메뉴 건너뛰기




Volumn 30, Issue , 2013, Pages 136-143

Onsite 3D marking for construction activity tracking

Author keywords

Activity tracking; Data fusion; Experimental; Field implementation; Indoor construction; Material tracking; Performance; Piping; Progress estimation; UWB

Indexed keywords

APPLICATION PROGRAMS; CONSTRUCTION INDUSTRY; DATA FUSION; MATLAB; WELDING;

EID: 84870770628     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.11.027     Document Type: Article
Times cited : (56)

References (34)
  • 1
    • 18744383106 scopus 로고    scopus 로고
    • Feasibility of automated monitoring of lifting equipment in support of project control
    • R. Sacks, R. Navon, I. Brodetskaia, A. Shapira, Feasibility of automated monitoring of lifting equipment in support of project control, Journal of Construction Engineering and Management 131 (5) (2005) 604-614, http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:5(604).
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.5 , pp. 604-614
    • Sacks, R.1    Navon, R.2    Brodetskaia, I.3    Shapira, A.4
  • 2
    • 42949096913 scopus 로고    scopus 로고
    • Automated retrieval of project three-dimensional CAD objects in range point clouds to support automated dimensional QA/QC
    • F.N. Bosche, C.T. Haas, Automated retrieval of project three-dimensional CAD objects in range point clouds to support automated dimensional QA/QC, The Electronic Journal of Information Technology in Construction 13 (2008) 71-85.
    • (2008) The Electronic Journal of Information Technology in Construction , vol.13 , pp. 71-85
    • Bosche, F.N.1    Haas, C.T.2
  • 3
    • 32944467411 scopus 로고    scopus 로고
    • Interpretation of automatically monitored lifting equipment data for project control
    • R. Sacks, R. Navon, I. Brodetskaia, Interpretation of automatically monitored lifting equipment data for project control, Journal of Computing in Civil Engineering 20 (2) (2006) 111-120, http://dx.doi.org/10.1061/(ASCE)0887- 3801(2006)20:2(111).
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.2 , pp. 111-120
    • Sacks, R.1    Navon, R.2    Brodetskaia, I.3
  • 4
    • 0036028115 scopus 로고    scopus 로고
    • Integrating barcode and GIS for monitoring construction progress
    • M.Y. Cheng, J.C. Chen, Integrating barcode and GIS for monitoring construction progress, Automation in Construction 11 (1) (2002) 23-33, http://dx.doi.org/10.1016/S0926-5805(01)00043-7.
    • (2002) Automation in Construction , vol.11 , Issue.1 , pp. 23-33
    • Cheng, M.Y.1    Chen, J.C.2
  • 5
    • 33845728532 scopus 로고    scopus 로고
    • Tracking components and maintenance history within a facility utilizing radio frequency identification technology
    • E. Ergen, B. Akinci, B. East, J. Kirby, Tracking components and maintenance history within a facility utilizing radio frequency identification technology, Journal of Computing in Civil Engineering 21 (1) (2007) 11-20, http://dx.doi.org/10.1061/(ASCE)0887-3801(2007)21:1(11).
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.1 , pp. 11-20
    • Ergen, E.1    Akinci, B.2    East, B.3    Kirby, J.4
  • 6
    • 73349132668 scopus 로고    scopus 로고
    • Effective monitoring of the concrete pouring operation in an RFID-based environment
    • S. Moon, B. Yang, Effective monitoring of the concrete pouring operation in an RFID-based environment, Journal of Computing in Civil Engineering 24 (1) (2010) 108-116, http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000004.
    • (2010) Journal of Computing in Civil Engineering , vol.24 , Issue.1 , pp. 108-116
    • Moon, S.1    Yang, B.2
  • 8
    • 29144515805 scopus 로고    scopus 로고
    • Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
    • J. Song, C.T. Haas, C. Caldas, E. Ergen, B. Akinci, Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects, Automation in Construction 15 (2) (2006) 166-177, http://dx.doi.org/ 10.1016/j.autcon.2005.03.001.
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 166-177
    • Song, J.1    Haas, C.T.2    Caldas, C.3    Ergen, E.4    Akinci, B.5
  • 9
    • 35348874797 scopus 로고    scopus 로고
    • Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
    • J. Teizer, C.H. Caldas, C.T. Haas, Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources, Journal of Construction Engineering and Management 133 (11) (2007) 880-888, http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:11(880).
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.11 , pp. 880-888
    • Teizer, J.1    Caldas, C.H.2    Haas, C.T.3
  • 12
    • 79960638196 scopus 로고    scopus 로고
    • Integrating automated data acquisition technologies for progress reporting of construction projects
    • S. El-Omari, O. Moselhi, Integrating automated data acquisition technologies for progress reporting of construction projects, Automation in Construction 20 (6) (2011) 699-705, http://dx.doi.org/10.1016/j.autcon.2010.12. 001.
    • (2011) Automation in Construction , vol.20 , Issue.6 , pp. 699-705
    • El-Omari, S.1    Moselhi, O.2
  • 13
    • 70350151227 scopus 로고    scopus 로고
    • Data acquisition from construction sites for tracking purposes
    • S. El-Omari, O. Moselhi, Data acquisition from construction sites for tracking purposes, Engineering Construction and Architectural Management 16 (5) (2009) 490-503, http://dx.doi.org/10.1108/09699980910988384.
    • (2009) Engineering Construction and Architectural Management , vol.16 , Issue.5 , pp. 490-503
