-
1
-
-
80052281429
-
A review of container terminal simulation models
-
Angeloudis P., and Bell M.G.H. A review of container terminal simulation models Maritime Policy & Management 38 5 2011 523 540
-
(2011)
Maritime Policy & Management
, vol.38
, Issue.5
, pp. 523-540
-
-
Angeloudis, P.1
Bell, M.G.H.2
-
2
-
-
79960175941
-
Berth allocation planning in Seville inland port by simulation and optimisation
-
Arango C., Cortés P., Muñuzuri J., and Onieva L. Berth allocation planning in Seville inland port by simulation and optimisation Advanced Engineering Informatics 25 3 2011 452 461
-
(2011)
Advanced Engineering Informatics
, vol.25
, Issue.3
, pp. 452-461
-
-
Arango, C.1
Cortés, P.2
Muñuzuri, J.3
Onieva, L.4
-
3
-
-
84926413712
-
Simultaneous optimization of berth allocation, quay crane assignment and quay crane scheduling problems in container terminals
-
S. Helber, M. Breitner, D. Rösch, C. Schön, J.-M. Graf von der Schulenburg, P. Sibbertsen, M. Steinbach, S. Weber, A. Wolter, Springer Heidelberg, New York, Dordrecht, London
-
Aras N., TürkoʇullarI Y.B., TaşkIn Z.C., and AltInel K. Simultaneous optimization of berth allocation, quay crane assignment and quay crane scheduling problems in container terminals S. Helber, M. Breitner, D. Rösch, C. Schön, J.-M. Graf von der Schulenburg, P. Sibbertsen, M. Steinbach, S. Weber, A. Wolter, Operations research proceedings 2012 2014 Springer Heidelberg, New York, Dordrecht, London 101 107
-
(2014)
Operations research proceedings 2012
, pp. 101-107
-
-
Aras, N.1
Türkoʇullari, Y.B.2
Taşkin, Z.C.3
Altinel, K.4
-
4
-
-
70350568773
-
A survey of berth allocation and quay crane scheduling problems in container terminals
-
Bierwirth C., and Meisel F. A survey of berth allocation and quay crane scheduling problems in container terminals European Journal of Operational Research 202 3 2010 615 627
-
(2010)
European Journal of Operational Research
, vol.202
, Issue.3
, pp. 615-627
-
-
Bierwirth, C.1
Meisel, F.2
-
5
-
-
79955623119
-
Berth and quay crane allocation: A moldable task scheduling model
-
Blazewicz J., Cheng T.C.E., Machowiak M., and Oguz C. Berth and quay crane allocation: A moldable task scheduling model Journal of the Operational Research Society 62 7 2011 1189 1197
-
(2011)
Journal of the Operational Research Society
, vol.62
, Issue.7
, pp. 1189-1197
-
-
Blazewicz, J.1
Cheng, T.C.E.2
Machowiak, M.3
Oguz, C.4
-
6
-
-
84869097099
-
Determining crane areas for balancing workload among interfering and noninterfering cranes
-
Boysen N., Emde S., and Fliedner M. Determining crane areas for balancing workload among interfering and noninterfering cranes Naval Research Logistics 59 8 2012 656 662 10.1002/nav.21512
-
(2012)
Naval Research Logistics
, vol.59
, Issue.8
, pp. 656-662
-
-
Boysen, N.1
Emde, S.2
Fliedner, M.3
-
7
-
-
79952042407
-
Models for the discrete berth allocation problem: A computational comparison
-
10.1016/j.tre.2010.11.016
-
Buhrkal K., Zuglian S., Ropke S., Larsen J., and Lusby R. Models for the discrete berth allocation problem: A computational comparison Transportation Research Part E: Logistics and Transportation Review 47 4 2011 461 473 10.1016/j.tre.2010.11.016
-
(2011)
Transportation Research Part E: Logistics and Transportation Review
, vol.47
, Issue.4
, pp. 461-473
-
-
Buhrkal, K.1
Zuglian, S.2
Ropke, S.3
Larsen, J.4
Lusby, R.5
-
8
-
-
77955346997
-
Integrated quay crane and yard truck schedule problem in container terminals
-
Cao J., Shi Q., and Lee D.-H. Integrated quay crane and yard truck schedule problem in container terminals Tsinghua Science and Technology 15 4 2010 467 474
-
(2010)
Tsinghua Science and Technology
, vol.15
, Issue.4
, pp. 467-474
-
-
Cao, J.1
Shi, Q.2
Lee, D.-H.3
-
9
-
-
84930084134
-
Seaside operations in container terminals: Literature overview, trends, and research directions
-
Carlo, H. J., Vis, I. F. A. Roodbergen, K. J. (2013). Seaside operations in container terminals: Literature overview, trends, and research directions. Flexible Services and Manufacturing Journal, 1-39. doi: 10.1007/s10696-013-9178-3
-
(2013)
Flexible Services and Manufacturing Journal
, pp. 1-39
-
-
Carlo, H.J.1
Vis, I.F.A.2
Roodbergen, K.J.3
-
10
-
-
84893816514
-
Storage yard operations in container terminals: Literature overview, trends, and research directions
-
Carlo H.J., Vis I.F.A., and Roodbergen K.J. Storage yard operations in container terminals: Literature overview, trends, and research directions European Journal of Operational Research 235 2 2014 412 430 10.1016/j.ejor.2013.10.054
-
(2014)
European Journal of Operational Research
, vol.235
, Issue.2
, pp. 412-430
-
-
Carlo, H.J.1
Vis, I.F.A.2
Roodbergen, K.J.3
-
11
-
-
84900622252
-
Transport operations in container terminals: Literature overview, trends, research directions and classification scheme
-
Carlo H.J., Vis I.F.A., and Roodbergen K.J. Transport operations in container terminals: Literature overview, trends, research directions and classification scheme European Journal of Operational Research 236 1 2014 1 13 10.1016/j.ejor.2013.11.023
-
(2014)
European Journal of Operational Research
, vol.236
, Issue.1
, pp. 1-13
-
-
Carlo, H.J.1
Vis, I.F.A.2
Roodbergen, K.J.3
-
12
-
-
77954313735
-
Integrating berth allocation and quay crane assignments
-
Chang D., Jiang Z., Yan W., and He J. Integrating berth allocation and quay crane assignments Transportation Research Part E: Logistics and Transportation Review 46 6 2010 975 990 10.1016/j.tre.2010.05.008
-
(2010)
Transportation Research Part E: Logistics and Transportation Review
, vol.46
, Issue.6
, pp. 975-990
-
-
Chang, D.1
Jiang, Z.2
Yan, W.3
He, J.4
-
14
-
-
80054120246
-
A combinatorial benders' cuts algorithm for the quayside operation problem at container terminals
-
Chen J.H., Lee D.-H., and Cao J.X. A combinatorial benders' cuts algorithm for the quayside operation problem at container terminals Transportation Research Part E: Logistics and Transportation Review 48 1 2012 266 275 10.1016/j.tre.2011.06.004
-
(2012)
Transportation Research Part E: Logistics and Transportation Review
, vol.48
, Issue.1
, pp. 266-275
-
-
Chen, J.H.1
Lee, D.-H.2
Cao, J.X.3
-
15
-
-
84882895700
-
An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
-
Chen J.H., Lee D.-H., and Goh M. An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem European Journal of Operational Research 232 1 2014 198 208
-
(2014)
European Journal of Operational Research
, vol.232
, Issue.1
, pp. 198-208
-
-
Chen, J.H.1
Lee, D.-H.2
Goh, M.3
-
16
-
-
44649109639
-
A multi-objective multi-colony ant algorithm for solving the berth allocation problem
-
Y. Liu, A. Sun, H.T. Loh, W.F. Lu, E.-P. Lim, Springer
-
