-
1
-
-
0043275940
-
-
J. Comput. Civ. Eng., (4).
-
Abeid, J., and Arditi, D. (2002). " Linking time-lapse digital photography and dynamic scheduling of construction operations.." J. Comput. Civ. Eng., 16 (4), 269-279.
-
(2002)
Linking Time-lapse Digital Photography and Dynamic Scheduling of Construction Operations
, vol.16
, pp. 269-279
-
-
Abeid, J.1
Arditi, D.2
-
2
-
-
0041805006
-
-
" J. Constr. Eng. Manage., (4).
-
Akinci, B., Fischer, M., and Kunz, J. (2002a). " Automated generation of work spaces required by construction activities.." J. Constr. Eng. Manage., 128 (4), 306-315.
-
(2002)
Automated Generation of Work Spaces Required by Construction Activities
, vol.128
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
3
-
-
0043253368
-
-
" J. Comput. Civ. Eng., (2).
-
Akinci, B., Fischer, M., Levitt, R., and Carlson, R. (2002b). " Formalization and automation of time-space conflict analysis.." J. Comput. Civ. Eng., 16 (2), 124-134.
-
(2002)
Formalization and Automation of Time-space Conflict Analysis
, vol.16
, pp. 124-134
-
-
Akinci, B.1
Fischer, M.2
Levitt, R.3
Carlson, R.4
-
4
-
-
45749093535
-
-
ArcGIS version 9, Introduction, Parts I & II.. Environmental Systems and Research Institute, Redlands, Calif.
-
ArcGIS version 9, Introduction, Parts I & II. (2004). Environmental Systems and Research Institute, Redlands, Calif.
-
(2004)
-
-
-
5
-
-
45749116727
-
-
ArcView GIS version 3.2 reference manual for Windows.. Environmental Systems and Research Institute, Redlands, Calif.
-
ArcView GIS version 3.2 reference manual for Windows. (1996). Environmental Systems and Research Institute, Redlands, Calif.
-
(1996)
-
-
-
6
-
-
33846843097
-
-
Nat. Inst. Constr. Mgmt. and Res. (NICMAR) J. Constr. Mgmt. 0970-3675, (2).
-
Bansal, V. K., and Pal, M. (2006a). " Geographic information systems for construction industry: A review.." Nat. Inst. Constr. Mgmt. and Res. (NICMAR) J. Constr. Mgmt. 0970-3675, 21 (2), 1-12.
-
(2006)
Geographic Information Systems for Construction Industry: A Review
, vol.21
, pp. 1-12
-
-
Bansal, V.K.1
Pal, M.2
-
7
-
-
45749104580
-
-
Asian J. Civ. Eng., (2).
-
Bansal, V. K., and Pal, M. (2006b). " GIS based projects information system for construction management.." Asian J. Civ. Eng., 7 (2), 115-124.
-
(2006)
GIS Based Projects Information System for Construction Management
, vol.7
, pp. 115-124
-
-
Bansal, V.K.1
Pal, M.2
-
8
-
-
33846850077
-
-
Autom. Constr., (3).
-
Bansal, V. K., and Pal, M. (2007). " Potential of geographic information systems in building cost estimation and visualization.." Autom. Constr., 16 (3), 311-322.
-
(2007)
Potential of Geographic Information Systems in Building Cost Estimation and Visualization
, vol.16
, pp. 311-322
-
-
Bansal, V.K.1
Pal, M.2
-
9
-
-
0027788430
-
-
J. Comput. Civ. Eng., (3).
-
Camp, C. V., and Brown, M. C. (1993). " GIS procedure for developing three-dimensional subsurface profile.." J. Comput. Civ. Eng., 7 (3), 296-309.
-
(1993)
GIS Procedure for Developing Three-dimensional Subsurface Profile
, vol.7
, pp. 296-309
-
-
Camp, C.V.1
Brown, M.C.2
-
10
-
-
0038769156
-
-
Attribute data input and management.", Tata McGraw-Hill, New Delhi, India.
-
Chang, K. T. (2002). " Attribute data input and management.." Introduction to geographic information systems, Tata McGraw-Hill, New Delhi, India, 100-112.
-
(2002)
Introduction to Geographic Information Systems
, pp. 100-112
-
-
Chang, K.T.1
-
11
-
-
0034826063
-
-
Autom. Constr., (4).
