메뉴 건너뛰기




Volumn 35, Issue , 2013, Pages 44-52

4D CAD model updating using image processing-based construction progress monitoring

Author keywords

3D CAD; 4D CAD; Cable stayed bridge; Image processing; Progress monitoring Project scheduling

Indexed keywords

3-D CADS; CABLE-STAYED BRIDGE CONSTRUCTIONS; COMPUTER AIDED DESIGN MODELS; CONSTRUCTION PROGRESS; CONSTRUCTION PROJECTS; MANAGERIAL DECISION MAKING; PROCESSING APPROACH; PROJECT SCHEDULING;

EID: 84884502256     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2013.03.005     Document Type: Article
Times cited : (113)

References (19)
  • 2
  • 3
    • 84860171999 scopus 로고    scopus 로고
    • Reliability-based hybrid data fusion method for adaptive location estimation in construction
    • S.N. Razavi, and C.T. Haas Reliability-based hybrid data fusion method for adaptive location estimation in construction Journal of Computing in Civil Engineering 26 1 2012 1 10
    • (2012) Journal of Computing in Civil Engineering , vol.26 , Issue.1 , pp. 1-10
    • Razavi, S.N.1    Haas, C.T.2
  • 4
    • 84859540968 scopus 로고    scopus 로고
    • RFID and CCTV-based material delivery monitoring for cable-stayed bridge construction
    • Y. Ju, C. Kim, and H. Kim RFID and CCTV-based material delivery monitoring for cable-stayed bridge construction Journal of Computing in Civil Engineering 26 2 2012 183 190
    • (2012) Journal of Computing in Civil Engineering , vol.26 , Issue.2 , pp. 183-190
    • Ju, Y.1    Kim, C.2    Kim, H.3
  • 6
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D schedule and 3D sensing technologies
    • Y. Turkan, F. Bosche, C.T. Haas, and R. Haas Automated progress tracking using 4D schedule and 3D sensing technologies Automation in Construction 22 2012 414 421
    • (2012) Automation in Construction , vol.22 , pp. 414-421
    • Turkan, Y.1    Bosche, F.2    Haas, C.T.3    Haas, R.4
  • 7
    • 73349118434 scopus 로고    scopus 로고
    • Object recognition in construction site image using 3D CAD-based filtering
    • Y. Wu, H. Kim, C. Kim, and S.H. Han Object recognition in construction site image using 3D CAD-based filtering Journal of Computing in Civil Engineering 24 1 2010 56 64
    • (2010) Journal of Computing in Civil Engineering , vol.24 , Issue.1 , pp. 56-64
    • Wu, Y.1    Kim, H.2    Kim, C.3    Han, S.H.4
  • 8
    • 79955535622 scopus 로고    scopus 로고
    • Automated object identification using optical video cameras on construction sites
    • S. Chi, and C.H. Caldas Automated object identification using optical video cameras on construction sites Computer-Aided Civil and Infrastructure Engineering 26 5 2011 368 380
    • (2011) Computer-Aided Civil and Infrastructure Engineering , vol.26 , Issue.5 , pp. 368-380
    • Chi, S.1    Caldas, C.H.2
  • 10
    • 77956610448 scopus 로고    scopus 로고
    • Parameter optimization for automated concrete detection in image data
    • Z. Zhu, and I. Brilakis Parameter optimization for automated concrete detection in image data Automation in Construction 19 7 2010 944 953
    • (2010) Automation in Construction , vol.19 , Issue.7 , pp. 944-953
    • Zhu, Z.1    Brilakis, I.2
  • 11
    • 84861110538 scopus 로고    scopus 로고
    • Automated color model-based concrete detection in construction site images using machine learning algorithms
    • H. Son, C. Kim, and C. Kim Automated color model-based concrete detection in construction site images using machine learning algorithms Journal of Computing in Civil Engineering 25 3 2012 421 433
    • (2012) Journal of Computing in Civil Engineering , vol.25 , Issue.3 , pp. 421-433
    • Son, H.1    Kim, C.2    Kim, C.3
  • 13
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
    • Z. Ma, Q. Shen, and J. Zhang Application of 4D for dynamic site layout and management of construction projects Automation in Construction 14 3 2005 369 381 (Pubitemid 40183428)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 14
    • 34248575853 scopus 로고    scopus 로고
    • Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(447)
    • J.H. Kang, S.D. Anderson, and M.J. Clayton Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling Journal of Construction Engineering and Management 133 6 2007 447 461 (Pubitemid 46753484)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 447-461
    • Kang, J.H.1    Anderson, S.D.2    Clayton, M.J.3
  • 15
    • 76549114928 scopus 로고    scopus 로고
    • An evaluation of the applicability of 4D CAD on construction projects
    • A. Mahalingam, R. Kashyap, and C. Mahajan An evaluation of the applicability of 4D CAD on construction projects Automation in Construction 18 2 2010 148 159
    • (2010) Automation in Construction , vol.18 , Issue.2 , pp. 148-159
    • Mahalingam, A.1    Kashyap, R.2    Mahajan, C.3
  • 16
    • 78650330072 scopus 로고    scopus 로고
    • Applicability of 4D CAD in civil engineering construction: Case study of a cable-stayed bridge project
    • C. Kim, H. Kim, T. Park, and M.K. Kim Applicability of 4D CAD in civil engineering construction: case study of a cable-stayed bridge project Journal of Computing in Civil Engineering 25 1 2011 98 107
    • (2011) Journal of Computing in Civil Engineering , vol.25 , Issue.1 , pp. 98-107
    • Kim, C.1    Kim, H.2    Park, T.3    Kim, M.K.4
  • 17
    • 39349114541 scopus 로고    scopus 로고
    • RFID+4D CAD for progress management of structural steel works in high-rise buildings
    • DOI 10.1061/(ASCE)0887-3801(2008)22:2(74)
    • S. Chin, S. Yoon, C. Choi, and C. Cho RFID+4D CAD for progress management of structural steel works in high-rise buildings Journal of Computing in Civil Engineering 22 2 2008 74 89 (Pubitemid 351264006)
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.2 , pp. 74-89
    • Chin, S.1    Yoon, S.2    Choi, C.3    Cho, C.4
  • 18
    • 84855950194 scopus 로고    scopus 로고
    • Integrated sequential as-built and as-planned representation with D4 AR tools in support of decision-making tasks in the AEC/FM industry
    • M. Golparvar-Fard, F. Peña-Mora, and S. Savarese Integrated sequential as-built and as-planned representation with D4 AR tools in support of decision-making tasks in the AEC/FM industry Journal of Construction Engineering and Management 137 12 2011 1099 1116
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.12 , pp. 1099-1116
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Savarese, S.3
  • 19
    • 34250683114 scopus 로고    scopus 로고
    • Using hue, saturation, and value color space for hydraulic excavator idle time analysis
    • DOI 10.1061/(ASCE)0887-3801(2007)21:4(238)
    • J. Zou, and H. Kim Using hue, saturation, and value color space for hydraulic excavator idle time analysis Journal of Computing in Civil Engineering 21 4 2007 238 246 (Pubitemid 46935005)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.4 , pp. 238-246
    • Zou, J.1    Kim, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.