Cheong C.Y., and Tan K.C. A multi-objective multi-colony ant algorithm for solving the berth allocation problem Y. Liu, A. Sun, H.T. Loh, W.F. Lu, E.-P. Lim, Studies in Computational Intelligence: Vol. 116. Advances of computational intelligence in industrial systems 2008 Springer 333 350 10.1007/978-3-540-78297-1-16
-
(2008)
Studies in Computational Intelligence: Vol. 116. Advances of computational intelligence in industrial systems
, pp. 333-350
-
-
Cheong, C.Y.1
Tan, K.C.2
-
17
-
-
77958474679
-
Multi-objective and prioritized berth allocation in container ports
-
10.1007/s10479-008-0493-0
-
Cheong C.Y., Tan K.C., Liu D.K., and Lin C.J. Multi-objective and prioritized berth allocation in container ports Annals of Operations Research 180 1 2010 63 103 10.1007/s10479-008-0493-0
-
(2010)
Annals of Operations Research
, vol.180
, Issue.1
, pp. 63-103
-
-
Cheong, C.Y.1
Tan, K.C.2
Liu, D.K.3
Lin, C.J.4
-
18
-
-
77949280971
-
Multiship crane sequencing with yard congestion constraints
-
in press
-
Choo S., Klabjan D., and Simchi-Levi D. Multiship crane sequencing with yard congestion constraints Transportation Science 44 1 2010 98 115 10.1287/trsc.1090.0296 in press
-
(2010)
Transportation Science
, vol.44
, Issue.1
, pp. 98-115
-
-
Choo, S.1
Klabjan, D.2
Simchi-Levi, D.3
-
19
-
-
84875758465
-
Ship routing and scheduling in the new millennium
-
Christiansen M., Fagerholt K., Nygreen B., and Ronen D. Ship routing and scheduling in the new millennium European Journal of Operational Research 228 3 2013 467 483
-
(2013)
European Journal of Operational Research
, vol.228
, Issue.3
, pp. 467-483
-
-
Christiansen, M.1
Fagerholt, K.2
Nygreen, B.3
Ronen, D.4
-
20
-
-
84882455734
-
A workload balancing genetic algorithm for the quay crane scheduling problem
-
Chung S.H., and Chan F.T.S. A workload balancing genetic algorithm for the quay crane scheduling problem International Journal of Production Research 51 16 2013 4820 4834
-
(2013)
International Journal of Production Research
, vol.51
, Issue.16
, pp. 4820-4834
-
-
Chung, S.H.1
Chan, F.T.S.2
-
21
-
-
82255192312
-
A modified genetic algorithm for quay crane scheduling operations
-
Chung S.H., and Choy K.L. A modified genetic algorithm for quay crane scheduling operations Expert Systems with Applications 39 4 2012 4213 4221
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.4
, pp. 4213-4221
-
-
Chung, S.H.1
Choy, K.L.2
-
24
-
-
84859149908
-
Clustering search heuristic for solving a continuous berth allocation problem
-
J.-K. Hao, M. Middendorf, Springer
-
de Oliveira R.M., Mauri G.R., and Lorena L.A.N. Clustering search heuristic for solving a continuous berth allocation problem J.-K. Hao, M. Middendorf, Lecture notes in computer science: Vol. 7245. Evocop 2012 2012 Springer 49 62
-
(2012)
Lecture notes in computer science: Vol. 7245. Evocop 2012
, pp. 49-62
-
-
De Oliveira, R.M.1
Mauri, G.R.2
Lorena, L.A.N.3
-
25
-
-
84902292157
-
An integrated quay crane assignment and scheduling problem
-
Diabat A., and Theodorou E. An integrated quay crane assignment and scheduling problem Computers & Industrial Engineering 73 2014 115 123 10.1016/j.cie.2013.12.012
-
(2014)
Computers & Industrial Engineering
, vol.73
, pp. 115-123
-
-
Diabat, A.1
Theodorou, E.2
-
26
-
-
79960958288
-
Berth allocation considering fuel consumption and vessel emissions
-
Du Y., Chen Q., Quan X., Long L., and Fung R.Y.K. Berth allocation considering fuel consumption and vessel emissions Transportation Research Part E: Logistics and Transportation Review 47 6 2011 1021 1037 10.1016/j.tre.2011.05.011
-
(2011)
Transportation Research Part E: Logistics and Transportation Review
, vol.47
, Issue.6
, pp. 1021-1037
-
-
Du, Y.1
Chen, Q.2
Quan, X.3
Long, L.4
Fung, R.Y.K.5
-
27
-
-
84889665791
-
A heuristics-based solution to the continuous berth allocation and crane assignment problem
-
Elwany M.H., Ali I., and Abouelseoud Y. A heuristics-based solution to the continuous berth allocation and crane assignment problem Alexandria Engineering Journal 52 4 2013 671 677 http://dx.doi.org/10.1016/j.aej.2013.09.001
-
(2013)
Alexandria Engineering Journal
, vol.52
, Issue.4
, pp. 671-677
-
-
Elwany, M.H.1
Ali, I.2
Abouelseoud, Y.3
-
28
-
-
84901986744
-
The berth allocation problem with mobile quay walls: Problem definition, solution procedures, and extensions
-
Emde S., Boysen N., and Briskorn D. The berth allocation problem with mobile quay walls: Problem definition, solution procedures, and extensions Journal of Scheduling 17 3 2014 289 303 10.1007/s10951-013-0358-5
-
(2014)
Journal of Scheduling
, vol.17
, Issue.3
, pp. 289-303
-
-
Emde, S.1
Boysen, N.2
Briskorn, D.3
-
29
-
-
84885290392
-
Hybrid estimation of distribution algorithm for the quay crane scheduling problem
-
Expósito-Izquierdo C., González-Velarde J.L., Melián-Batista B., and Moreno-Vega J.M. Hybrid estimation of distribution algorithm for the quay crane scheduling problem Applied Soft Computing 13 10 2013 4063 4076
-
(2013)
Applied Soft Computing
, vol.13
, Issue.10
, pp. 4063-4076
-
-
Expósito-Izquierdo, C.1
González-Velarde, J.L.2
Melián-Batista, B.3
Moreno-Vega, J.M.4
-
30
-
-
84879083667
-
An estimation of distribution algorithm for solving the quay crane scheduling problem with availability constraints
-
M. Graña, C. Toro, J. Posada, R.J. Howlett, L.C. Jain, IOS Press
-
Expósito-Izquierdo C., Melián-Batista B., and Moreno-Vega J.M. An estimation of distribution algorithm for solving the quay crane scheduling problem with availability constraints M. Graña, C. Toro, J. Posada, R.J. Howlett, L.C. Jain, Advances in knowledge-based and intelligent information and engineering systems 243 2011 IOS Press 10 19
-
(2011)
Advances in knowledge-based and intelligent information and engineering systems
, vol.243
, pp. 10-19
-
-
Expósito-Izquierdo, C.1
Melián-Batista, B.2
Moreno-Vega, J.M.3
-
32
-
-
82555181244
-
Estimation of distribution algorithm for the quay crane scheduling problem
-
D.A. Pelta, N. Krasnogor, D. Dumitrescu, C. Chira, R. Lung, Springer
-
Expósito-Izquierdo C., Velarde J.L.G., Melián-Batista B., and Moreno-Vega J.M. Estimation of distribution algorithm for the quay crane scheduling problem D.A. Pelta, N. Krasnogor, D. Dumitrescu, C. Chira, R. Lung, Studies in computational intelligence 387 2012 Springer 183 194
-
(2012)
Studies in computational intelligence
, vol.387
, pp. 183-194
-
-
Expósito-Izquierdo, C.1
Velarde, J.L.G.2
Melián-Batista, B.3
Moreno-Vega, J.M.4
-
33
-
-
84903836987
-
A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach
-
10.1016/j.eswa.2014.05.002
-
Fu Y.-M., Diabat A., and Tsai I.-T. A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach Expert Systems with Applications 41 15 2014 6959 6965 10.1016/j.eswa.2014.05.002
-
(2014)
