Volumn 17, Issue , 2012, Pages 361-366

Optimizing location of tower cranes on construction sites through GIS and BIM integration

Author keywords

3D visualization; BIM; GIS; Interoperability; Spatial analysis; Tower crane

Indexed keywords

3D MODELS; 3D VISUALIZATION; BIM; BUILDING CONSTRUCTION; BUILDING INFORMATION MODELING; CONSTRUCTION SITES; DEMAND AND SUPPLY; GIS MODELS; INTEGRATED MODELS; LOCATION OPTIMIZATION; OPTIMAL LOCATIONS; OPTIMAL NUMBER; OPTIMUM LOCATION; POTENTIAL CONFLICT; SPATIAL ANALYSIS; SPATIAL DATA; VIRTUAL MODELS; VISUAL MODEL; WORK ZONES;

EID: 84867859668     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (138)

References (42)
  • 1
    • 33746350454 scopus 로고    scopus 로고
    • Integrating 3D visualization and simulation for tower crane operations on construction sites
    • Al-Hussein, M., Athar Niaz, M., Yu, H., and Kim, H. 2006. Integrating 3D visualization and simulation for tower crane operations on construction sites, Automation in Construction, 15(5), 554-562.
    • (2006) Automation in Construction , vol.15 , Issue.5 , pp. 554-562
    • Al-Hussein, M.1    Athar Niaz, M.2    Yu, H.3    Kim, H.4
  • 2
    • 84867890186 scopus 로고    scopus 로고
    • Computerized crane selection for construction projects
    • Association of Researchers in Construction Management
    • Alkass, S., Alhussein, M., and Moselhi, O. 1997. Computerized crane selection for construction projects, Proc. 13th Annual ARCOM Conference, Association of Researchers in Construction Management, 427-436.
    • (1997) Proc. 13th Annual ARCOM Conference , pp. 427-436
    • Alkass, S.1    Alhussein, M.2    Moselhi, O.3
  • 3
    • 0035281570 scopus 로고    scopus 로고
    • Intelli Cranes: An integrated crane type and model selection system
    • André, M., and Sawhney, A. 2001. Intelli Cranes: an integrated crane type and model selection system, Construction Management & Economics, 19(2), 227-237.
    • (2001) Construction Management & Economics , vol.19 , Issue.2 , pp. 227-237
    • André, M.1    Sawhney, A.2
  • 5
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • Bansal, V. K. 2011. Use of GIS and Topology in the Identification and Resolution of Space Conflicts, Journal of Computing in Civil Engineering, 25(2), 159-171.
    • (2011) Journal of Computing in Civil Engineering , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.K.1
  • 6
    • 33846850077 scopus 로고    scopus 로고
    • Potential of geographic information systems in building cost estimation and visualization
    • Bansal, V. K., and Pal, M. 2007. Potential of geographic information systems in building cost estimation and visualization, Automation in Construction, 16(3), 311-322.
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 311-322
    • Bansal, V.K.1    Pal, M.2
  • 7
    • 67349093494 scopus 로고    scopus 로고
    • Construction schedule review in GIS with a navigable 3D animation of project activities
    • Bansal, V. K., and Pal, M. 2009. Construction schedule review in GIS with a navigable 3D animation of project activities, International Journal of Project Management, 27(5), 532-542.
    • (2009) International Journal of Project Management , vol.27 , Issue.5 , pp. 532-542
    • Bansal, V.K.1    Pal, M.2
  • 8
    • 0031843005 scopus 로고    scopus 로고
    • Overcoming the semantic and other barriers to GIS interoperability
    • Bishr, Y. 1998. Overcoming the semantic and other barriers to GIS interoperability, Int. Journal of Geographical Information Science, 12(4), 299-314.
    • (1998) Int. Journal of Geographical Information Science , vol.12 , Issue.4 , pp. 299-314
    • Bishr, Y.1
  • 12
    • 80052866929 scopus 로고    scopus 로고
    • Integrated visualized time control system for repetitive construction projects
    • Elbeltagi, E., and Dawood, M. 2011. Integrated visualized time control system for repetitive construction projects, Automation in Construction, 20(7), 940-953.
