메뉴 건너뛰기




Volumn , Issue , 2007, Pages 648-656

Towards automated retrieval of 3D designed data in 3D sensed data

Author keywords

3D sensed data; 3D 4D designed data; automated comparison; GPS technologies

Indexed keywords

3D SENSED DATA; 3D/4D DESIGNED DATA; AUTOMATED COMPARISON; AUTOMATED CONSTRUCTION; CONSTRUCTION PRODUCTIVITY; CONSTRUCTION PROGRESS; CONTINUOUS ASSESSMENT; GPS TECHNOLOGIES;

EID: 84862977419     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/40937(261)77     Document Type: Conference Paper
Times cited : (8)

References (9)
  • 2
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., and Park, K. (2006). "A formalism for utilization of sensor systems and integrated project models for active construction quality control", Automation in Construction, 15(2), 124-138.
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 3
    • 38649113032 scopus 로고    scopus 로고
    • Investigation of data formats for the integration of 3D sensed and 3D CAD data for improved equipment operation safety
    • Calgary, Alberta, Canada, May 23-26
    • Bosche, F., and Haas, C. T. (2006). "Investigation of Data Formats for the Integration of 3D Sensed and 3D CAD data for Improved Equipment Operation Safety", CSCE 1st International Construction Specialty Conference (ICSC), Calgary, Alberta, Canada, May 23-26.
    • (2006) CSCE 1st International Construction Specialty Conference (ICSC)
    • Bosche, F.1    Haas, C.T.2
  • 5
    • 27144442376 scopus 로고    scopus 로고
    • Technology and process assessment of using ladar and embedded sensing for construction quality control
    • San Diego, CA, USA, April 5-7
    • Gordon, C., and Akinci, B. (2005). "Technology and Process Assessment of Using LADAR and Embedded Sensing for Construction Quality Control ", ASCE Construction Research Congress (CRC), San Diego, CA, USA, April 5-7, 557-561.
    • (2005) ASCE Construction Research Congress (CRC) , pp. 557-561
    • Gordon, C.1    Akinci, B.2
  • 7
    • 33845966046 scopus 로고    scopus 로고
    • Research in automated measurement of project performance indicators
    • Navon, R. (2007). "Research in Automated Measurement of Project Performance Indicators", Automation in Construction, 16(2), 176-188.
    • (2007) Automation in Construction , vol.16 , Issue.2 , pp. 176-188
    • Navon, R.1
  • 9
    • 35348874797 scopus 로고    scopus 로고
    • Real-time three-dimensional modeling for the detection and tracking of construction resources
    • (in press)
    • Teizer, J., Caldas, C. H., and Haas, C. T. (2007). "Real-Time Three-Dimensional Modeling for the Detection and Tracking of Construction Resources", Journal of Construction Engineering and Management, (in press).
    • (2007) Journal of Construction Engineering and Management
    • Teizer, J.1    Caldas, C.H.2    Haas, C.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.