Expert Systems with Applications
, vol.41
, Issue.15
, pp. 6959-6965
-
-
Fu, Y.-M.1
Diabat, A.2
Tsai, I.-T.3
-
34
-
-
79952700668
-
Analysis of the continuous berth allocation problem in container ports using a genetic algorithm
-
Ganji S.S.R., Babazadeh A., and Arabshahi N. Analysis of the continuous berth allocation problem in container ports using a genetic algorithm Journal of Marine Science and Technology 15 4 2010 408 416 10.1007/s00773-010-0095-9
-
(2010)
Journal of Marine Science and Technology
, vol.15
, Issue.4
, pp. 408-416
-
-
Ganji, S.S.R.1
Babazadeh, A.2
Arabshahi, N.3
-
35
-
-
73149099166
-
Modeling and solving the tactical berth allocation problem
-
Giallombardo G., Moccia L., Salani M., and Vacca I. Modeling and solving the tactical berth allocation problem Transportation Research Part B: Methodological 44 2 2010 232 245 10.1016/j.trb.2009.07.003
-
(2010)
Transportation Research Part B: Methodological
, vol.44
, Issue.2
, pp. 232-245
-
-
Giallombardo, G.1
Moccia, L.2
Salani, M.3
Vacca, I.4
-
36
-
-
84937348339
-
A simulation based approach to optimize berth throughput under uncertainty at marine container terminals
-
Golias M.M. A simulation based approach to optimize berth throughput under uncertainty at marine container terminals MODSIM world conference & Expo, Hampton, Virginia, USA 2010 1 7
-
(2010)
MODSIM world conference & Expo, Hampton, Virginia, USA
, pp. 1-7
-
-
Golias, M.M.1
-
37
-
-
80955159635
-
A bi-objective berth allocation formulation to account for vessel handling time uncertainty
-
Golias M.M. A bi-objective berth allocation formulation to account for vessel handling time uncertainty Maritime Economics & Logistics 13 4 2011 419 441 10.1057/mel.2011.21
-
(2011)
Maritime Economics & Logistics
, vol.13
, Issue.4
, pp. 419-441
-
-
Golias, M.M.1
-
40
-
-
78651321905
-
A multi-objective decision and analysis approach for the berth scheduling problem
-
Golias M.M., Boilé M., Theofanis S., and Taboada H.A. A multi-objective decision and analysis approach for the berth scheduling problem International Journal of Information Technology Project Management 1 1 2010 54 73
-
(2010)
International Journal of Information Technology Project Management
, vol.1
, Issue.1
, pp. 54-73
-
-
Golias, M.M.1
Boilé, M.2
Theofanis, S.3
Taboada, H.A.4
-
41
-
-
79955924025
-
Berth scheduling with variable cost functions
-
Golias M.M., and Haralambides H.E. Berth scheduling with variable cost functions Maritime Economics & Logistics 13 2 2011 174 189 10.1057/mel.2011.4
-
(2011)
Maritime Economics & Logistics
, vol.13
, Issue.2
, pp. 174-189
-
-
Golias, M.M.1
Haralambides, H.E.2
-
42
-
-
84885951972
-
Robust berth scheduling at marine container terminals via hierarchical optimization
-
Golias M.M., Portal I., Konur D., Kaisar E., and Kolomvos G. Robust berth scheduling at marine container terminals via hierarchical optimization Computers & Operations Research 41 0 2014 412 422
-
(2014)
Computers & Operations Research
, vol.41
, pp. 412-422
-
-
Golias, M.M.1
Portal, I.2
Konur, D.3
Kaisar, E.4
Kolomvos, G.5
-
43
-
-
70450230571
-
The berth allocation problem: Optimizing vessel arrival time
-
Golias M.M., Saharidis G.K., Boilé M., Theofanis S., and Ierapetritou M.G. The berth allocation problem: Optimizing vessel arrival time Maritime Economics & Logistics 11 4 2009 358 377 10.1057/mel.2009.12
-
(2009)
Maritime Economics & Logistics
, vol.11
, Issue.4
, pp. 358-377
-
-
Golias, M.M.1
Saharidis, G.K.2
Boilé, M.3
Theofanis, S.4
Ierapetritou, M.G.5
-
44
-
-
84926407951
-
Decision problems and applications of operations research at marine container terminals
-
J.J. Cochran, L.A. Cox, P. Keskinocak, J.P. Kharoufeh, J.C. Smith, John Wiley & Sons, Inc.
-
Goodchild A., Zhao W., and Wygonik E. Decision problems and applications of operations research at marine container terminals J.J. Cochran, L.A. Cox, P. Keskinocak, J.P. Kharoufeh, J.C. Smith, Wiley encyclopedia of operations research and management science 2010 John Wiley & Sons, Inc. 1 20
-
(2010)
Wiley encyclopedia of operations research and management science
, pp. 1-20
-
-
Goodchild, A.1
Zhao, W.2
Wygonik, E.3
-
45
-
-
33751017964
-
Double-cycling strategies for container ships and their effect on ship loading and unloading operations
-
Goodchild A.V., and Daganzo C.F. Double-cycling strategies for container ships and their effect on ship loading and unloading operations Transportation Science 40 4 2006 473 483
-
(2006)
Transportation Science
, vol.40
, Issue.4
, pp. 473-483
-
-
Goodchild, A.V.1
Daganzo, C.F.2
-
46
-
-
78649523099
-
Analysis of berth allocation and inspection operations in a container terminal
-
Guan Y., and Yang K.-H. Analysis of berth allocation and inspection operations in a container terminal Maritime Economics & Logistics 12 4 2010 347 369 10.1057/mel.2010.12
-
(2010)
Maritime Economics & Logistics
, vol.12
, Issue.4
, pp. 347-369
-
-
Guan, Y.1
Yang, K.-H.2
-
47
-
-
84896320050
-
The crane scheduling problem: Models and solution approaches
-
Guan Y., Yang K.-H., and Zhou Z. The crane scheduling problem: Models and solution approaches Annals of Operations Research 203 1 2013 119 139 10.1007/s10479-010-0765-3
-
(2013)
Annals of Operations Research
, vol.203
, Issue.1
, pp. 119-139
-
-
Guan, Y.1
Yang, K.-H.2
Zhou, Z.3
-
48
-
-
84855707693
-
A dynamic berth allocation problem with priority considerations under stochastic nature
-
D.-S. Huang, Y. Gan, P. Gupta, M.M. Gromiha, Springer
-
Guldogan E.U., Bulut O., and Tasgetiren M.F. A dynamic berth allocation problem with priority considerations under stochastic nature D.-S. Huang, Y. Gan, P. Gupta, M.M. Gromiha, Lecture notes in computer science: Vol. 6839. Advanced intelligent computing theories and applications 2012 Springer 74 82 10.1007/978-3-642-25944-9-10
-
(2012)
Lecture notes in computer science: Vol. 6839. Advanced intelligent computing theories and applications
, pp. 74-82
-
-
Guldogan, E.U.1
Bulut, O.2
Tasgetiren, M.F.3
-
49
-
-
84903318607
-
A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints
-
Guo P., Cheng W., and Wang Y. A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints Engineering Optimization 46 10 2014 1411 1429 10.1080/0305215X.2013.844803
-
(2014)
Engineering Optimization
, vol.46
, Issue.10
, pp. 1411-1429
-
-
Guo, P.1
Cheng, W.2
Wang, Y.3
-
50
-
-
84869195903
-
A genetic algorithm approach for quay crane scheduling with non-interference constraints at Narvik container terminal
-
Hakam M.H., Solvang W.D., and Hammervoll T. A genetic algorithm approach for quay crane scheduling with non-interference constraints at Narvik container terminal International Journal of Logistics Research and Applications 15 4 2012 269 281
-
(2012)