    • (2011) Automation in Construction , vol.20 , Issue.7 , pp. 940-953
    • Elbeltagi, E.1    Dawood, M.2
  • 14
    • 2942722370 scopus 로고    scopus 로고
    • Future directions for IFC-based interoperability
    • Special Issue "IFC - Product Models for the AEC Arena", 2003
    • Froese, T. 2003. Future directions for IFC-based interoperability, Journal of Information Technology in Construction (ITcon), Special Issue "IFC - Product Models for the AEC Arena", 8/2003, 231-246.
    • (2003) Journal of Information Technology in Construction (ITcon) , vol.8 , pp. 231-246
    • Froese, T.1
  • 15
    • 78649324741 scopus 로고
    • A model for the selection of the optimum crane for construction sites
    • Furusaka, S., and Gray, C. 1984. A model for the selection of the optimum crane for construction sites, Construction Management and Economics, 2(2), 157-176.
    • (1984) Construction Management and Economics , vol.2 , Issue.2 , pp. 157-176
    • Furusaka, S.1    Gray, C.2
  • 16
    • 42649099606 scopus 로고    scopus 로고
    • Integration of municipal infrastructure asset management processes: Challenges and solutions
    • Halfawy, M. R. 2008. Integration of municipal infrastructure asset management processes: Challenges and solutions, Journal of Computing in Civil Engineering, 22(3), 216-229.
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.3 , pp. 216-229
    • Halfawy, M.R.1
  • 17
    • 53349153997 scopus 로고    scopus 로고
    • An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes
    • Isikdag, U., Underwood, J., and Aouad, G. 2008. An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes, Advanced Engineering Informatics, 22(4), 504-519.
    • (2008) Advanced Engineering Informatics , vol.22 , Issue.4 , pp. 504-519
    • Isikdag, U.1    Underwood, J.2    Aouad, G.3
  • 18
    • 11244354280 scopus 로고    scopus 로고
    • Dynamic analysis of tower cranes
    • Ju, F., and Choo, Y. S. 2005. Dynamic analysis of tower cranes, Journal of engineering mechanics, 131(1), 88-96.
    • (2005) Journal of Engineering Mechanics , vol.131 , Issue.1 , pp. 88-96
    • Ju, F.1    Choo, Y.S.2
  • 20
    • 45749134660 scopus 로고    scopus 로고
    • Computational methods for coordinating multiple construction cranes
    • Kang, S. C., and Miranda, E. 2008. Computational Methods for Coordinating Multiple Construction Cranes, Journal of Computing in Civil Engineering, 22(4), 252-263.
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.4 , pp. 252-263
    • Kang, S.C.1    Miranda, E.2
  • 21
    • 85119987955 scopus 로고    scopus 로고
    • Integration of BIM and GIS: The development of the CityGML GeoBIM extension
    • Berlin, Germany
    • Laat, R., and Berlo, L. 2011. Integration of BIM and GIS: The Development of the CityGML GeoBIM Extension, Advances in 3D Geo-Information Sciences, Berlin, Germany, 211-225.
    • (2011) Advances in 3D Geo-information Sciences , pp. 211-225
    • Laat, R.1    Berlo, L.2
  • 22
    • 0008276852 scopus 로고    scopus 로고
    • Prediction of hoisting time for tower cranes for public housing construction in Hong Kong
    • Leung, A. W. T., and Tam, C. 1999. Prediction of hoisting time for tower cranes for public housing construction in Hong Kong, Construction Management & Economics, 17(3), 305-314.
    • (1999) Construction Management & Economics , vol.17 , Issue.3 , pp. 305-314
    • Leung, A.W.T.1    Tam, C.2
  • 23
    • 0032187321 scopus 로고    scopus 로고
    • Site-level facilities layout using genetic algorithms
    • Li, H., and Love, P. E. D. 1998. Site-level facilities layout using genetic algorithms, Journal of Computing in Civil Engineering, 12(4), 227-231.
    • (1998) Journal of Computing in Civil Engineering , vol.12 , Issue.4 , pp. 227-231
    • Li, H.1    Love, P.E.D.2
  • 26
    • 33644681211 scopus 로고    scopus 로고
    • An ontological engineering approach for integrating CAD and GIS in support of infrastructure management
