메뉴 건너뛰기




Volumn 29, Issue 1, 2011, Pages 66-77

Application of geographic information systems in construction safety planning

Author keywords

4D; Construction management; Construction safety; GIS

Indexed keywords

2D DRAWING; 3D MODELS; 4D; BUILDING INFORMATION MODELLING; BUILDING MODEL; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROCESS; CONSTRUCTION SAFETY; EXECUTION SEQUENCES; GEOSPATIAL ANALYSIS; GIS; POTENTIAL BENEFITS; RESEARCH AREAS; REVIEW PROCESS; SAFETY DATABASE; SAFETY INFORMATION; SAFETY MEASURES; SAFETY PLANNING; SINGLE PLATFORM;

EID: 78049300426     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2010.01.007     Document Type: Article
Times cited : (156)

References (38)
  • 2
    • 78049301423 scopus 로고    scopus 로고
    • ArcGIS Version 9 Introduction Part I & II, Environmental Systems and Research Institute, N.Y. Street, Redlands, CA.
    • ArcGIS Version 9 Introduction Part I & II, 2004. Environmental Systems and Research Institute, N.Y. Street, Redlands, CA.
    • (2004)
  • 3
    • 50249094988 scopus 로고    scopus 로고
    • Potential of GIS to find solutions to space related problems in construction industry. In: Proceedings of World Academy of Science, Engineering and Technology, 14-16 December, Bangkok, Thailand
    • Bansal, V.K., 2007. Potential of GIS to find solutions to space related problems in construction industry. In: Proceedings of World Academy of Science, Engineering and Technology, 14-16 December, Bangkok, Thailand, vol. 26, pp. 307-310.
    • (2007) , vol.26 , pp. 307-310
    • Bansal, V.K.1
  • 4
    • 33846850077 scopus 로고    scopus 로고
    • Potential of geographic information systems in building cost estimation and visualisation
    • Bansal V.K., Pal M. Potential of geographic information systems in building cost estimation and visualisation. Automat. Constr. 2007, 16(3):311-322.
    • (2007) Automat. Constr. , vol.16 , Issue.3 , pp. 311-322
    • Bansal, V.K.1    Pal, M.2
  • 5
    • 45749120776 scopus 로고    scopus 로고
    • Generating, evaluating, and visualizing construction schedule with Geographic Information Systems
    • Bansal V.K., Pal M. Generating, evaluating, and visualizing construction schedule with Geographic Information Systems. J. Comput. Civ. Eng. 2008, 22(4):233-242.
    • (2008) J. Comput. Civ. Eng. , vol.22 , Issue.4 , pp. 233-242
    • Bansal, V.K.1    Pal, M.2
  • 6
    • 67349093494 scopus 로고    scopus 로고
    • Construction schedule review in GIS with a navigable 3D animation of project activities
    • Bansal V.K., Pal M. Construction schedule review in GIS with a navigable 3D animation of project activities. Int. J. Proj. Manage. 2009, 27(5):532-542.
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.5 , pp. 532-542
    • Bansal, V.K.1    Pal, M.2
  • 7
    • 84993082540 scopus 로고    scopus 로고
    • Extended GIS for construction engineering by adding direct sunlight visualisations on buildings
    • Bansal V.K., Pal M. Extended GIS for construction engineering by adding direct sunlight visualisations on buildings. Constr. Innov. 2009, 9(4):406-419.
    • (2009) Constr. Innov. , vol.9 , Issue.4 , pp. 406-419
    • Bansal, V.K.1    Pal, M.2
  • 8
    • 0035255381 scopus 로고    scopus 로고
    • An algorithm for the implementation of safety improvement programs
    • Cagno E., Giulio A.D., Trucco P. An algorithm for the implementation of safety improvement programs. Safety Sci. 2001, 37:59-75.
    • (2001) Safety Sci. , vol.37 , pp. 59-75
    • Cagno, E.1    Giulio, A.D.2    Trucco, P.3
  • 9
    • 84993029182 scopus 로고    scopus 로고
    • 4DCAD-Safety: visualizing project scheduling and safety planning
    • Chantawit D., Hadikusumo B.H.W., Charoenngam C. 4DCAD-Safety: visualizing project scheduling and safety planning. Constr. Innov. 2005, 5:99-114.
    • (2005) Constr. Innov. , vol.5 , pp. 99-114
    • Chantawit, D.1    Hadikusumo, B.H.W.2    Charoenngam, C.3
  • 10
    • 5244248406 scopus 로고    scopus 로고
    • ArcSite: enhanced GIS for construction site layout
    • Cheng M.Y., O'Connor J.T. ArcSite: enhanced GIS for construction site layout. J. Constr. Eng. Manage. 1996, 122(4):329-336.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 329-336
    • Cheng, M.Y.1    O'Connor, J.T.2
  • 11
    • 0035392411 scopus 로고    scopus 로고
    • GIS-Based cost estimate integrated with material layout planning
    • Cheng M.Y., Yang C.Y. GIS-Based cost estimate integrated with material layout planning. J. Constr. Eng. Manage. 2001, 127(4):291-299.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 291-299
    • Cheng, M.Y.1    Yang, C.Y.2
  • 12
    • 35348965638 scopus 로고    scopus 로고
    • The nature of safety culture: a survey of the state-of-the-art