International Journal of Logistics Research and Applications
, vol.15
, Issue.4
, pp. 269-281
-
-
Hakam, M.H.1
Solvang, W.D.2
Hammervoll, T.3
-
51
-
-
77957698525
-
A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
-
Han X.-l., Lu Z.-q., and Xi L.-f. A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time European Journal of Operational Research 207 3 2010 1327 1340 10.1016/j.ejor.2010.07.018
-
(2010)
European Journal of Operational Research
, vol.207
, Issue.3
, pp. 1327-1340
-
-
Han, X.-L.1
Lu, Z.-Q.2
Xi, L.-F.3
-
52
-
-
70350569688
-
A note on formulations of static and dynamic berth allocation problems
-
Hansen P., and Oǧuz C. A note on formulations of static and dynamic berth allocation problems Les Cahiers du GERAD 30 2003 1 17
-
(2003)
Les Cahiers du GERAD
, vol.30
, pp. 1-17
-
-
Hansen, P.1
Očuz, C.2
-
53
-
-
77949285171
-
An investigation into berth allocation and quay crane assignment based on hybrid parallel genetic algorithm
-
Institute of Electrical and Electronics Engineers
-
He J., Mi W., Chang D., and Yan W. An investigation into berth allocation and quay crane assignment based on hybrid parallel genetic algorithm 2009 international conference on artificial intelligence and computational intelligence 2009 Institute of Electrical and Electronics Engineers 48 53 10.1109/AICI.2009.41
-
(2009)
2009 international conference on artificial intelligence and computational intelligence
, pp. 48-53
-
-
He, J.1
Mi, W.2
Chang, D.3
Yan, W.4
-
54
-
-
84865997489
-
Strategic allocation of cyclically calling vessels for multi-terminal container operators
-
Hendriks M.P.M., Armbruster D., Laumanns M., Lefeber E., and Udding J.T. Strategic allocation of cyclically calling vessels for multi-terminal container operators Flexible Services and Manufacturing Journal 24 3 2012 248 273
-
(2012)
Flexible Services and Manufacturing Journal
, vol.24
, Issue.3
, pp. 248-273
-
-
Hendriks, M.P.M.1
Armbruster, D.2
Laumanns, M.3
Lefeber, E.4
Udding, J.T.5
-
55
-
-
77953534288
-
Robust cyclic berth planning of container vessels
-
Hendriks M., Laumanns M., Lefeber E., and Udding J.T. Robust cyclic berth planning of container vessels OR Spectrum 32 3 2010 501 517 10.1007/s00291-010-0198-z
-
(2010)
OR Spectrum
, vol.32
, Issue.3
, pp. 501-517
-
-
Hendriks, M.1
Laumanns, M.2
Lefeber, E.3
Udding, J.T.4
-
56
-
-
84874020639
-
Simultaneous berth allocation and yard planning at tactical level
-
Hendriks M.P.M., Lefeber E., and Udding J.T. Simultaneous berth allocation and yard planning at tactical level OR Spectrum 35 2 2013 441 456 10.1007/s00291-012-0305-4
-
(2013)
OR Spectrum
, vol.35
, Issue.2
, pp. 441-456
-
-
Hendriks, M.P.M.1
Lefeber, E.2
Udding, J.T.3
-
57
-
-
17444386492
-
Berth allocation in a container terminal - Development of a decision support system (in German)
-
H. Dyckhoff, U. Derigs, M. Salomon, H.C. Tijms, Springer Berlin
-
Hoffarth L., and Voß S. Berth allocation in a container terminal - Development of a decision support system (in German) H. Dyckhoff, U. Derigs, M. Salomon, H.C. Tijms, Operations research proceedings 1993 1994 Springer Berlin 89 95
-
(1994)
Operations research proceedings 1993
, pp. 89-95
-
-
Hoffarth, L.1
Voß, S.2
-
58
-
-
84893291174
-
Berth and quay-crane allocation problem considering fuel consumption and emissions from vessels
-
Hu Q.-M., Hu Z.-H., and Du Y. Berth and quay-crane allocation problem considering fuel consumption and emissions from vessels Computers & Industrial Engineering 70 2014 1 10 http://dx.doi.org/10.1016/j.cie.2014.01.003
-
(2014)
Computers & Industrial Engineering
, vol.70
, pp. 1-10
-
-
Hu, Q.-M.1
Hu, Z.-H.2
Du, Y.3
-
59
-
-
0031096047
-
Efficient planning of berth allocation for container terminals in asia
-
Imai A., Nagaiwa K., and Tat C.W. Efficient planning of berth allocation for container terminals in asia Journal of Advanced Transportation 31 1 1997 75 94
-
(1997)
Journal of Advanced Transportation
, vol.31
, Issue.1
, pp. 75-94
-
-
Imai, A.1
Nagaiwa, K.2
Tat, C.W.3
-
62
-
-
84874312732
-
The berth allocation problem with stochastic vessel handling times
-
Karafa J., Golias M.M., Ivey S., Saharidis G.K.D., and Leonardos N. The berth allocation problem with stochastic vessel handling times The International Journal of Advanced Manufacturing Technology 65 1-4 2013 473 484 10.1007/s00170-012-4186-0
-
(2013)
The International Journal of Advanced Manufacturing Technology
, vol.65
, Issue.1-4
, pp. 473-484
-
-
Karafa, J.1
Golias, M.M.2
Ivey, S.3
Saharidis, G.K.D.4
Leonardos, N.5
-
63
-
-
84865269062
-
An efficient genetic algorithm for solving the quay crane scheduling problem
-
Kaveshgar N., Huynh N., and Rahimian S.K. An efficient genetic algorithm for solving the quay crane scheduling problem Expert Systems with Applications 39 18 2012 13108 13117
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.18
, pp. 13108-13117
-
-
Kaveshgar, N.1
Huynh, N.2
Rahimian, S.K.3
-
64
-
-
84926415913
-
Solving the quay crane scheduling problem using genetic algorithm in MATLAB
-
Transportation Research Board
-
Kaveshgar N., Huynh N., and Rahimian S.K. Solving the quay crane scheduling problem using genetic algorithm in MATLAB Trb 91st annual meeting compendium of papers 2012 Transportation Research Board 1 20
-
(2012)
Trb 91st annual meeting compendium of papers
, pp. 1-20
-
-
Kaveshgar, N.1
Huynh, N.2
Rahimian, S.K.3
-
65
-
-
1642618965
-
A crane scheduling method for port container terminals
-
Kim K.H., and Park Y.M. A crane scheduling method for port container terminals European Journal of Operational Research 156 3 2004 752 768
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.3
, pp. 752-768
-
-
Kim, K.H.1
Park, Y.M.2
-
66
-
-
84901728087
-
On double cycling for container port productivity improvement
-
Ku, D. Arthanari, T. S. (2014). On double cycling for container port productivity improvement. Annals of Operations Research, 1-16. doi: 10.1007/s10479-014-1645-z
-
(2014)
Annals of Operations Research
, pp. 1-16
-
-
Ku, D.1
Arthanari, T.S.2
-
68
-
-
84864763674
-
Artificial intelligence hybrid heuristic based on tabu search for the dynamic berth allocation problem
-
Lalla-Ruiz E., Melián-Batista B., and Moreno-Vega J.M. Artificial intelligence hybrid heuristic based on tabu search for the dynamic berth allocation problem Engineering Applications of Artificial Intelligence 25 6 2012 1132 1141 10.1016/j.engappai.2012.06.001
-
(2012)
Engineering Applications of Artificial Intelligence
, vol.25
, Issue.6
, pp. 1132-1141
-
-
Lalla-Ruiz, E.1
Melián-Batista, B.2
Moreno-Vega, J.M.3
-
69
-
-
84946077447
-
Optimal algorithm for the general quay crane double-cycling problem
-
Lee, C.-Y., Liu, M. Chu, C. (2014). Optimal algorithm for the general quay crane double-cycling problem. Transportation Science. doi: 10.1287/trsc.2014.0563