-
Cheng, M. Y., and Chang, G. L. (2001). " Automating utility route design and planning through GIS.." Autom. Constr., 10 (4), 507-516.
-
(2001)
Automating Utility Route Design and Planning Through GIS
, vol.10
, pp. 507-516
-
-
Cheng, M.Y.1
Chang, G.L.2
-
12
-
-
5244248406
-
-
J. Constr. Eng. Manage., (4).
-
Cheng, M. Y., and O'Connor, J. T. (1996)." ArcSite: Enhanced GIS for construction site layout.." J. Constr. Eng. Manage., 122 (4), 329-336.
-
(1996)
ArcSite: Enhanced GIS for Construction Site Layout
, vol.122
, pp. 329-336
-
-
Cheng, M.Y.1
O'Connor, J.T.2
-
13
-
-
0035392411
-
-
J. Constr. Eng. Manage., (4).
-
Cheng, M. Y., and Yang, C. Y. (2001). " GIS-based cost estimate integrated with material layout planning.." J. Constr. Eng. Manage., 127 (4), 291-299.
-
(2001)
GIS-based Cost Estimate Integrated with Material Layout Planning
, vol.127
, pp. 291-299
-
-
Cheng, M.Y.1
Yang, C.Y.2
-
14
-
-
0026062850
-
-
" J. Comput. Civ. Eng., (1).
-
Cherneff, J., Logcher, R., and Sriram, D. (1991). " Integrating CAD with construction-schedule generation.." J. Comput. Civ. Eng., 5 (1), 64-84.
-
(1991)
Integrating CAD with Construction-schedule Generation
, vol.5
, pp. 64-84
-
-
Cherneff, J.1
Logcher, R.2
Sriram, D.3
-
15
-
-
26644453000
-
-
" J. Comput. Civ. Eng., (4).
-
Chin, S., Kim, K., and Kim, Y. S. (2005). " Generate-select-check based daily reporting system.." J. Comput. Civ. Eng., 19 (4), 412-425.
-
(2005)
Generate-select-check Based Daily Reporting System
, vol.19
, pp. 412-425
-
-
Chin, S.1
Kim, K.2
Kim, Y.S.3
-
16
-
-
45749120927
-
-
ESRI.. "." 〈〉 (May 15, 2007).
-
ESRI. (2007). " ArcGIS solutions for civil engineering.." 〈 http://www.esri.com/library/brochures/pdfs/arcgis-civil-engineering.pdf 〉 (May 15, 2007).
-
(2007)
ArcGIS Solutions for Civil Engineering
-
-
-
17
-
-
0033081646
-
-
" J. Surv. Eng., (1).
-
Greene, R., Agbenowosi, N., and Loganathan, G. V. (1999). " GIS-based approach to sewer system design.." J. Surv. Eng., 125 (1), 36-57.
-
(1999)
GIS-based Approach to Sewer System Design
, vol.125
, pp. 36-57
-
-
Greene, R.1
Agbenowosi, N.2
Loganathan, G.V.3
-
18
-
-
1842832075
-
-
Constr. Manage. Econom., (2).
-
Heesom, D., and Mahdjoubi, L. (2004). " Trends of 4D CAD applications for construction planning.." Constr. Manage. Econom., 22 (2), 171-182.
-
(2004)
Trends of 4D CAD Applications for Construction Planning
, vol.22
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
-
19
-
-
85160472310
-
-
Closure.", Balkema, Rotterdam, The Netherlands.
-
Issa, R. R. A., Flood, I., and O'Brien, W. J. (2003). " Closure.." 4D CAD and visualization in construction: Developments and applications, Balkema, Rotterdam, The Netherlands, 281-284.
-
(2003)
4D CAD and Visualization in Construction: Developments and Applications
, pp. 281-284
-
-
Issa, R.R.A.1
Flood, I.2
O'Brien, W.J.3
-
20
-
-
0027553426
-
-
" J. Constr. Eng. Manage., (1).
-
Jeljeli, M. N., Russell, J. S., Meyer, H. W. G., and Vonderohe, A. P. (1993). " Potential applications of geographic information systems to construction industry.." J. Constr. Eng. Manage., 119 (1), 72-86.
-
(1993)
Potential Applications of Geographic Information Systems to Construction Industry
, vol.119
, pp. 72-86
-
-
Jeljeli, M.N.1
Russell, J.S.2
Meyer, H.W.G.3
Vonderohe, A.P.4
-
21
-
-
0034227635
-
-
J. Constr. Eng. Manage., (4).
-
Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction.." J. Constr. Eng. Manage., 126 (4), 251-260.
