res., 1997, 100, 464-474.
-
(1997)
Euro. J. Oper. Res.
, vol.100
, pp. 464-474
-
-
Lee, Y.H.1
Pinedo, M.L.2
-
12
-
-
77951139709
-
Complexity of machine scheduling problems
-
Lenstra, J.K., Rinnooy Kan, A.H.G. and Brucker, P., Complexity of machine scheduling problems. Annals Discrete Math., 1977, 1, 343-362.
-
(1977)
Annals Discrete Math.
, vol.1
, pp. 343-362
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
Brucker, P.3
-
13
-
-
27944500774
-
MIP heuristic tuning for complex job shop scheduling
-
Portland, Oregon
-
Mason, S.J., Carlyle, W.M. and Fowler, J.W., MIP heuristic tuning for complex job shop scheduling. Proc. 2003 Indust. Eng. Res. Conf., Portland, Oregon, 2003.
-
(2003)
Proc. 2003 Indust. Eng. Res. Conf.
-
-
Mason, S.J.1
Carlyle, W.M.2
Fowler, J.W.3
-
14
-
-
0042622980
-
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
-
Mason, S.J., Fowler, J.W. and Carlyle, W.M., A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. J. Schedul., 2002, 5, 247-262.
-
(2002)
J. Schedul.
, vol.5
, pp. 247-262
-
-
Mason, S.J.1
Fowler, J.W.2
Carlyle, W.M.3
-
15
-
-
0003438602
-
-
Prentice-Hall, New Jersey
-
Pinedo, M., Scheduling: Theory, Algorithms, and Systems, 2nd edition, 2002 (Prentice-Hall, New Jersey).
-
(2002)
Scheduling: Theory, Algorithms, and Systems, 2nd Edition
-
-
Pinedo, M.1
-
16
-
-
0033079535
-
A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
-
Pinedo, M.L. and Singer, M., A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Naval Res. Logist., 1999, 46, 1-17.
-
(1999)
Naval Res. Logist.
, vol.46
, pp. 1-17
-
-
Pinedo, M.L.1
Singer, M.2
-
17
-
-
0029341463
-
The use of upstream and downstream information in scheduling semi-conductor batch operations
-
Robinson, J.K., Fowler, J.W. and Bard, J.F., The use of upstream and downstream information in scheduling semi-conductor batch operations. Int. J. Prod. Res., 1995, 33, 1849-1869.
-
(1995)
Int. J. Prod. Res.
, vol.33
, pp. 1849-1869
-
-
Robinson, J.K.1
Fowler, J.W.2
Bard, J.F.3
-
18
-
-
84952240555
-
A review of production planning and scheduling models in the semi-conductor industry. Part I: System characteristics, performance evaluation, and production planning
-
Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semi-conductor industry. Part I: System characteristics, performance evaluation, and production planning. IIE Trans.: Sched. Logist., 1992, 24, 47-60.
-
(1992)
IIE Trans.: Sched. Logist.
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
19
-
-
0023399009
-
Priority rules for job shops with weighted tardiness cost
-
Vepsalainen, A. and Morton, T., Priority rules for job shops with weighted tardiness cost. Manage. Sci., 1987, 33, 1035-1047.
-
(1987)
Manage. Sci.
, vol.33
, pp. 1035-1047
-
-
Vepsalainen, A.1
Morton, T.2
-
20
-
-
0027648685
-
An improved methodology for real-time production decisions at batch-process work stations
-
Weng, W.W. and Leachman, R.C., An improved methodology for real-time production decisions at batch-process work stations. IEEE Trans. Semi-cond. Manuf., 1993, 6, 219-225.
-
(1993)
IEEE Trans. Semi-cond. Manuf.
, vol.6
, pp. 219-225
-
-
Weng, W.W.1
Leachman, R.C.2
-
21
-
-
27944431785
-
-
Wright Williams & Kelly, California
-
Wright Williams & Kelly, Factory Explorer Version 2.7 User's Guide, Wright Williams & Kelly, California, 2000.
-
(2000)
Factory Explorer Version 2.7 User's Guide
-
-
|