메뉴 건너뛰기




Volumn 23, Issue 1, 2009, Pages 3-13

Methodology for automating the identification and localization of construction components on industrial projects

Author keywords

Algorithms; Automation; Construction materials; Global positioning; Identification; Localization; Location; Sensors; Tracking

Indexed keywords

BUILDING MATERIALS;

EID: 58149259941     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2009)23:1(3)     Document Type: Article
Times cited : (133)

References (37)
  • 1
    • 27644546406 scopus 로고    scopus 로고
    • Utilizing radio-frequency identification on precast concrete components-Supplier's perspective
    • ", National Institute of Standards and Technology, Gaithersburg, Md..
    • Akinci, B., Patton, M., and Ergen, E. (2002). " Utilizing radio-frequency identification on precast concrete components-Supplier's perspective.." Proc., 19th Int. Symp. on Automation and Robotics in Construction, National Institute of Standards and Technology, Gaithersburg, Md., 381-386.
    • (2002) Proc., 19th Int. Symp. on Automation and Robotics in Construction , pp. 381-386
    • Akinci, B.1    Patton, M.2    Ergen, E.3
  • 2
    • 0023364960 scopus 로고
    • Costs and benefits of materials management systems
    • Bell, L. C., and Stukhart, G. (1987). " Costs and benefits of materials management systems.." J. Constr. Eng. Manage., 113 (2), 222-234.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 222-234
    • Bell, L.C.1    Stukhart, G.2
  • 3
    • 0004551106 scopus 로고
    • Major factors influencing craft productivity in nuclear power plant construction
    • Paper I.1, American Association of Cost Engineers, Morgantown, W.Va.
    • Borcherding, J. D., and Sebastian, S. J. (1980). " Major factors influencing craft productivity in nuclear power plant construction.." Proc., American Association of Cost Engineers, Paper I.1, American Association of Cost Engineers, Morgantown, W.Va.
    • (1980) Proc., American Association of Cost Engineers
    • Borcherding, J.D.1    Sebastian, S.J.2
  • 4
    • 0034291601 scopus 로고    scopus 로고
    • GPS-less low-cost outdoor localization for very small devices
    • ".
    • Bulusu, N., Heidemann, J., and Estrin, D. (2000). " GPS-less low-cost outdoor localization for very small devices.." IEEE Pers. Commun. Mag., 7 (5), 28-34.
    • (2000) IEEE Pers. Commun. Mag. , vol.7 , Issue.5 , pp. 28-34
    • Bulusu, N.1    Heidemann, J.2    Estrin, D.3
  • 5
    • 33745325795 scopus 로고    scopus 로고
    • Using global positioning system to improve materials-locating processes on industrial projects
    • ".
    • Caldas, C. H., Grau, D., and Haas, C. T. (2006). " Using global positioning system to improve materials-locating processes on industrial projects.." J. Constr. Eng. Manage., 132 (7), 741-749.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.7 , pp. 741-749
    • Caldas, C.H.1    Grau, D.2    Haas, C.T.3
  • 7
    • 11644287412 scopus 로고
    • Construction Industry Institute (CII).. "." The Construction Industry Research Summary 7-1, CII, Austin, Tex.
    • Construction Industry Institute (CII). (1986). " Costs and benefits of materials management systems.." The Construction Industry Research Summary 7-1, CII, Austin, Tex.
    • (1986) Costs and benefits of materials management systems
  • 8
    • 0030645102 scopus 로고    scopus 로고
    • Bar-code control of construction field personnel and construction materials
    • Philadelphia, Pa..
    • Echeverry, D., and Beltran, A. (1997). " Bar-code control of construction field personnel and construction materials.." Proc., 4th Congress on Computing in Civil Engineering, Philadelphia, Pa., 341-347.
    • (1997) Proc., 4th Congress on Computing in Civil Engineering , pp. 341-347
    • Echeverry, D.1    Beltran, A.2
  • 9
    • 33845728532 scopus 로고    scopus 로고
    • Tracking components and maintenance history within a facility utilizing radio-frequency identification technology
    • ".
