-
4
-
-
0001009963
-
Just-in-time application for building material management
-
A. Akintoye Just-in-time application for building material management Construction Management and Economics 13 2 1995 105 113
-
(1995)
Construction Management and Economics
, vol.13
, Issue.2
, pp. 105-113
-
-
Akintoye, A.1
-
5
-
-
0032667279
-
WorkPlan: Constraint-based database for work package scheduling
-
H. Choo, I.D. Tommelein, G. Ballard, and T.R. Zabelle WorkPlan: constraint-based database for work package scheduling Journal of Construction Engineering and Management 125 3 1999 151 160
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
7
-
-
78149284893
-
Craft Productivity Phase i
-
Construction Industry Institute (CII) The University of Texas at Austin Austin, TX
-
Construction Industry Institute (CII) Craft Productivity Phase I Research Summary 2009 The University of Texas at Austin Austin, TX
-
(2009)
Research Summary
-
-
-
9
-
-
77951933641
-
Advanced real-time safety management system for construction sites
-
Vilnius Gediminas Technical University Lithuania
-
A. Giretti, A. Carbonari, B. Naticchia, and M.D. Grassi Advanced real-time safety management system for construction sites Proc. the 25th International Symposium on Automation and Robotics in Construction, Vilnius, Lithuania 2008 Vilnius Gediminas Technical University Lithuania 300 305
-
(2008)
Proc. The 25th International Symposium on Automation and Robotics in Construction, Vilnius, Lithuania
, pp. 300-305
-
-
Giretti, A.1
Carbonari, A.2
Naticchia, B.3
Grassi, M.D.4
-
10
-
-
84862999765
-
Rapid automated monitoring of construction site activities using ultra-wideband
-
J. Teizer, D. Lao, and M. Sofer Rapid automated monitoring of construction site activities using ultra-wideband Proc., the 24th International Symposium on Automation and Robotics in Construction, Madras, India 2007 23 28
-
(2007)
Proc., the 24th International Symposium on Automation and Robotics in Construction, Madras, India
, pp. 23-28
-
-
Teizer, J.1
Lao, D.2
Sofer, M.3
-
11
-
-
84862993864
-
Analyzing the travel patterns of construction workers
-
J. Teizer, U. Mantripragada, and M. Venugopal Analyzing the travel patterns of construction workers Proc., 25th International Symposium on Automation and Robotics in Construction, Vilnius, Lithuania 2008 391 396
-
(2008)
Proc., 25th International Symposium on Automation and Robotics in Construction, Vilnius, Lithuania
, pp. 391-396
-
-
Teizer, J.1
Mantripragada, U.2
Venugopal, M.3
-
12
-
-
33745325795
-
Using global positioning systems to improve materials locating processes on industrial projects
-
C. Caldas, D. Grau, and C. Haas Using global positioning systems to improve materials locating processes on industrial projects. Journal of Construction Engineering and Management 132 7 2006 741 749
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.7
, pp. 741-749
-
-
Caldas, C.1
Grau, D.2
Haas, C.3
-
13
-
-
0011513664
-
Radio frequency identification application in the construction industry
-
E.J. Jaleskis, M.R. Anderson, C.T. Jahren, Y. Rodriguez, and S. Njoz Radio frequency identification application in the construction industry Journal of Construction Engineering and Management, ASCE 121 2 1995 189 196
-
(1995)
Journal of Construction Engineering and Management, ASCE
, vol.121
, Issue.2
, pp. 189-196
-
-
Jaleskis, E.J.1
Anderson, M.R.2
Jahren, C.T.3
Rodriguez, Y.4
Njoz, S.5
-
14
-
-
29144515805
-
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
-
J. Song, C. Haas, C. Caldas, E. Ergen, and B. Akinci Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Automation in Construction, Elsevier 15 2 2006 166 177
-
(2006)
Automation in Construction, Elsevier
, vol.15
, Issue.2
, pp. 166-177