-
(2014)
Transportation Science
-
-
Lee, C.-Y.1
Liu, M.2
Chu, C.3
-
70
-
-
77951130205
-
An improved approach for quay crane scheduling with non-crossing constraints
-
Lee D.-H., and Chen J.H. An improved approach for quay crane scheduling with non-crossing constraints Engineering Optimization 42 1 2010 1 15
-
(2010)
Engineering Optimization
, vol.42
, Issue.1
, pp. 1-15
-
-
Lee, D.-H.1
Chen, J.H.2
-
75
-
-
78649262548
-
An approximation algorithm for quay crane scheduling with handling priority in port container terminals
-
Lee D.-H., and Wang H.Q. An approximation algorithm for quay crane scheduling with handling priority in port container terminals Engineering Optimization 42 12 2010 1151 1161 10.1080/03052151003686708
-
(2010)
Engineering Optimization
, vol.42
, Issue.12
, pp. 1151-1161
-
-
Lee, D.-H.1
Wang, H.Q.2
-
76
-
-
77954926918
-
Integrated discrete berth allocation and quay crane scheduling in port container terminals
-
Lee D.-H., and Wang H.Q. Integrated discrete berth allocation and quay crane scheduling in port container terminals Engineering Optimization 42 8 2010 747 761 10.1080/03052150903406571
-
(2010)
Engineering Optimization
, vol.42
, Issue.8
, pp. 747-761
-
-
Lee, D.-H.1
Wang, H.Q.2
-
77
-
-
77953537858
-
Simulation-based optimization for discharge/loading operations at a maritime container terminal
-
Legato P., Mazza R.M., and Trunfio R. Simulation-based optimization for discharge/loading operations at a maritime container terminal OR Spectrum 32 3 2010 543 567
-
(2010)
OR Spectrum
, vol.32
, Issue.3
, pp. 543-567
-
-
Legato, P.1
Mazza, R.M.2
Trunfio, R.3
-
78
-
-
84901476853
-
A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
-
Legato P., and Trunfio R. A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules 4OR 12 2 2014 123 156
-
(2014)
4OR
, vol.12
, Issue.2
, pp. 123-156
-
-
Legato, P.1
Trunfio, R.2
-
79
-
-
84855532149
-
Modeling and solving rich quay crane scheduling problems
-
10.1016/j.cor.2011.09.025
-
Legato P., Trunfio R., and Meisel F. Modeling and solving rich quay crane scheduling problems Computers & Operations Research 39 9 2012 2063 2078 10.1016/j.cor.2011.09.025
-
(2012)
Computers & Operations Research
, vol.39
, Issue.9
, pp. 2063-2078
-
-
Legato, P.1
Trunfio, R.2
Meisel, F.3
-
80
-
-
84904637133
-
Loading, unloading and premarshalling of stacks in storage areas: Survey and classification
-
Lehnfeld J., and Knust S. Loading, unloading and premarshalling of stacks in storage areas: Survey and classification European Journal of Operational Research 239 2 2014 297 312 10.1016/j.ejor.2014.03.011
-
(2014)
European Journal of Operational Research
, vol.239
, Issue.2
, pp. 297-312
-
-
Lehnfeld, J.1
Knust, S.2
-
82
-
-
79958783397
-
Multi-objective hybrid genetic algorithm for quay crane dynamic assignment in berth allocation planning
-
Liang C., Guo J., and Yang Y. Multi-objective hybrid genetic algorithm for quay crane dynamic assignment in berth allocation planning Journal of Intelligent Manufacturing 22 3 2011 471 479 10.1007/s10845-009-0304-8
-
(2011)
Journal of Intelligent Manufacturing
, vol.22
, Issue.3
, pp. 471-479
-
-
Liang, C.1
Guo, J.2
Yang, Y.3
-
83
-
-
84870953510
-
A berth allocation planning problem with direct transshipment consideration
-
Liang C., Hwang H., and Gen M. A berth allocation planning problem with direct transshipment consideration Journal of Intelligent Manufacturing 23 6 2012 2207 2214 10.1007/s10845-011-0566-9
-
(2012)
Journal of Intelligent Manufacturing
, vol.23
, Issue.6
, pp. 2207-2214
-
-
Liang, C.1
Hwang, H.2
Gen, M.3
-
84
-
-
57149146833
-
Multiobjective hybrid genetic algorithm for quay crane scheduling in berth allocation planning
-
Liang C., Lin L., and Jo J. Multiobjective hybrid genetic algorithm for quay crane scheduling in berth allocation planning Int. J. Manufacturing Technology and Management 16 1-2 2009 127 146
-
(2009)
Int. J. Manufacturing Technology and Management
, vol.16
, Issue.12
, pp. 127-146
-
-
Liang, C.1
Lin, L.2
Jo, J.3
-
85
-
-
0346545785
-
The berth planning problem
-
Lim A. The berth planning problem Operations Research Letters 22 2-3 1998 105 110
-
(1998)
Operations Research Letters
, vol.22
, Issue.23
, pp. 105-110
-
-
Lim, A.1
-
86
-
-
84897834150
-
Solving the dynamic berth allocation problem by simulated annealing
-
Lin S.-W., and Ting C.-J. Solving the dynamic berth allocation problem by simulated annealing Engineering Optimization 46 3 2014 308 327 10.1080/0305215x.2013.768241
-
(2014)
Engineering Optimization
, vol.46
, Issue.3
, pp. 308-327
-
-
Lin, S.-W.1
Ting, C.-J.2
-
87
-
-
84922337729
-
Scheduling small number of quay cranes with non-interference constraint
-
Liu, M., Zheng, F. Li, J. (2014). Scheduling small number of quay cranes with non-interference constraint. Optimization Letters, 1-10. doi: 10.1007/s11590-014-0756-4
-
(2014)
Optimization Letters
, pp. 1-10
-
-
Liu, M.1
Zheng, F.2
Li, J.3
-
88
-
-
80051497103
-
Simultaneous berth and quay crane allocation problem in container terminal
-
Lu Z., Han X., and Xi L. Simultaneous berth and quay crane allocation problem in container terminal Advanced Science Letters 4 6-7 2011 2113 2118
-
(2011)
Advanced Science Letters
, vol.4
, Issue.67
, pp. 2113-2118
-
-
Lu, Z.1
Han, X.2
Xi, L.3
-
89
-
-
84863007229
-
A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
-
Lu Z., Han X., Xi L., and Erera A.L. A heuristic for the quay crane scheduling problem based on contiguous bay crane operations Computers & Operations Research 39 12 2012 2915 2928
-
(2012)
Computers & Operations Research
, vol.39
, Issue.12
, pp. 2915-2928
-
-
Lu, Z.1
Han, X.2
Xi, L.3
Erera, A.L.4
-
90
-
-
84862230543
-
A memetic algorithm for a continuous case of the berth allocation problem
-
A.C. Rosa, J. Kacprzyk, J. Filipe, A.D. Correia, SciTePress
-
Mauri G.R., de Andrade L.N., and Lorena L.A.N. A memetic algorithm for a continuous case of the berth allocation problem A.C. Rosa, J. Kacprzyk, J. Filipe, A.D. Correia, Proceedings of the international conference on evolutionary computation theory and applications and the proceedings of the international conference on fuzzy computation theory and applications (IJCCI 2011) 2011 SciTePress 105 113
-
(2011)
Proceedings of the international conference on evolutionary computation theory and applications and the proceedings of the international conference on fuzzy computation theory and applications (IJCCI 2011)
, pp. 105-113
-
-
Mauri, G.R.1
De Andrade, L.N.2
Lorena, L.A.N.3
-
91
-
-
80052282564
-
The quay crane scheduling problem with time windows
-
10.1002/nav.20471
-
Meisel F. The quay crane scheduling problem with time windows Naval Research Logistics 58 7 2011 619 636 10.1002/nav.20471