    • Peachavanish, R., Karimi, H. A., Akinci, B., and Boukamp, F. 2006. An ontological engineering approach for integrating CAD and GIS in support of infrastructure management, Advanced Engineering Informatics, 20(1), 71-88.
    • (2006) Advanced Engineering Informatics , vol.20 , Issue.1 , pp. 71-88
    • Peachavanish, R.1    Karimi, H.A.2    Akinci, B.3    Boukamp, F.4
  • 30
    • 0032070691 scopus 로고    scopus 로고
    • Automation of existing tower cranes: Economic and technological feasibility
    • Rosenfeld, Y., and Shapira, A. 1998. Automation of existing tower cranes: economic and technological feasibility, Automation in Construction, 7(4), 285-298.
    • (1998) Automation in Construction , vol.7 , Issue.4 , pp. 285-298
    • Rosenfeld, Y.1    Shapira, A.2
  • 31
    • 84858303047 scopus 로고    scopus 로고
    • Potential application of GIS to layout of construction temporary facilities
    • Sebt, M. H., Karan, E. P., and Delavar, M. R. 2008. Potential Application of GIS to Layout of Construction Temporary Facilities, International Journal of Civil Engineering, 6(4), 235-245.
    • (2008) International Journal of Civil Engineering , vol.6 , Issue.4 , pp. 235-245
    • Sebt, M.H.1    Karan, E.P.2    Delavar, M.R.3
  • 33
    • 58149216115 scopus 로고    scopus 로고
    • Identification and analysis of factors affecting safety on construction sites with tower cranes
    • Shapira, A., and Lyachin, B. 2009. Identification and analysis of factors affecting safety on construction sites with tower cranes, Journal of Construction Engineering and Management, 135(1), 24-33.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.1 , pp. 24-33
    • Shapira, A.1    Lyachin, B.2
  • 35
    • 62549085613 scopus 로고    scopus 로고
    • AHP-based weighting of factors affecting safety on construction sites with tower cranes
    • Shapira, A., and Simcha, M. 2009a. AHP-based weighting of factors affecting safety on construction sites with tower cranes, Journal of Construction Engineering and Management, 135(4), 307-318.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.4 , pp. 307-318
    • Shapira, A.1    Simcha, M.2
  • 36
    • 70349324677 scopus 로고    scopus 로고
    • Measurement and risk scales of crane-related safety factors on construction sites
    • Shapira, A., and Simcha, M. 2009b. Measurement and risk scales of crane-related safety factors on construction sites, Journal of Construction Engineering and Management, 135(10), 979-989.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.10 , pp. 979-989
    • Shapira, A.1    Simcha, M.2
  • 37
    • 0037647504 scopus 로고    scopus 로고
    • GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
    • Tam, C., and Tong, T. K. L. 2003. GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction, Construction Management & Economics, 21(3), 257-266.
    • (2003) Construction Management & Economics , vol.21 , Issue.3 , pp. 257-266
    • Tam, C.1    Tong, T.K.L.2
  • 39
    • 0030110489 scopus 로고    scopus 로고
    • A computer-based model for optimizing the location of a single tower crane
    • Zhang, P., Harris, F., and Olomolaiye, P. 1996. A computer-based model for optimizing the location of a single tower crane, Building research and information, 24(2), 113-123.
    • (1996) Building Research and Information , vol.24 , Issue.2 , pp. 113-123
    • Zhang, P.1    Harris, F.2    Olomolaiye, P.3
  • 42
    • 13944278488 scopus 로고    scopus 로고
    • Geographic information system-based visual simulation methodology and its application in concrete dam construction processes
    • Zhong, D., Li, J., Zhu, H., and Song, L. 2004. Geographic information system-based visual simulation methodology and its application in concrete dam construction processes, Journal of Construction Engineering and Management, 130(5), 742-750.
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.5 , pp. 742-750
    • Zhong, D.1    Li, J.2    Zhu, H.3    Song, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.