    • Choudhry R.M., Fang D., Mohamed S. The nature of safety culture: a survey of the state-of-the-art. Safety Sci. 2007, 45:993-1012.
    • (2007) Safety Sci. , vol.45 , pp. 993-1012
    • Choudhry, R.M.1    Fang, D.2    Mohamed, S.3
  • 13
    • 16244390855 scopus 로고    scopus 로고
    • Behavior change versus culture change: divergent approaches to managing workplace safety
    • Dejoy D.M. Behavior change versus culture change: divergent approaches to managing workplace safety. Safety Sci. 2005, 43:105-129.
    • (2005) Safety Sci. , vol.43 , pp. 105-129
    • Dejoy, D.M.1
  • 14
    • 78049233042 scopus 로고    scopus 로고
    • An approach for representing complex 3D objects in GIS applied to 3D properties. Thesis for Master of Geomatics, Department of Technology and Built Environment, University of Gävle, Sweden.
    • Ekberg, F., 2007. An approach for representing complex 3D objects in GIS applied to 3D properties. Thesis for Master of Geomatics, Department of Technology and Built Environment, University of Gävle, Sweden.
    • (2007)
    • Ekberg, F.1
  • 15
    • 78049258572 scopus 로고    scopus 로고
    • ESRI, ArcGIS Solutions for Civil Engineering. (accessed 15.05.07).
    • ESRI, 2007. ArcGIS Solutions for Civil Engineering. (accessed 15.05.07). http://www.esri.com/library/brochures/pdfs/arcgis-civil-engineering.pdf.
    • (2007)
  • 16
    • 0032593172 scopus 로고    scopus 로고
    • Addressing construction worker safety in the design phase-designing for construction worker safety
    • Gambatese J., Hinze J. Addressing construction worker safety in the design phase-designing for construction worker safety. Autom. Constr. 1999, 8:643-649.
    • (1999) Autom. Constr. , vol.8 , pp. 643-649
    • Gambatese, J.1    Hinze, J.2
  • 17
    • 0034841245 scopus 로고    scopus 로고
    • Safety climate factors, group differences and safety behavior in road construction
    • Glendon A.I., Litherland D.K. Safety climate factors, group differences and safety behavior in road construction. Safety Sci. 2001, 39:157-188.
    • (2001) Safety Sci. , vol.39 , pp. 157-188
    • Glendon, A.I.1    Litherland, D.K.2
  • 18
    • 0036680235 scopus 로고    scopus 로고
    • Integration of virtually real construction model and design-for-safety-process database
    • Hadikusumo B.H.W., Rowlinson S. Integration of virtually real construction model and design-for-safety-process database. Autom. Constr. 2002, 11:501-509.
    • (2002) Autom. Constr. , vol.11 , pp. 501-509
    • Hadikusumo, B.H.W.1    Rowlinson, S.2
  • 19
    • 13944251751 scopus 로고    scopus 로고
    • Capturing safety knowledge using design-for-safety-process tool
    • Hadikusumo B.H.W., Rowlinson S. Capturing safety knowledge using design-for-safety-process tool. J. Constr. Eng. Manage. 2003, 130(2):281-289.
    • (2003) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 281-289
    • Hadikusumo, B.H.W.1    Rowlinson, S.2
  • 20
    • 33749032103 scopus 로고    scopus 로고
    • Exploring the integration of health and safety with pre-construction planning
    • Hare B., Cameron I., Duff A.R. Exploring the integration of health and safety with pre-construction planning. Eng. Constr. Archit. Manage. 2006, 13(5):438-455.
    • (2006) Eng. Constr. Archit. Manage. , vol.13 , Issue.5 , pp. 438-455
    • Hare, B.1    Cameron, I.2    Duff, A.R.3
  • 21
    • 0008483928 scopus 로고
    • Role of designers in construction worker safety
    • Hinze J., Wiegan F. Role of designers in construction worker safety. J. J. Constr. Eng. Manage. 1992, 118(4):677-684.
    • (1992) J. J. Constr. Eng. Manage. , vol.118 , Issue.4 , pp. 677-684
    • Hinze, J.1    Wiegan, F.2
  • 22
    • 13944256610 scopus 로고    scopus 로고
    • Analysis of construction worker fall accidents
    • Huang X., Hinze J. Analysis of construction worker fall accidents. J. Constr. Eng. Manage. 2003, 129(3):262-271.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 262-271
    • Huang, X.1    Hinze, J.2
  • 23
    • 53349153997 scopus 로고    scopus 로고
    • An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management process
    • Isikdag U., Underwood J., Aouad G. An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management process. Adv. Eng. Inform. 2008, 22(4):504-519.
    • (2008) Adv. Eng. Inform. , vol.22 , Issue.4 , pp. 504-519
    • Isikdag, U.1    Underwood, J.2    Aouad, G.3
  • 25
    • 0009493877 scopus 로고    scopus 로고
    • Fall protection analysis for workers on residential roofs
    • Johnson H.M., Singh A., Young R. Fall protection analysis for workers on residential roofs. J. Constr. Eng. Manage. 1998, 124(5):418-428.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.5 , pp. 418-428