-
(2011)
Naval Research Logistics
, vol.58
, Issue.7
, pp. 619-636
-
-
Meisel, F.1
-
92
-
-
57149135986
-
Heuristics for the integration of crane productivity in the berth allocation problem
-
Meisel F., and Bierwirth C. Heuristics for the integration of crane productivity in the berth allocation problem Transportation Research Part E 45 1 2009 196 209
-
(2009)
Transportation Research Part E
, vol.45
, Issue.1
, pp. 196-209
-
-
Meisel, F.1
Bierwirth, C.2
-
93
-
-
77957307373
-
A unified approach for the evaluation of quay crane scheduling models and algorithms
-
Meisel F., and Bierwirth C. A unified approach for the evaluation of quay crane scheduling models and algorithms Computers & Operations Research 38 3 2011 683 693 10.1016/j.cor.2010.08.001
-
(2011)
Computers & Operations Research
, vol.38
, Issue.3
, pp. 683-693
-
-
Meisel, F.1
Bierwirth, C.2
-
94
-
-
84877934672
-
A framework for integrated berth allocation and crane operations planning in seaport container terminals
-
Meisel F., and Bierwirth C. A framework for integrated berth allocation and crane operations planning in seaport container terminals Transportation Science 47 2 2013 131 147 10.1287/trsc.1120.0419
-
(2013)
Transportation Science
, vol.47
, Issue.2
, pp. 131-147
-
-
Meisel, F.1
Bierwirth, C.2
-
95
-
-
77953540653
-
Container sequencing for quay cranes with internal reshuffles
-
Meisel F., and Wichmann M. Container sequencing for quay cranes with internal reshuffles OR Spectrum 32 3 2010 569 591
-
(2010)
OR Spectrum
, vol.32
, Issue.3
, pp. 569-591
-
-
Meisel, F.1
Wichmann, M.2
-
97
-
-
72049084030
-
Optimization of continuous berth and quay crane allocation problem in seaport container terminal
-
Institute of Electrical and Electronics Engineers
-
Na L., and Zhihong J. Optimization of continuous berth and quay crane allocation problem in seaport container terminal Second international conference on intelligent computation technology and automation 2009 (ICICTA'09) 2009 Institute of Electrical and Electronics Engineers 229 233 10.1109/ICICTA.2009.522
-
(2009)
Second international conference on intelligent computation technology and automation 2009 (ICICTA'09)
, pp. 229-233
-
-
Na, L.1
Zhihong, J.2
-
98
-
-
84886101942
-
A scheduling problem for a novel container transport system: A case of mobile harbor operation schedule
-
Nam H., and Lee T. A scheduling problem for a novel container transport system: A case of mobile harbor operation schedule Flexible Services and Manufacturing Journal 25 4 2013 576 608
-
(2013)
Flexible Services and Manufacturing Journal
, vol.25
, Issue.4
, pp. 576-608
-
-
Nam, H.1
Lee, T.2
-
99
-
-
84876167580
-
Hybrid evolutionary computation methods for quay crane scheduling problems
-
Nguyen S., Zhang M., Johnston M., and Chen Tan K. Hybrid evolutionary computation methods for quay crane scheduling problems Computers & Operations Research 40 8 2013 2083 2093
-
(2013)
Computers & Operations Research
, vol.40
, Issue.8
, pp. 2083-2093
-
-
Nguyen, S.1
Zhang, M.2
Johnston, M.3
Chen Tan, K.4
-
101
-
-
84926419670
-
Quay crane scheduling for river container terminals
-
E. Pap, Springer
-
Pap E., Bojanić V., Bojanić G., and Georgijević M. Quay crane scheduling for river container terminals E. Pap, Topics in intelligent engineering and informatics 3 2013 Springer 285 300 10.1007/978-3-642-33959-2
-
(2013)
Topics in intelligent engineering and informatics
, vol.3
, pp. 285-300
-
-
Pap, E.1
Bojanić, V.2
Bojanić, G.3
Georgijević, M.4
-
102
-
-
1342290320
-
A scheduling method for berth and quay cranes
-
Park Y.M., and Kim K.H. A scheduling method for berth and quay cranes OR Spectrum 25 1 2003 1 23
-
(2003)
OR Spectrum
, vol.25
, Issue.1
, pp. 1-23
-
-
Park, Y.M.1
Kim, K.H.2
-
103
-
-
79960006751
-
An enriched model for the integrated berth allocation and quay crane assignment problem
-
Raa B., Dullaert W., and Schaeren R.V. An enriched model for the integrated berth allocation and quay crane assignment problem Expert Systems with Applications 38 11 2011 14136 14147 10.1016/j.eswa.2011.04.224
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.11
, pp. 14136-14147
-
-
Raa, B.1
Dullaert, W.2
Schaeren, R.V.3
-
104
-
-
84872662653
-
Novel constraints satisfaction models for optimization problems in container terminals
-
Rashidi H., and Tsang E.P.K. Novel constraints satisfaction models for optimization problems in container terminals Applied Mathematical Modelling 37 6 2013 3601 3634
-
(2013)
Applied Mathematical Modelling
, vol.37
, Issue.6
, pp. 3601-3634
-
-
Rashidi, H.1
Tsang, E.P.K.2
-
105
-
-
84893714712
-
A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports
-
Robenek T., Umang N., Bierlaire M., and Ropke S. A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports European Journal of Operational Research 235 2 2014 399 411 http://dx.doi.org/10.1016/j.ejor.2013.08.015
-
(2014)
European Journal of Operational Research
, vol.235
, Issue.2
, pp. 399-411
-
-
Robenek, T.1
Umang, N.2
Bierlaire, M.3
Ropke, S.4
-
106
-
-
84906706874
-
A genetic algorithm for berth allocation and quay crane assignment
-
J. Pavón, N.D. Duque-Méndez, R. Fuentes-Fernández, Springer
-
Rodriguez-Molins M., Barber F., Sierra M.R., Puente J., and Salido M.A. A genetic algorithm for berth allocation and quay crane assignment J. Pavón, N.D. Duque-Méndez, R. Fuentes-Fernández, Lecture notes in computer science 7637 2012 Springer 601 610
-
(2012)
Lecture notes in computer science
, vol.7637
, pp. 601-610
-
-
Rodriguez-Molins, M.1
Barber, F.2
Sierra, M.R.3
Puente, J.4
Salido, M.A.5
-
107
-
-
84964239785
-
A genetic algorithm for robust berth allocation and quay crane assignment
-
Rodriguez-Molins M., Ingolotti L., Barber F., Salido M.A., Sierra M.R., and Puente J. A genetic algorithm for robust berth allocation and quay crane assignment Progress in Artificial Intelligence 2 4 2014 177 192 10.1007/s13748-014-0056-3
-
(2014)
Progress in Artificial Intelligence
, vol.2
, Issue.4
, pp. 177-192
-
-
Rodriguez-Molins, M.1
Ingolotti, L.2
Barber, F.3
Salido, M.A.4
Sierra, M.R.5
Puente, J.6
-
108
-
-
84894564140
-
A GRASP-based metaheuristic for the berth allocation problem and the quay crane assignment problem by managing vessel cargo holds
-
Rodriguez-Molins M., Salido M.A., and Barber F. A GRASP-based metaheuristic for the berth allocation problem and the quay crane assignment problem by managing vessel cargo holds Applied Intelligence 40 2 2014 273 290 10.1007/s10489-013-0462-4
-
(2014)
Applied Intelligence
, vol.40
, Issue.2
, pp. 273-290
-
-
Rodriguez-Molins, M.1
Salido, M.A.2
Barber, F.3
-
110
-
-
74249113831
-
The berth scheduling problem with customer differentiation: A new methodological approach based on hierarchical optimization
