메뉴 건너뛰기




Volumn 51, Issue 16, 2013, Pages 4820-4834

A workload balancing genetic algorithm for the quay crane scheduling problem

Author keywords

container; fuzzy logic; genetic algorithm; quay crane scheduling; terminal operations

Indexed keywords

BENCH-MARK PROBLEMS; COMPUTATIONAL TIME; FUZZY LOGIC CONTROLLERS; HEURISTIC APPROACH; MUTATION MECHANISM; NOVEL GENETIC ALGORITHM; QUAY CRANE SCHEDULING; TERMINAL OPERATION;

EID: 84882455734     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.774489     Document Type: Article
Times cited : (43)

References (22)
  • 2
    • 68249120807 scopus 로고    scopus 로고
    • A fast heuristic for quay crane scheduling with interference constraints
    • Bierwirth, C., and, Meisel, F. 2009. A Fast Heuristic for Quay Crane Scheduling with Interference Constraints. Journal of Scheduling, 12: 345-360.
    • (2009) Journal of Scheduling , vol.12 , pp. 345-360
    • Bierwirth, C.1    Meisel, F.2
  • 3
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • Bierwirth, C., and, Meisel, F. 2010. A Survey of Berth Allocation and Quay Crane Scheduling Problems in Container Terminals. European Journal of Operational Research, 202: 615-627.
    • (2010) European Journal of Operational Research , vol.202 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 5
    • 0025436513 scopus 로고
    • A branch and bound solution method for the crane scheduling problem
    • Daganzo, C. F., and, Peterkofsky, R. I. 1990. A Branch and Bound Solution Method for the Crane Scheduling Problem. Transportation Research Part B, 24: 159-172.
    • (1990) Transportation Research Part B , vol.24 , pp. 159-172
    • Daganzo, C.F.1    Peterkofsky, R.I.2
  • 8
    • 40949133001 scopus 로고    scopus 로고
    • A genetic-algorithm-based optimization model for solving the flexible assembly line balancing problem with work sharing and workstation revisiting
    • Gua, Z. X., Wong, W. K., Leung, S. Y. S., Fan, J. T., and, Chan, S. F. 2008. A Genetic-Algorithm-Based Optimization Model for Solving the Flexible Assembly Line Balancing Problem with Work Sharing and Workstation Revisiting. IEEE Transactions on Systems, Man, and Cybernetics Part C, 38 (2): 218-228.
    • (2008) IEEE Transactions on Systems, Man, and Cybernetics Part C , vol.38 , Issue.2 , pp. 218-228
    • Gua, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4    Chan, S.F.5
  • 9
    • 0002767793 scopus 로고    scopus 로고
    • An optimal routing algorithm for a transfer crane in port container terminals
    • Kim, K. H., and, Kim, K. Y. 1999. An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals. Transportation Science, 33 (1): 17-33.
    • (1999) Transportation Science , vol.33 , Issue.1 , pp. 17-33
    • Kim, K.H.1    Kim, K.Y.2
  • 10
    • 1642618965 scopus 로고    scopus 로고
    • A crane scheduling method for port container terminals
    • Kim, K. H., and, Park, Y. M. 2004. A Crane Scheduling Method for Port Container Terminals. European Journal of Operational Research, 156: 752-768.
    • (2004) European Journal of Operational Research , vol.156 , pp. 752-768
    • Kim, K.H.1    Park, Y.M.2
  • 11
    • 0036611386 scopus 로고    scopus 로고
    • Integration of mobile vehicles for automated material handling using profibus and ieee 802.11 networks
    • Lee, S., Lee, K. C., Lee, M. H., and, Harashima, F. 2002. Integration of Mobile Vehicles for Automated Material Handling Using Profibus and IEEE 802.11 Networks. IEEE Transactions on Industrial Electronics, 49 (2): 693-701.
    • (2002) IEEE Transactions on Industrial Electronics , vol.49 , Issue.2 , pp. 693-701
    • Lee, S.1    Lee, K.C.2    Lee, M.H.3    Harashima, F.4
  • 12
    • 34948884022 scopus 로고    scopus 로고
    • Quay crane scheduling with non-interference constraints in port container terminals
    • Lee, D. H., Wang, H. Q., and, Miao, L. 2006. Quay Crane Scheduling with Non-Interference Constraints in Port Container Terminals. Transportation Research Part E, 44: 124-135.
    • (2006) Transportation Research Part e , vol.44 , pp. 124-135
    • Lee, D.H.1    Wang, H.Q.2    Miao, L.3
  • 13
    • 84855532149 scopus 로고    scopus 로고
    • Modeling and solving rich quay crane scheduling problems
    • Legato, P., Trunfio, R., and, Meisel, F. 2012. Modeling and Solving Rich Quay Crane Scheduling Problems. Computers & Operations Research, 39: 2063-2078.
    • (2012) Computers & Operations Research , vol.39 , pp. 2063-2078
    • Legato, P.1    Trunfio, R.2    Meisel, F.3
  • 15
    • 33847695719 scopus 로고    scopus 로고
    • A m-parallel crane scheduling problem with a non-crossing constraint
    • Lim, A., Rodrigues, B., and, Xu, Z. 2007. A m-Parallel Crane Scheduling Problem with a Non-Crossing Constraint. Naval Research Logistics, 54 (2): 115-127.
    • (2007) Naval Research Logistics , vol.54 , Issue.2 , pp. 115-127
    • Lim, A.1    Rodrigues, B.2    Xu, Z.3
  • 16
    • 33645678746 scopus 로고    scopus 로고
    • Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
    • Liu, J., Wan, Y. W., and, Wang, L. 2006. Quay Crane Scheduling at Container Terminals to Minimize the Maximum Relative Tardiness of Vessel Departures. Naval Research Logistics, 53 (1): 60-74.
    • (2006) Naval Research Logistics , vol.53 , Issue.1 , pp. 60-74
    • Liu, J.1    Wan, Y.W.2    Wang, L.3
  • 18
    • 33645693040 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    • Moccia, L., Cordeau, J. F., Gaudioso, M., and, Laporte, G. 2006. A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal. Naval Research Logistics, 53: 45-59.
    • (2006) Naval Research Logistics , vol.53 , pp. 45-59
    • Moccia, L.1    Cordeau, J.F.2    Gaudioso, M.3    Laporte, G.4
  • 20
    • 0043173969 scopus 로고    scopus 로고
    • A fuzzy genetic multiobjective optimization algorithm for a multilevel generalized assignment problem
    • Sonia, H. G. 2003. A Fuzzy Genetic Multiobjective Optimization Algorithm for a Multilevel Generalized Assignment Problem. IEEE Transactions on Systems, Man, and Cybernetics Part C, 33 (2): 214-224.
    • (2003) IEEE Transactions on Systems, Man, and Cybernetics Part C , vol.33 , Issue.2 , pp. 214-224
    • Sonia, H.G.1
  • 21
  • 22
    • 33751071819 scopus 로고    scopus 로고
    • Crane scheduling with non-crossing constraints
    • Zhu, Y., and, Lim, A. 2006. Crane Scheduling with Non-Crossing Constraints. Journal of Operational Research Society, 57 (12): 1464-1471.
    • (2006) Journal of Operational Research Society , vol.57 , Issue.12 , pp. 1464-1471
    • Zhu, Y.1    Lim, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.