메뉴 건너뛰기




Volumn 49, Issue 3, 2005, Pages 363-380

A distributed shifting bottleneck heuristic for complex job shops

Author keywords

Complex job shops; Computational experiments; Distributed scheduling; Hierarchical production control; Shifting bottleneck heuristic

Indexed keywords

COMPUTATIONAL METHODS; COMPUTER SIMULATION; HEURISTIC METHODS; PRODUCTION CONTROL; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 26444453872     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2005.06.004     Document Type: Article
Times cited : (68)

References (26)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • J. Adams, E. Balas, and D. Zawack The shifting bottleneck procedure for job shop scheduling Management Science 34 1988 391 401
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 3
    • 0242269826 scopus 로고    scopus 로고
    • Measures of subproblem criticality in decomposition algorithms for shop scheduling
    • H. Aytuk, K. Kempf, and R. Uzsoy Measures of subproblem criticality in decomposition algorithms for shop scheduling International Journal of Production Research 41 5 2002 865 882
    • (2002) International Journal of Production Research , vol.41 , Issue.5 , pp. 865-882
    • Aytuk, H.1    Kempf, K.2    Uzsoy, R.3
  • 4
    • 0034288107 scopus 로고    scopus 로고
    • Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
    • P. Brandimarte, M. Rigodanza, and L. Roero Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure IIE Transactions 32 2000 921 929
    • (2000) IIE Transactions , vol.32 , pp. 921-929
    • Brandimarte, P.1    Rigodanza, M.2    Roero, L.3
  • 5
    • 0031542280 scopus 로고    scopus 로고
    • A computational study of shifting bottleneck procedures for shop scheduling problems
    • E. Demirkol, S. Mehta, and R. Uzsoy A computational study of shifting bottleneck procedures for shop scheduling problems Journal of Heuristics 3 1997 111 137
    • (1997) Journal of Heuristics , vol.3 , pp. 111-137
    • Demirkol, E.1    Mehta, S.2    Uzsoy, R.3
  • 6
    • 0000332876 scopus 로고    scopus 로고
    • Decomposition methods for reentrant flow shops with sequence dependent setup-times
    • E. Demirkol, and R. Uzsoy Decomposition methods for reentrant flow shops with sequence dependent setup-times Journal of Scheduling 3 2000 155 177
    • (2000) Journal of Scheduling , vol.3 , pp. 155-177
    • Demirkol, E.1    Uzsoy, R.2
  • 10
    • 0036927906 scopus 로고    scopus 로고
    • A finite-capacity beam-search-algorithm for pro-duction dche-duling in semiconductor manufacturing
    • E. Yücesan C.-H. Chen J.L. Snowdon J.M. Charnes
    • I. Habenicht, and L. Mönch A finite-capacity beam-search-algorithm for pro-duction dche-duling in semiconductor manufacturing E. Yücesan C.-H. Chen J.L. Snowdon J.M. Charnes Proceedings of the 2002 Winter Simulation Conference 2002 1406 1413
    • (2002) Proceedings of the 2002 Winter Simulation Conference , pp. 1406-1413
    • Habenicht, I.1    Mönch, L.2
  • 11
    • 77957077792 scopus 로고
    • A pseudopolynomial time algorithm for sequencing jobs to minimize total weighted tardiness
    • E.L. Lawler A pseudopolynomial time algorithm for sequencing jobs to minimize total weighted tardiness Annals of Discrete Mathematics 1 1977 331 342
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.L.1
  • 12
    • 0042622980 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
    • Mason, S. J., Fowler J. W., & Carlyle, W. M. (2002). A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5(3), 247-262.
    • (2002) Journal of Scheduling , vol.5 , Issue.3 , pp. 247-262
    • Mason, S.J.1    Fowler, J.W.2    Carlyle, W.M.3
  • 14
    • 26444557625 scopus 로고    scopus 로고
    • Shifting-Bottleneck-Heuristik für komplexe Produktionssysteme: Softwaretechnische Realisierung und Leistungsbewertung
    • Proceedings Multi-Konferenz Wirtschaftsinformatik, Teilkonferenz Quantitative Methoden in ERP und SCM
    • Mönch, L., & Rose, O. (2004). Shifting-Bottleneck-Heuristik für komplexe Produktionssysteme: Softwaretechnische Realisierung und Leistungsbewertung. In: Proceedings Multi-Konferenz Wirtschaftsinformatik, Teilkonferenz Quantitative Methoden in ERP und SCM, DSOR Contributions to Information Systems 2 (pp.145-159).
    • (2004) DSOR Contributions to Information Systems , vol.2 , pp. 145-159
    • Mönch, L.1    Rose, O.2
  • 16
    • 84948978492 scopus 로고    scopus 로고
    • FABMAS-An agent-based system for production control of semiconductor manufacturing processes
    • Proceedings First International Conference on Industrial Application of Holonic and Multi-agent-Systems (HoloMas 2003) Berlin: Springer
    • Mönch, L., Stehli, M., Zimmermann, J. (2003b). FABMAS-An agent-based system for production control of semiconductor manufacturing processes. In: Proceedings First International Conference on Industrial Application of Holonic and Multi-Agent-Systems (HoloMas 2003), LNAI 2744 (pp. 258-267). Berlin: Springer.
    • (2003) LNAI , vol.2744 , pp. 258-267
    • Mönch, L.1    Stehli, M.2    Zimmermann, J.3
  • 19
    • 0033079535 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • M. Pinedo, and A. Singer A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop Naval Research Logistics 46 1999 1 17
    • (1999) Naval Research Logistics , vol.46 , pp. 1-17
    • Pinedo, M.1    Singer, A.2
  • 22
    • 0000634430 scopus 로고
    • Hierarchical real-time integrated scheduling of a semiconductor fabrication facility
    • N. Srivatsan, S.X. Bai, and S.B. Gershwin Hierarchical real-time integrated scheduling of a semiconductor fabrication facility Control and Dynamic Systems 61 1994 197 241
    • (1994) Control and Dynamic Systems , vol.61 , pp. 197-241
    • Srivatsan, N.1    Bai, S.X.2    Gershwin, S.B.3
  • 23
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation and produc-tion planning
    • R. Uzsoy, C.-Y. Lee, and L.A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry, part I: system characteristics, performance evaluation and produc-tion planning IIE Transactions on Scheduling and Logistics 24 1992 47 61
    • (1992) IIE Transactions on Scheduling and Logistics , vol.24 , pp. 47-61
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 24
    • 0035331868 scopus 로고    scopus 로고
    • A model predictive control approach for real-time optimization of reentrant manufacturing lines
    • F.D. Vargas-Villamil, and D.E. Rivera A model predictive control approach for real-time optimization of reentrant manufacturing lines Computers in Industry 45 2001 45 57
    • (2001) Computers in Industry , vol.45 , pp. 45-57
    • Vargas-Villamil, F.D.1    Rivera, D.E.2
  • 26
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • A.P.J. Vepsalainen, and T.E. Morton Priority rules for job shops with weighted tardiness costs Management Science 33 8 1987 1035 1047
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.