    • Ergen, E., Akinci, B., East, B., and Kirby, J. (2007a). " Tracking components and maintenance history within a facility utilizing radio-frequency identification technology.." J. Comput. Civ. Eng., 21 (1), 11-20.
    • (2007) J. Comput. Civ. Eng. , vol.21 , Issue.1 , pp. 11-20
    • Ergen, E.1    Akinci, B.2    East, B.3    Kirby, J.4
  • 10
    • 33846821572 scopus 로고    scopus 로고
    • Tracking and locating components in a precast storage yard utilizing radio-frequency identification technology and GPS
    • ".
    • Ergen, E., Akinci, B., and Sacks, R. (2007b). " Tracking and locating components in a precast storage yard utilizing radio-frequency identification technology and GPS.." Autom. Constr., 16 (3), 354-367.
    • (2007) Autom. Constr. , vol.16 , Issue.3 , pp. 354-367
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 11
    • 2342442031 scopus 로고    scopus 로고
    • Improve your construction
    • Evans, R. E. (1999). " Improve your construction.." ABC Today, 8 (8), 8-9.
    • (1999) ABC Today , vol.8 , Issue.8 , pp. 8-9
    • Evans, R.E.1
  • 15
    • 78649327916 scopus 로고    scopus 로고
    • Field experiments of an automated materials identification and localization model
    • Reston, Va..
    • Grau Torrent, D., and Caldas, C. H. (2007). " Field experiments of an automated materials identification and localization model.." Proc., Computing in Civil Engineering Conf., Reston, Va., 689-696.
    • (2007) Proc., Computing in Civil Engineering Conf. , pp. 689-696
    • Grau Torrent, D.1    Caldas, C.H.2
  • 17
  • 18
    • 13944281379 scopus 로고    scopus 로고
    • Implementing radio-frequency identification in the construction process
    • Jaselskis, E. J., and El-Misalami, T. (2003). " Implementing radio-frequency identification in the construction process.." J. Constr. Eng. Manage., 129 (6), 680-688.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.6 , pp. 680-688
    • Jaselskis, E.J.1    El-Misalami, T.2
  • 19
    • 0034325195 scopus 로고    scopus 로고
    • A model for automation of infrastructure maintenance using representational forms
    • Kim, Y. S., and Haas, C. T. (2002). " A model for automation of infrastructure maintenance using representational forms.." Autom. Constr., 10 (1), 57-68.
    • (2002) Autom. Constr. , vol.10 , Issue.1 , pp. 57-68
    • Kim, Y.S.1    Haas, C.T.2
  • 20
    • 0032664468 scopus 로고    scopus 로고
    • Materials management: The key to successful project management
    • Kini, U. (1999). " Materials management: The key to successful project management.." J. Manage. Eng., 15 (1), 30-34.
    • (1999) J. Manage. Eng. , vol.15 , Issue.1 , pp. 30-34
    • Kini, U.1
  • 21
    • 0026898621 scopus 로고
    • Automated construction field-data management system
    • McCullouch, B. G. (1992). " Automated construction field-data management system.." J. Transp. Eng., 118 (4), 517-526.
    • (1992) J. Transp. Eng. , vol.118 , Issue.4 , pp. 517-526
    • Mccullouch, B.G.1
  • 22
    • 33746951436 scopus 로고    scopus 로고
    • An automated model for materials management and control
    • Navon, R., and Berkovich, O. (2006). " An automated model for materials management and control.." Constr. Manage. Econom., 24 (6), 635-646.
    • (2006) Constr. Manage. Econom. , vol.24 , Issue.6 , pp. 635-646
    • Navon, R.1    Berkovich, O.2
  • 23
    • 0038703640 scopus 로고    scopus 로고
    • DV-based positioning in ad hoc networks
    • Niculescu, D., and Nath, B. (2003). " DV-based positioning in ad hoc networks.." Telecommun. Syst., 22 (1-4), 267-280.
    • (2003) Telecommun. Syst. , vol.22 , Issue.14 , pp. 267-280
    • Niculescu, D.1    Nath, B.2
  • 24
    • 0004587153 scopus 로고
    • Planning has merit
    • O'Brien, K. (1989). " Planning has merit.." Electr. Contract., December, 54.
    • (1989) Electr. Contract. , pp. 54
    • O'brien, K.1
  • 26
    • 14744289522 scopus 로고    scopus 로고
    • Labor productivity drivers and opportunities in the construction industry
    • Rojas, E. M., and Aramvareekul, P. (2003). " Labor productivity drivers and opportunities in the construction industry.." J. Manage. Eng., 19 (2), 78-82.