    • Johnson, H.M.1    Singh, A.2    Young, R.3
  • 26
    • 0000575151 scopus 로고    scopus 로고
    • Integrating safety and health performance into construction CPM
    • Kartam N.A. Integrating safety and health performance into construction CPM. J. Constr. Eng. Manage. 1997, 123(2):121-126.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 121-126
    • Kartam, N.A.1
  • 27
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • Koo B., Fischer M. Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manage. 2000, 126(4):251-260.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 28
    • 84993035258 scopus 로고    scopus 로고
    • Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry
    • Langford D., Rowlinson S., Sawacha E. Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry. Eng. Constr. Archit. Manage. 2000, 7(2):133-140.
    • (2000) Eng. Constr. Archit. Manage. , vol.7 , Issue.2 , pp. 133-140
    • Langford, D.1    Rowlinson, S.2    Sawacha, E.3
  • 29
    • 13944273770 scopus 로고    scopus 로고
    • Predictive tool for estimating accident risk
    • Lee S., Halpin D.W. Predictive tool for estimating accident risk. J. Constr. Eng. Manage. 2003, 129(4):431-436.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 431-436
    • Lee, S.1    Halpin, D.W.2
  • 30
    • 33747360709 scopus 로고    scopus 로고
    • Construction scheduling and process control using geographic information systems
    • Poku S.E., Arditi D. Construction scheduling and process control using geographic information systems. J. Comp. Civ. Eng. 2006, 20(5):351-360.
    • (2006) J. Comp. Civ. Eng. , vol.20 , Issue.5 , pp. 351-360
    • Poku, S.E.1    Arditi, D.2
  • 31
    • 0032699873 scopus 로고    scopus 로고
    • Safe operation as a social construct
    • Rochlin G.I. Safe operation as a social construct. Ergonomics 1999, 42(11):1549-1560.
    • (1999) Ergonomics , vol.42 , Issue.11 , pp. 1549-1560
    • Rochlin, G.I.1
  • 32
    • 1842842991 scopus 로고    scopus 로고
    • Safety and production: an integrated planning and control model
    • Saurin T.A., Formoso C.T., Guimaraes L.B.M. Safety and production: an integrated planning and control model. Constr. Manage. Econom. 2004, 22(2):159-169.
    • (2004) Constr. Manage. Econom. , vol.22 , Issue.2 , pp. 159-169
    • Saurin, T.A.1    Formoso, C.T.2    Guimaraes, L.B.M.3
  • 33
    • 21044443008 scopus 로고    scopus 로고
    • Analysis of a safety planning and control model from the human error perspective
    • Saurin T.A., Formoso C.T., Cambraia F.B. Analysis of a safety planning and control model from the human error perspective. Eng. Constr. Archit. Manage. 2005, 12(3):283-298.
    • (2005) Eng. Constr. Archit. Manage. , vol.12 , Issue.3 , pp. 283-298
    • Saurin, T.A.1    Formoso, C.T.2    Cambraia, F.B.3
  • 34
    • 78049286068 scopus 로고    scopus 로고
    • 3D GIS: a technology whose time has come. Earth Observation Magazine, November 16-19.
    • Smith, G., Friedman, J., 2004. 3D GIS: a technology whose time has come. Earth Observation Magazine, November 16-19.
    • (2004)
    • Smith, G.1    Friedman, J.2
  • 35
    • 0035391255 scopus 로고    scopus 로고
    • Development of causal model of construction accident causation
    • Suraji A., Duff A.R., Peckitt S.J. Development of causal model of construction accident causation. J. Constr. Eng. Manage. 2001, 127(4):337-344.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 337-344
    • Suraji, A.1    Duff, A.R.2    Peckitt, S.J.3
  • 36
    • 0036568542 scopus 로고    scopus 로고
    • Non-structural fuzzy decision support systems for the evaluation of construction safety management systems
    • Tam C.M., Tong T.K.L., Chiu G.C.W., Fung I.W.H. Non-structural fuzzy decision support systems for the evaluation of construction safety management systems. Int. J. Proj. Manage. 2002, 20:303-313.
    • (2002) Int. J. Proj. Manage. , vol.20 , pp. 303-313
    • Tam, C.M.1    Tong, T.K.L.2    Chiu, G.C.W.3    Fung, I.W.H.4
  • 37
    • 45749131570 scopus 로고
    • Routing large vehicles on industrial construction site
    • Varghese K., O'Connor J.T. Routing large vehicles on industrial construction site. J. Constr. Eng. Manage. 1995, 121(1):1-12.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 1-12
    • Varghese, K.1    O'Connor, J.T.2
  • 38
    • 33646753383 scopus 로고    scopus 로고
    • Scheduling-based risk estimation and safety planning for construction projects
    • Yi K.J., Langford D. Scheduling-based risk estimation and safety planning for construction projects. J. Constr. Eng. Manage. 2006, 132(6):626-635.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.6 , pp. 626-635
    • Yi, K.J.1    Langford, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.