    • El-Omari, S.1    Moselhi, O.2
  • 14
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • M. Golparvar-Fard, F. Pea-Mora, C.A. Arboleda, S. Lee, Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs, Journal of Computing in Civil Engineering 23 (6) (2009) 391-404, http://dx.doi.org/10.1061/(ASCE)0887-3801(2009) 23:6(391).
    • (2009) Journal of Computing in Civil Engineering , vol.23 , Issue.6 , pp. 391-404
    • Golparvar-Fard, M.1    Pea-Mora, F.2    Arboleda, C.A.3    Lee, S.4
  • 15
    • 70350154917 scopus 로고    scopus 로고
    • D4AR-A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication
    • M. Golparvar-Fard, P.M. Feniosky, S. Savarese, D4AR-A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication, The Electronic Journal of Information Technology in Construction 14 (2009) 129-153.
    • (2009) The Electronic Journal of Information Technology in Construction , vol.14 , pp. 129-153
    • Golparvar-Fard, M.1    Feniosky, P.M.2    Savarese, S.3
  • 16
    • 84859557026 scopus 로고    scopus 로고
    • Automated trajectory and path planning analysis based on ultra wideband data
    • T. Cheng, U. Mantripragada, J. Teizer, P.A. Vela, Automated trajectory and path planning analysis based on ultra wideband data, Journal of Computing in Civil Engineering 26 (2) (2012) 151-160, http://dx.doi.org/10.1061/(ASCE)CP. 1943-5487.0000115.
    • (2012) Journal of Computing in Civil Engineering , vol.26 , Issue.2 , pp. 151-160
    • Cheng, T.1    Mantripragada, U.2    Teizer, J.3    Vela, P.A.4
  • 17
    • 80053648019 scopus 로고    scopus 로고
    • Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
    • T. Cheng, M. Venugopal, J. Teizer, P.A. Vela, Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments, Automation in Construction 20 (8) (2011) 1173-1184, http://dx.doi.org/10.1016/j.autcon.2011.05.001.
    • (2011) Automation in Construction , vol.20 , Issue.8 , pp. 1173-1184
    • Cheng, T.1    Venugopal, M.2    Teizer, J.3    Vela, P.A.4
  • 18
    • 70449708995 scopus 로고    scopus 로고
    • Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
    • Y.K. Cho, J.H. Youn, D. Martinez, Error modeling for an untethered ultra-wideband system for construction indoor asset tracking, Automation in Construction 19 (1) (2010) 43-54, http://dx.doi.org/10.1016/j.autcon.2009.08. 001.
    • (2010) Automation in Construction , vol.19 , Issue.1 , pp. 43-54
    • Cho, Y.K.1    Youn, J.H.2    Martinez, D.3
  • 23
    • 79957489773 scopus 로고    scopus 로고
    • Static and dynamic performance evaluation of a commercially-available ultrawideband tracking system
    • K.S. Saidi, J. Teizer, M. Franaszek, A.M. Lytle, Static and dynamic performance evaluation of a commercially-available ultrawideband tracking system, Automation in Construction 20 (5) (2011) 519-530, http://dx.doi.org/10. 1016/j.autcon.2010.11.018.
    • (2011) Automation in Construction , vol.20 , Issue.5 , pp. 519-530
    • Saidi, K.S.1    Teizer, J.2    Franaszek, M.3    Lytle, A.M.4
  • 26
    • 80955177609 scopus 로고    scopus 로고
    • A performance evaluation of vision and radio frequency tracking methods for interacting workforce
    • J. Yang, T. Cheng, J. Teizer, P.A. Vela, Z.K. Shi, A performance evaluation of vision and radio frequency tracking methods for interacting workforce, Advanced Engineering Informatics 25 (4) (2011) 736-747, http://dx.doi.org/10.1016/j.aei.2011.04.001.
    • (2011) Advanced Engineering Informatics , vol.25 , Issue.4 , pp. 736-747
    • Yang, J.1    Cheng, T.2    Teizer, J.3    Vela, P.A.4    Shi, Z.K.5
  • 27
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction
    • F. Bosché, Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction, Advanced Engineering Informatics 24 (1) (2010) 107-118, http://dx.doi.org/10.1016/j.aei.2009.08.006.
    • (2010) Advanced Engineering Informatics , vol.24 , Issue.1 , pp. 107-118
    • Bosché, F.1
  • 28
    • 80053148143 scopus 로고    scopus 로고
    • The effective acquisition and processing of 3D photogrammetric data from digital photogrammetry for construction progress measurement
    • C. Kim, H. Son, C. Kym, The effective acquisition and processing of 3D photogrammetric data from digital photogrammetry for construction progress measurement, in: 2011 ASCE International Workshop on Computing in Civil Engineering, Miami, FL, 2011, pp. 178-185, http://dx.doi.org/10.1061/41182 (416)22.
    • 2011 ASCE International Workshop on Computing in Civil Engineering, Miami, FL, 2011 , pp. 178-185
    • Kim, C.1    Son, H.2    Kym, C.3
  • 29
    • 0347411213 scopus 로고    scopus 로고
    • Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds
    • S. Kwon, F. Bosche, C. Kim, C.T. Haas, K.A. Liapi, Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds, Automation in Construction 13 (1) (2004) 67-81, http://dx.doi.org/10.1016/j. autcon.2003.08.007.
    • (2004) Automation in Construction , vol.13 , Issue.1 , pp. 67-81
    • Kwon, S.1    Bosche, F.2    Kim, C.3    Haas, C.T.4    Liapi, K.A.5
  • 32
    • 78149285142 scopus 로고    scopus 로고
    • Multisensor data fusion for on-site materials tracking in construction
    • S.N. Razavi, C.T. Haas, Multisensor data fusion for on-site materials tracking in construction, Automation in Construction 19 (8) (2010) 1037-1046, http://dx.doi.org/10.1016/j.autcon.2010.07.017.
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 1037-1046
    • Razavi, S.N.1    Haas, C.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.