    • (2003) J. Manage. Eng. , vol.19 , Issue.2 , pp. 78-82
    • Rojas, E.M.1    Aramvareekul, P.2
  • 27
    • 2942739545 scopus 로고    scopus 로고
    • Building project model support for automated labor monitoring
    • ".
    • Sacks, R., Navon, R., and Goldschmidt, E. (2003). " Building project model support for automated labor monitoring.." J. Comput. Civ. Eng., 17 (1), 19-27.
    • (2003) J. Comput. Civ. Eng. , vol.17 , Issue.1 , pp. 19-27
    • Sacks, R.1    Navon, R.2    Goldschmidt, E.3
  • 29
    • 3042760260 scopus 로고    scopus 로고
    • Technical Re UCB/ERL M02/26, Dept. of Electrical Engineering and Computer Sciences, Univ. of California at Berkeley, Berkeley, Calif.
    • Simic, S. N., and Sastry, S. (2002). " Distributed localization in wireless ad hoc networks.." Technical Rep. UCB/ERL M02/26, Dept. of Electrical Engineering and Computer Sciences, Univ. of California at Berkeley, Berkeley, Calif.
    • (2002) Distributed localization in wireless ad hoc networks
    • Simic, S.N.1    Sastry, S.2
  • 30
    • 33747373317 scopus 로고    scopus 로고
    • Tracking the location of materials on construction job sites
    • ".
    • Song, J., Haas, C. T., and Caldas, C. H. (2006a). " Tracking the location of materials on construction job sites.." J. Constr. Eng. Manage., 132 (9), 911-918.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.9 , pp. 911-918
    • Song, J.1    Haas, C.T.2    Caldas, C.H.3
  • 31
    • 29144515805 scopus 로고    scopus 로고
    • Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
    • ".
    • Song, J., Haas, C. T., Caldas, C., Ergen, E., and Akinci, B. (2006b). " Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects.." Autom. Constr., 15 (2), 166-177.
    • (2006) Autom. Constr. , vol.15 , Issue.2 , pp. 166-177
    • Song, J.1    Haas, C.T.2    Caldas, C.3    Ergen, E.4    Akinci, B.5
  • 32
    • 21244474042 scopus 로고    scopus 로고
    • Localization with mobile anchor points in wireless sensor networks
    • ".
    • Ssu, K., Ou, C., and Jiau, H. C. (2005). " Localization with mobile anchor points in wireless sensor networks.." IEEE Trans. Veh. Technol., 54 (3), 1187-1197.
    • (2005) IEEE Trans. Veh. Technol. , vol.54 , Issue.3 , pp. 1187-1197
    • Ssu, K.1    Ou, C.2    Jiau, H.C.3
  • 33
    • 33745316236 scopus 로고
    • Real-time GPS and non-line-of-sight metrology
    • Paper 1.5, National Institute of Standards and Technology, Gaithersburg, Md..
    • Stone, W. C. (1995). " Real-time GPS and non-line-of-sight metrology.." Proc., NIST Construction Automation Workshop, Paper 1.5, National Institute of Standards and Technology, Gaithersburg, Md., 29-41.
    • (1995) Proc., NIST Construction Automation Workshop , pp. 29-41
    • Stone, W.C.1
  • 34
    • 58149223821 scopus 로고    scopus 로고
    • Real-time tracking and analysis of construction operations
    • Bahamas.
    • Su, Y. Y., and Liu, L. Y. (2007). " Real-time tracking and analysis of construction operations.." Proc., Construction Research Congress, Bahamas.
    • (2007) Proc., Construction Research Congress
    • Su, Y.Y.1    Liu, L.Y.2
  • 35
    • 23044463065 scopus 로고    scopus 로고
    • Fundamental principles of site materials management
    • ".
    • Thomas, H. R., Riley, D. R., and Messner, J. I. (2005). " Fundamental principles of site materials management.." J. Constr. Eng. Manage., 131 (7), 808-815.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.7 , pp. 808-815
    • Thomas, H.R.1    Riley, D.R.2    Messner, J.I.3
  • 36
    • 0000603336 scopus 로고
    • Impact of material management on productivity-A case study
    • ".
    • Thomas, R., Sanvido, V. E., and Sanders, S. R. (1989). " Impact of material management on productivity-A case study.." J. Constr. Eng. Manage., 115 (3), 370-384.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.3 , pp. 370-384
    • Thomas, R.1    Sanvido, V.E.2    Sanders, S.R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.