-
(2000)
Feasibility Study of 4D CAD in Commercial Construction
, vol.126
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
22
-
-
0033156879
-
-
J. Comput. Civ. Eng., (3).
-
Miles, S. B., and Ho, C. L. (1999)." Applications and issues of GIS as tool for civil engineering modeling.." J. Comput. Civ. Eng., 13 (3), 144-152.
-
(1999)
Applications and Issues of GIS As Tool for Civil Engineering Modeling
, vol.13
, pp. 144-152
-
-
Miles, S.B.1
Ho, C.L.2
-
23
-
-
0003906653
-
-
Basic scheduling computations.", Van Nostrand Reinhold Company, New York.
-
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). " Basic scheduling computations.." Project management with CPM, PERT and precedence diagramming, Van Nostrand Reinhold Company, New York, 72-115.
-
(1983)
Project Management with CPM, PERT and Precedence Diagramming
, pp. 72-115
-
-
Moder, J.J.1
Phillips, C.R.2
Davis, E.W.3
-
24
-
-
0028184661
-
-
" J. Constr. Eng. Manage., (1).
-
Oloufa, A. A., Eltahan, A. A., and Papacostas, C. S. (1994). " Integrated GIS for construction site investigation.." J. Constr. Eng. Manage., 120 (1), 211-222.
-
(1994)
Integrated GIS for Construction Site Investigation
, vol.120
, pp. 211-222
-
-
Oloufa, A.A.1
Eltahan, A.A.2
Papacostas, C.S.3
-
25
-
-
0027086312
-
-
" J. Comput. Civ. Eng., (1).
-
Oloufa, A. A., Papacostas, C. S., and Espino, R. (1992)." Construction applications of relational databases in three-dimensional GIS.." J. Comput. Civ. Eng., 6 (1), 72-84.
-
(1992)
Construction Applications of Relational Databases in Three-dimensional GIS
, vol.6
, pp. 72-84
-
-
Oloufa, A.A.1
Papacostas, C.S.2
Espino, R.3
-
26
-
-
33747360709
-
-
J. Comput. Civ. Eng., (5).
-
Poku, S. E., and Arditi, D. (2006). " Construction scheduling and process control using geographic information systems.." J. Comput. Civ. Eng., 20 (5), 351-360.
-
(2006)
Construction Scheduling and Process Control Using Geographic Information Systems
, vol.20
, pp. 351-360
-
-
Poku, S.E.1
Arditi, D.2
-
27
-
-
0032593162
-
-
Autom. Constr., (6).
-
Retik, A., and Shapira, A. (1999). " VR based planning of construction site activities.." Autom. Constr., 8 (6), 671-680.
-
(1999)
VR Based Planning of Construction Site Activities
, vol.8
, pp. 671-680
-
-
Retik, A.1
Shapira, A.2
-
28
-
-
45749131570
-
-
J. Constr. Eng. Manage., (1).
-
Varghese, K., and O'Connor, J. T. (1995)." Routing large vehicles on industrial construction site.." J. Constr. Eng. Manage., 121 (1), 1-12.
-
(1995)
Routing Large Vehicles on Industrial Construction Site
, vol.121
, pp. 1-12
-
-
Varghese, K.1
O'Connor, J.T.2
-
29
-
-
4043175411
-
-
" J. Comput. Civ. Eng., (2).
-
Wu, J., Amaratunga, K., and Chitradon, R. (2002). " Design of distributed interactive online geographic information system viewer using wavelets.." J. Comput. Civ. Eng., 16 (2), 115-123.
-
(2002)
Design of Distributed Interactive Online Geographic Information System Viewer Using Wavelets
, vol.16
, pp. 115-123
-
-
Wu, J.1
Amaratunga, K.2
Chitradon, R.3
-
30
-
-
13944278488
-
-
" J. Constr. Eng. Manage., (5).
-
Zhong, D., Li, J., Zhu, H., and Song, L. (2004). " Geographic information system based visual simulation methodology and its application in concrete dam construction processes.." J. Constr. Eng. Manage., 130 (5), 742-750.
-
(2004)
Geographic Information System Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes
, vol.130
, pp. 742-750
-
-
Zhong, D.1
Li, J.2
Zhu, H.3
Song, L.4
|