-
Saharidis G.K.D., Golias M.M., Boilé M., Theofanis S., and Ierapetritou M.G. The berth scheduling problem with customer differentiation: A new methodological approach based on hierarchical optimization The International Journal of Advanced Manufacturing Technology 46 1-4 2010 377 393 10.1007/s00170-009-2068-x
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.46
, Issue.14
, pp. 377-393
-
-
Saharidis, G.K.D.1
Golias, M.M.2
Boilé, M.3
Theofanis, S.4
Ierapetritou, M.G.5
-
111
-
-
79960188475
-
Integrated intelligent techniques for remarshaling and berthing in maritime terminals
-
Salido M.A., Rodriguez-Molins M., and Barber F. Integrated intelligent techniques for remarshaling and berthing in maritime terminals Advanced Engineering Informatics 25 3 2011 435 451 10.1016/j.aei.2010.10.001
-
(2011)
Advanced Engineering Informatics
, vol.25
, Issue.3
, pp. 435-451
-
-
Salido, M.A.1
Rodriguez-Molins, M.2
Barber, F.3
-
112
-
-
84857369955
-
A decision support system for managing combinatorial problems in container terminals
-
Salido M.A., Rodriguez-Molins M., and Barber F. A decision support system for managing combinatorial problems in container terminals Knowledge-Based Systems 29 1 2012 63 74 10.1016/j.knosys.2011.06.021
-
(2012)
Knowledge-Based Systems
, vol.29
, Issue.1
, pp. 63-74
-
-
Salido, M.A.1
Rodriguez-Molins, M.2
Barber, F.3
-
113
-
-
84886093802
-
Container loading and unloading scheduling for a mobile harbor system: A global and local search method
-
Shin K., and Lee T. Container loading and unloading scheduling for a mobile harbor system: A global and local search method Flexible Services and Manufacturing Journal 25 4 2013 557 575
-
(2013)
Flexible Services and Manufacturing Journal
, vol.25
, Issue.4
, pp. 557-575
-
-
Shin, K.1
Lee, T.2
-
114
-
-
84926419233
-
Resolution of the berth allocation problem through a heuristic model based on genetic algorithms
-
H.-J. Kreowski, B. Scholz-Reiter, K.-D. Thoben, Springer
-
Silva V.M.D., Novaes A.G., and Coelho A.S. Resolution of the berth allocation problem through a heuristic model based on genetic algorithms H.-J. Kreowski, B. Scholz-Reiter, K.-D. Thoben, Dynamics in logistics 2011 Springer 469 480
-
(2011)
Dynamics in logistics
, pp. 469-480
-
-
Silva, V.M.D.1
Novaes, A.G.2
Coelho, A.S.3
-
115
-
-
82755171844
-
Study on berth planning problem in a container seaport: Using an integrated programming approach
-
Song L., Cherrett T., and Guan W. Study on berth planning problem in a container seaport: Using an integrated programming approach Computers & Industrial Engineering 62 1 2012 119 128
-
(2012)
Computers & Industrial Engineering
, vol.62
, Issue.1
, pp. 119-128
-
-
Song, L.1
Cherrett, T.2
Guan, W.3
-
116
-
-
36248971841
-
Operations research at container terminals: A literature update
-
Stahlbock R., and Voß S. Operations research at container terminals: A literature update OR Spectrum 30 1 2008 1 52
-
(2008)
OR Spectrum
, vol.30
, Issue.1
, pp. 1-52
-
-
Stahlbock, R.1
Voß, S.2
-
117
-
-
17444364075
-
Container terminal operation and operations research - A classification and literature review
-
Steenken D., Voß S., and Stahlbock R. Container terminal operation and operations research - A classification and literature review OR Spectrum 26 1 2004 3 49
-
(2004)
OR Spectrum
, vol.26
, Issue.1
, pp. 3-49
-
-
Steenken, D.1
Voß, S.2
Stahlbock, R.3
-
118
-
-
84897915134
-
Modeling and solution of the joint quay crane and truck scheduling problem
-
Tang L., Zhao J., and Liu J. Modeling and solution of the joint quay crane and truck scheduling problem European Journal of Operational Research 236 3 2014 978 990
-
(2014)
European Journal of Operational Research
, vol.236
, Issue.3
, pp. 978-990
-
-
Tang, L.1
Zhao, J.2
Liu, J.3
-
119
-
-
84888389720
-
Particle swarm optimization algorithm for the berth allocation problem
-
Ting C.-J., Wu K.-C., and Chou H. Particle swarm optimization algorithm for the berth allocation problem Expert Systems with Applications 41 4 2014 1543 1550 http://dx.doi.org/10.1016/j.eswa.2013.08.051
-
(2014)
Expert Systems with Applications
, vol.41
, Issue.4
, pp. 1543-1550
-
-
Ting, C.-J.1
Wu, K.-C.2
Chou, H.3
-
120
-
-
84930083980
-
Literature survey of network optimization in container liner shipping
-
Tran, N. K. Haasis, H.-D. (2013). Literature survey of network optimization in container liner shipping. Flexible Services and Manufacturing Journal. doi: 10.1007/s10696-013-9179-2
-
(2013)
Flexible Services and Manufacturing Journal
-
-
Tran, N.K.1
Haasis, H.-D.2
-
121
-
-
84895058952
-
Optimal berth allocation and time-invariant quay crane assignment in container terminals
-
TürkoʇullarI Y.B., TaşkIn Z.C., Aras N., and AltInel I.K. Optimal berth allocation and time-invariant quay crane assignment in container terminals European Journal of Operational Research 235 1 2014 88 101 http://dx.doi.org/10.1016/j.ejor.2013.10.015
-
(2014)
European Journal of Operational Research
, vol.235
, Issue.1
, pp. 88-101
-
-
Türkoʇullari, Y.B.1
Taşkin, Z.C.2
Aras, N.3
Altinel, I.K.4
-
125
-
-
84897645451
-
A decision support system for quayside operations in a container terminal
-
Ursavas E. A decision support system for quayside operations in a container terminal Decision Support Systems 59 2014 312 324 http://dx.doi.org/10.1016/j.dss.2014.01.003
-
(2014)
Decision Support Systems
, vol.59
, pp. 312-324
-
-
Ursavas, E.1
-
126
-
-
84877952268
-
An exact algorithm for the integrated planning of berth allocation and quay crane assignment
-
Vacca I., Salani M., and Bierlaire M. An exact algorithm for the integrated planning of berth allocation and quay crane assignment Transportation Science 47 2 2013 148 161 10.1287/trsc.1120.0428
-
(2013)
Transportation Science
, vol.47
, Issue.2
, pp. 148-161
-
-
Vacca, I.1
Salani, M.2
Bierlaire, M.3
-
127
-
-
77953544763
-
Performance analysis of berth configurations at container terminals
-
Vis I.F.A., and Anholt R.G. Performance analysis of berth configurations at container terminals OR Spectrum 32 3 2010 453 476 10.1007/s00291-010-0201-8
-
(2010)
OR Spectrum
, vol.32
, Issue.3
, pp. 453-476
-
-
Vis, I.F.A.1
Anholt, R.G.2
-
128
-
-
0037449049
-
Transshipment of containers at a container terminal: An overview
-
Vis I.F.A., and de Koster R. Transshipment of containers at a container terminal: An overview European Journal of Operational Research 147 1 2003 1 16
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.1
, pp. 1-16
-
-
Vis, I.F.A.1
De Koster, R.2
-
129
-
-
84879436771
-
Multi resource scheduling problem based on an improved discrete particle swarm optimization
-
