-
1
-
-
36248971841
-
Operations research at container terminals: A literature update
-
R. Stahlbock and S. Voß, "Operations research at container terminals: a literature update," OR Spectrum, vol. 30, no. 1, pp. 1-52, 2008.
-
(2008)
OR Spectrum
, vol.30
, Issue.1
, pp. 1-52
-
-
Stahlbock, R.1
Voß, S.2
-
2
-
-
17444364075
-
Container terminal operation and operations research - A classification and literature review
-
DOI 10.1007/s00291-003-0157-z
-
D. Steenken, S. Voß, and R. Stahlbock, "Container terminal operation and operations research - a classification and literature review," OR Spectrum, vol. 26, no. 1, pp. 3-49, 2004. (Pubitemid 40549578)
-
(2004)
OR Spectrum
, vol.26
, Issue.1
, pp. 3-49
-
-
Steenken, D.1
Voss, S.2
Stahlbock, R.3
-
3
-
-
0037449049
-
Transshipment of containers at a container terminal: An overview
-
I. F. A. Vis and R. de Koster, "Transshipment of containers at a container terminal: An overview," European Journal of Operational Research, vol. 147, no. 1, pp. 1-16, 2003.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.1
, pp. 1-16
-
-
Vis, I.F.A.1
De Koster, R.2
-
4
-
-
70350568773
-
A survey of berth allocation and quay crane scheduling problems in container terminals
-
C. Bierwirth and F. Meisel, "A survey of berth allocation and quay crane scheduling problems in container terminals,"European Journal of Operational Research, vol. 202, no. 3, pp. 615-627, 2010.
-
(2010)
European Journal of Operational Research
, vol.202
, Issue.3
, pp. 615-627
-
-
Bierwirth, C.1
Meisel, F.2
-
5
-
-
68249120807
-
A fast heuristic for quay crane scheduling with interference constraints
-
-, "A fast heuristic for quay crane scheduling with interference constraints," Journal of Scheduling, vol. 12, no. 4, pp. 345-360, 2009.
-
(2009)
Journal of Scheduling
, vol.12
, Issue.4
, pp. 345-360
-
-
Bierwirth, C.1
Meisel, F.2
-
6
-
-
1642618965
-
A crane scheduling method for port container terminals
-
K. H. Kim and Y.-M. Park, "A crane scheduling method for port container terminals," European Journal of Operational Research, vol. 156, no. 3, pp. 752-768, 2004.
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.3
, pp. 752-768
-
-
Kim, K.H.1
Park, Y.-M.2
-
7
-
-
33645693040
-
A branch and cut algorithm for the quay crane scheduling problem in a containera terminal
-
L. Moccia, J.-F. Cordeau, M. Gaudioso, and G. Laporte, "A branch and cut algorithm for the quay crane scheduling problem in a containera terminal," Naval Research Logistics, vol. 53, no. 1, pp. 45-59, 2006.
-
(2006)
Naval Research Logistics
, vol.53
, Issue.1
, pp. 45-59
-
-
Moccia, L.1
Cordeau, J.-F.2
Gaudioso, M.3
Laporte, G.4
-
8
-
-
34848836641
-
A tabu search heuristic for the quay crane scheduling problem
-
DOI 10.1007/s10951-007-0029-5
-
M. Sammarra, J.-F. Cordeau, G. Laporte, and M. F. Monaco, "A tabu search heuristic for the quay crane scheduling problem,"Journal of Scheduling, vol. 10, no. 4-5, pp. 327-336, 2007. (Pubitemid 47501054)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.4-5
, pp. 327-336
-
-
Sammarra, M.1
Cordeau, J.-F.2
Laporte, G.3
Monaco, M.F.4
-
9
-
-
57049126157
-
Variable neighbourhood search: Methods and applications
-
P. Hansen, N. Mladenovic, and J. A. Moreno-Pérez, "Variable neighbourhood search: methods and applications," 4OR, vol. 6, no. 4, pp. 319-360, 2008.
-
(2008)
4OR
, vol.6
, Issue.4
, pp. 319-360
-
-
Hansen, P.1
Mladenovic, N.2
Moreno-Pérez, J.A.3
|