-
-
Song, J.1
Haas, C.2
Caldas, C.3
Ergen, E.4
Akinci, B.5
-
15
-
-
27644546406
-
Utilizing radio frequency identification on precast concrete components - Supplier's perspective
-
B. Akinci, M. Patton, and E. Ergen Utilizing radio frequency identification on precast concrete components - supplier's perspective Proc., the Nineteenth International Symposium on Automation and Robotics in Construction (ISARC 2002), Washington, DC USA 2002 381 386
-
(2002)
Proc., the Nineteenth International Symposium on Automation and Robotics in Construction (ISARC 2002), Washington, DC USA
, pp. 381-386
-
-
Akinci, B.1
Patton, M.2
Ergen, E.3
-
16
-
-
33846821572
-
Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
-
E. Ergen, B. Akinci, and R. Sacks Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS Automation in Construction 16 3 2007 354 367
-
(2007)
Automation in Construction
, vol.16
, Issue.3
, pp. 354-367
-
-
Ergen, E.1
Akinci, B.2
Sacks, R.3
-
17
-
-
33644672678
-
The application of active radio frequency identification technology for tool tracking on construction job sites
-
P. Goodrum, M. McLaren, and A. Durfee The application of active radio frequency identification technology for tool tracking on construction job sites Journal of Automation in Construction, Elsevier 15 3 2006 291 302
-
(2006)
Journal of Automation in Construction, Elsevier
, vol.15
, Issue.3
, pp. 291-302
-
-
Goodrum, P.1
McLaren, M.2
Durfee, A.3
-
18
-
-
78649327916
-
Field experiments of an automated materials identification and localization model
-
D. Grau, and C.H. Caldas Field experiments of an automated materials identification and localization model Proc., the 2007 ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA 2007 689 696
-
(2007)
Proc., the 2007 ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA
, pp. 689-696
-
-
Grau, D.1
Caldas, C.H.2
-
19
-
-
63049083431
-
Field trial of automated material tracking in construction
-
S.N. Razavi, D. Young, H. Nasir, C. Haas, C. Caldas, and P. Goodrum Field trial of automated material tracking in construction Proc., CSCE 2008 conference, Quebec, Canada 2008
-
(2008)
Proc., CSCE 2008 Conference, Quebec, Canada
-
-
Razavi, S.N.1
Young, D.2
Nasir, H.3
Haas, C.4
Caldas, C.5
Goodrum, P.6
-
21
-
-
0036028115
-
Integrating barcode and GIS for monitoring construction progress
-
M.Y. Cheng, and J.C. Chen Integrating barcode and GIS for monitoring construction progress Automation in Construction 11 1 2002 23 33
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 23-33
-
-
Cheng, M.Y.1
Chen, J.C.2
-
22
-
-
0033871479
-
Automated construction system for high-rise reinforced concrete buildings
-
T. Wakisaka, N. Furuya, Y. Inoue, and T. Shiokawa Automated construction system for high-rise reinforced concrete buildings Automation in Construction 9 3 2000 229 250
-
(2000)
Automation in Construction
, vol.9
, Issue.3
, pp. 229-250
-
-
Wakisaka, T.1
Furuya, N.2
Inoue, Y.3
Shiokawa, T.4
-
23
-
-
0011993141
-
-
EW Communications, Inc. Palo Alto, CA
-
E.L. Walts Data Fusion for C3I, in Command, Control, Communications Intelligence (C3I) Handbook 1986 EW Communications, Inc. Palo Alto, CA 217 226
-
(1986)
Data Fusion for C3I, in Command, Control, Communications Intelligence (C3I) Handbook
, pp. 217-226
-
-
Walts, E.L.1
-
25
-
-
78149284971
-
A Reliability-Based Hybrid Data Fusion Method for Adaptive Location Estimation in Construction
-
tentatively accepted by the
-
S.N. Razavi, C. Haas, "A Reliability-Based Hybrid Data Fusion Method for Adaptive Location Estimation in Construction." tentatively accepted by the ASCE Journal of Computing in Civil Engineering (2010).
-
(2010)
ASCE Journal of Computing in Civil Engineering
-
-
Razavi, S.N.1
Haas, C.2
|