Wang S., Zheng J., Zheng K., Guo J., and Liu X. Multi resource scheduling problem based on an improved discrete particle swarm optimization Physics Procedia 25 1 2012 576 582 10.1016/j.phpro.2012.03.128
-
(2012)
Physics Procedia
, vol.25
, Issue.1
, pp. 576-582
-
-
Wang, S.1
Zheng, J.2
Zheng, K.3
Guo, J.4
Liu, X.5
-
130
-
-
78049309910
-
A case study of genetic algorithms for quay crane scheduling
-
B.-C. Chien, T.-P. Hong, Springer
-
Wang Y., Chen Y., and Wang K. A case study of genetic algorithms for quay crane scheduling B.-C. Chien, T.-P. Hong, Studies in computational intelligence 214 2009 Springer 119 125
-
(2009)
Studies in computational intelligence
, vol.214
, pp. 119-125
-
-
Wang, Y.1
Chen, Y.2
Wang, K.3
-
131
-
-
79958855303
-
A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
-
Wang Y., and Kim K.H. A quay crane scheduling algorithm considering the workload of yard cranes in a container yard Journal of Intelligent Manufacturing 22 3 2011 459 470 10.1007/s10845-009-0303-9
-
(2011)
Journal of Intelligent Manufacturing
, vol.22
, Issue.3
, pp. 459-470
-
-
Wang, Y.1
Kim, K.H.2
-
133
-
-
84860121630
-
Seaport research: A decadal analysis of trends and themes since the 1980s
-
Woo S.-H., Pettit S., Beresford A., and Kwak D.-W. Seaport research: A decadal analysis of trends and themes since the 1980s Transport Reviews 32 3 2012 351 377
-
(2012)
Transport Reviews
, vol.32
, Issue.3
, pp. 351-377
-
-
Woo, S.-H.1
Pettit, S.2
Beresford, A.3
Kwak, D.-W.4
-
134
-
-
80052782877
-
Berth allocation with time-dependent physical limitations on vessels
-
Xu D., Li C.-L., and Leung J.Y.-T. Berth allocation with time-dependent physical limitations on vessels European Journal of Operational Research 216 1 2012 47 56 10.1016/j.ejor.2011.07.012
-
(2012)
European Journal of Operational Research
, vol.216
, Issue.1
, pp. 47-56
-
-
Xu, D.1
Li, C.-L.2
Leung, J.Y.-T.3
-
135
-
-
82955249096
-
Robust berth scheduling with uncertain vessel delay and handling time
-
Xu Y., Chen Q., and Quan X. Robust berth scheduling with uncertain vessel delay and handling time Annals of Operations Research 192 1 2012 123 140 10.1007/s10479-010-0820-0
-
(2012)
Annals of Operations Research
, vol.192
, Issue.1
, pp. 123-140
-
-
Xu, Y.1
Chen, Q.2
Quan, X.3
-
136
-
-
84859030140
-
An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal
-
Yang C., Wang X., and Li Z. An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal Computers & Industrial Engineering 63 1 2012 243 253 10.1016/j.cie.2012.03.004
-
(2012)
Computers & Industrial Engineering
, vol.63
, Issue.1
, pp. 243-253
-
-
Yang, C.1
Wang, X.2
Li, Z.3
-
137
-
-
84867483342
-
The influence of the quay crane traveling time for the quay crane scheduling problem
-
International Association of Engineers
-
Yang K.-H. The influence of the quay crane traveling time for the quay crane scheduling problem Proceedings of the international multiconference of engineers and computer scientists 2012 II 2012 International Association of Engineers 1298 1301
-
(2012)
Proceedings of the international multiconference of engineers and computer scientists 2012
, vol.2
, pp. 1298-1301
-
-
Yang, K.-H.1
-
139
-
-
79956117560
-
Disruption management model and its algorithms for berth allocation problem in container terminals
-
Zeng Q., Hu X., Wang W., and Fang Y. Disruption management model and its algorithms for berth allocation problem in container terminals International Journal of Innovative Computing, Information and Control 7 5B 2011 2763 2773
-
(2011)
International Journal of Innovative Computing, Information and Control
, vol.7
, Issue.5 B
, pp. 2763-2773
-
-
Zeng, Q.1
Hu, X.2
Wang, W.3
Fang, Y.4
-
140
-
-
84860398922
-
Disruption recovery model for berth and quay crane scheduling in container terminals
-
Zeng Q., Yang Z., and Hu X. Disruption recovery model for berth and quay crane scheduling in container terminals Engineering Optimization 43 9 2011 967 983 10.1080/0305215X.2010.528411
-
(2011)
Engineering Optimization
, vol.43
, Issue.9
, pp. 967-983
-
-
Zeng, Q.1
Yang, Z.2
Hu, X.3
-
141
-
-
72049127521
-
The allocation of berths and quay cranes by using a sub-gradient optimization technique
-
Zhang C., Zheng L., Zhang Z., Shi L., and Armstrong A.J. The allocation of berths and quay cranes by using a sub-gradient optimization technique Computers & Industrial Engineering 58 1 2010 40 50 10.1016/j.cie.2009.08.002
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.1
, pp. 40-50
-
-
Zhang, C.1
Zheng, L.2
Zhang, Z.3
Shi, L.4
Armstrong, A.J.5
-
142
-
-
60549109062
-
Maximizing the number of dual-cycle operations of quay cranes in container terminals
-
Zhang H., and Kim K.H. Maximizing the number of dual-cycle operations of quay cranes in container terminals Computers & Industrial Engineering 56 3 2009 979 992
-
(2009)
Computers & Industrial Engineering
, vol.56
, Issue.3
, pp. 979-992
-
-
Zhang, H.1
Kim, K.H.2
-
143
-
-
50249142878
-
On-line scheduling with non-crossing constraints
-
Zhang L., Khammuang K., and Wirth A. On-line scheduling with non-crossing constraints Operations Research Letters 36 5 2008 579 583 10.1016/j.orl.2008.04.005
-
(2008)
Operations Research Letters
, vol.36
, Issue.5
, pp. 579-583
-
-
Zhang, L.1
Khammuang, K.2
Wirth, A.3
-
144
-
-
84859062448
-
A bi-objective model for robust berth allocation scheduling
-
Zhen L., and Chang D.-F. A bi-objective model for robust berth allocation scheduling Computers & Industrial Engineering 63 1 2012 262 273 10.1016/j.cie.2012.03.003
-
(2012)
Computers & Industrial Engineering
, vol.63
, Issue.1
, pp. 262-273
-
-
Zhen, L.1
Chang, D.-F.2
-
145
-
-
81555200682
-
An integrated model for berth template and yard template planning in transshipment hubs
-
Zhen L., Chew E.P., and Lee L.H. An integrated model for berth template and yard template planning in transshipment hubs Transportation Science 45 4 2011 483 504 10.1287/trsc.1100.0364
-
(2011)
Transportation Science
, vol.45
, Issue.4
, pp. 483-504
-
-
Zhen, L.1
Chew, E.P.2
Lee, L.H.3
-
146
-
-
79952701728
-
A decision model for berth allocation under uncertainty
-
Zhen L., Lee L.H., and Chew E.P. A decision model for berth allocation under uncertainty European Journal of Operational Research 212 1 2011 54 68 10.1016/j.ejor.2011.01.021
-
(2011)
European Journal of Operational Research
, vol.212
, Issue.1
, pp. 54-68
-
-
Zhen, L.1
Lee, L.H.2
Chew, E.P.3
-
147
-
-
42949129040
-
Study on berth and quay-crane allocation under stochastic environments in container terminal
-
Zhou P.-F., and Kang H.-G. Study on berth and quay-crane allocation under stochastic environments in container terminal Systems Engineering - Theory & Practice 28 1 2008 161 169
-
(2008)
Systems Engineering - Theory & Practice
, vol.28
, Issue.1
, pp. 161-169
-
-
Zhou, P.-F.1
Kang, H.-G.2
|