메뉴 건너뛰기




Volumn , Issue , 2012, Pages

Intelligent BIM-based construction scheduling using discrete event simulation

Author keywords

[No Author keywords available]

Indexed keywords

BILL OF QUANTITIES; BUILDING INFORMATION MODEL - BIM; CONSTRUCTION ACTIVITIES; CONSTRUCTION SCHEDULING; DELIVERY DATES; EFFICIENT SPECIFICATIONS; ERROR PRONES; GERMAN FEDERAL MINISTRY OF EDUCATION AND RESEARCH; INPUT DATAS; MEFISTO; PLANNING DATA; SIMULATION APPROACH; SMALL VARIATIONS; SPECIFICATION PROCESS;

EID: 84874676470     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2012.6465232     Document Type: Conference Paper
Times cited : (39)

References (16)
  • 2
    • 61849106441 scopus 로고    scopus 로고
    • SECOM Co., Ltd. / VTT Building and Transport. Accessed May 23, 2012
    • Adachi, Y. 2002. "Overview of Partial Model Query Language - VTT-TEC-ADA-12." SECOM Co., Ltd. / VTT Building and Transport. Accessed May 23, 2012. http://cic.vtt.fi/projects/ifcsvr/tec/VTT-TECADA-12.pdf.
    • (2002) Overview of Partial Model Query Language - VTT-TEC-ADA-12
    • Adachi, Y.1
  • 3
    • 57549107496 scopus 로고    scopus 로고
    • Specification and implementation of directional operators in a 3D spatial query language for building information models
    • Borrmann, A., and E. Rank. 2009. "Specification and implementation of directional operators in a 3D spatial query language for building information models." Advanced Engineering Informatics 23 (1): 32-44.
    • (2009) Advanced Engineering Informatics , vol.23 , Issue.1 , pp. 32-44
    • Borrmann, A.1    Rank, E.2
  • 5
    • 45749088540 scopus 로고    scopus 로고
    • Integration of construction process documentation into Building Information Modeling
    • Goedert, J. D., and P. Meadati. 2008. "Integration of construction process documentation into Building Information Modeling." Journal of Construction Engineering and Management 134 (7): 509-516.
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.7 , pp. 509-516
    • Goedert, J.D.1    Meadati, P.2
  • 6
    • 77952133475 scopus 로고    scopus 로고
    • An Introduction to Building Information Modeling (BIM)
    • Accessed May 23, 2012
    • Smith, D. 2007. "An Introduction to Building Information Modeling (BIM)." Journal of Building Information Modeling. Accessed May 23, 2012. http://www.wbdg.org/pdfs/jbim-fall07.pdf.
    • (2007) Journal of Building Information Modeling
    • Smith, D.1
  • 7
    • 1642440732 scopus 로고    scopus 로고
    • Validating complex construction simulation models using 3D visualization
    • DOI 10.1080/02329290290028507, PII YEA6LW6VY0YB4WKN
    • Kamat, V. R., and J. C. Martinez. 2003. "Validating complex construction simulation models using 3D visualization." Systems Analysis Modelling Simulation 43 (4): 455-467. (Pubitemid 44112320)
    • (2003) Systems Analysis Modelling Simulation , vol.43 , Issue.4 , pp. 455-467
    • Kamat, V.R.1    Martinez, J.C.2
  • 10
    • 80053611090 scopus 로고    scopus 로고
    • A distributed multi-model-based management information system for simulation and decision making on construction projects
    • Scherer, R., and S.-E. Schapke. 2011. "A distributed multi-model-based management information system for simulation and decision making on construction projects." Advanced Engineering Informatics 25 (4): 582-599.
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.4 , pp. 582-599
    • Scherer, R.1    Schapke, S.-E.2
  • 15
    • 77957282618 scopus 로고    scopus 로고
    • Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation
    • Wu, I.-C., A. Borrmann, U. Beißert, M. König, and E. Rank. 2010. "Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation." Advanced Engineering Informatics 24 (4): 379-388.
    • (2010) Advanced Engineering Informatics , vol.24 , Issue.4 , pp. 379-388
    • Wu, I.-C.1    Borrmann, A.2    Beißert, U.3    König, M.4    Rank, E.5
  • 16
    • 79551684087 scopus 로고    scopus 로고
    • BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
    • Zhang, J.P., and Z.Z. Hu 2010. "BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies." Automation in Construction 20 (2): 155-166.
    • (2010) Automation in Construction , vol.20 , Issue.2 , pp. 155-166
    • Zhang, J.P.1    Hu, Z.Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.