메뉴 건너뛰기




Volumn 38, Issue 3, 2011, Pages 683-693

A unified approach for the evaluation of quay crane scheduling models and algorithms

Author keywords

Across model evaluation; Benchmark generation; Container terminal; Quay crane scheduling

Indexed keywords

BENCHMARK GENERATION; COMPUTATIONAL STUDIES; CONTAINER TERMINAL; CONTAINER VESSEL; LEVELS OF DETAIL; MODEL EVALUATION; QUAY CRANE SCHEDULING; QUAY CRANES; SOLUTION PROCEDURE; THREE MODELS; UNIFIED APPROACH;

EID: 77957307373     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.08.001     Document Type: Article
Times cited : (82)

References (28)
  • 1
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • C. Bierwirth, and F. Meisel A survey of berth allocation and quay crane scheduling problems in container terminals European Journal of Operational Research 202 3 2010 615 627
    • (2010) European Journal of Operational Research , vol.202 , Issue.3 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 2
    • 1642618965 scopus 로고    scopus 로고
    • A crane scheduling method for port container terminals
    • K.H. Kim, and Y.M. Park A crane scheduling method for port container terminals European Journal of Operational Research 156 3 2004 752 768
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 752-768
    • Kim, K.H.1    Park, Y.M.2
  • 3
    • 33645693040 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    • L. Moccia, J.-F. Cordeau, M. Gaudioso, and G. Laporte A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal Naval Research Logistics 53 1 2006 45 59
    • (2006) Naval Research Logistics , vol.53 , Issue.1 , pp. 45-59
    • Moccia, L.1    Cordeau, J.-F.2    Gaudioso, M.3    Laporte, G.4
  • 4
    • 33745586759 scopus 로고    scopus 로고
    • Quay crane scheduling in container terminals
    • W.C. Ng, and K.L. Mak Quay crane scheduling in container terminals Engineering Optimization 38 6 2006 723 737
    • (2006) Engineering Optimization , vol.38 , Issue.6 , pp. 723-737
    • Ng, W.C.1    Mak, K.L.2
  • 7
    • 78649493904 scopus 로고    scopus 로고
    • Seaside operations planning in container terminals
    • Berlin et al.
    • Meisel F. Seaside operations planning in container terminals. Physica, Berlin et al., 2009.
    • (2009) Physica
    • Meisel, F.1
  • 8
    • 59049093348 scopus 로고    scopus 로고
    • An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
    • R. Tavakkoli-Moghaddam, A. Makui, S. Salahi, M. Bazzazi, and F. Taheri An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports Computers & Industrial Engineering 56 1 2009 241 248
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 241-248
    • Tavakkoli-Moghaddam, R.1    Makui, A.2    Salahi, S.3    Bazzazi, M.4    Taheri, F.5
  • 9
    • 68249120807 scopus 로고    scopus 로고
    • A fast heuristic for quay crane scheduling with interference constraints
    • C. Bierwirth, and F. Meisel A fast heuristic for quay crane scheduling with interference constraints Journal of Scheduling 12 4 2009 345 360
    • (2009) Journal of Scheduling , vol.12 , Issue.4 , pp. 345-360
    • Bierwirth, C.1    Meisel, F.2
  • 11
    • 0025436513 scopus 로고
    • A branch and bound solution method for the crane scheduling problem
    • R.I. Peterkofsky, and C.F. Daganzo A branch and bound solution method for the crane scheduling problem Transportation Research Part B 24 3 1990 159 172
    • (1990) Transportation Research Part B , vol.24 , Issue.3 , pp. 159-172
    • Peterkofsky, R.I.1    Daganzo, C.F.2
  • 14
    • 33847695719 scopus 로고    scopus 로고
    • A m-parallel crane scheduling problem with a non-crossing constraint
    • A. Lim, B. Rodrigues, and Z. Xu A m-parallel crane scheduling problem with a non-crossing constraint Naval Research Logistics 54 2 2007 115 127
    • (2007) Naval Research Logistics , vol.54 , Issue.2 , pp. 115-127
    • Lim, A.1    Rodrigues, B.2    Xu, Z.3
  • 15
    • 33751071819 scopus 로고    scopus 로고
    • Crane scheduling with non-crossing constraint
    • Y. Zhu, and A. Lim Crane scheduling with non-crossing constraint Journal of the Operational Research Society 57 12 2006 1464 1471
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.12 , pp. 1464-1471
    • Zhu, Y.1    Lim, A.2
  • 16
    • 33645678746 scopus 로고    scopus 로고
    • Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
    • J. Liu, Y.-W. Wan, and L. Wang Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures Naval Research Logistics 53 1 2006 60 74
    • (2006) Naval Research Logistics , vol.53 , Issue.1 , pp. 60-74
    • Liu, J.1    Wan, Y.-W.2    Wang, L.3
  • 17
    • 38349157814 scopus 로고    scopus 로고
    • Quay crane scheduling with handling priority in port container terminals
    • D.-H. Lee, H.Q. Wang, and L. Miao Quay crane scheduling with handling priority in port container terminals Engineering Optimization 40 2 2008 179 189
    • (2008) Engineering Optimization , vol.40 , Issue.2 , pp. 179-189
    • Lee, D.-H.1    Wang, H.Q.2    Miao, L.3
  • 18
    • 34948884022 scopus 로고    scopus 로고
    • Quay crane scheduling with non-interference constraints in port container terminals
    • D.-H. Lee, H.Q. Wang, and L. Miao Quay crane scheduling with non-interference constraints in port container terminals Transportation Research Part E 44 1 2008 124 135
    • (2008) Transportation Research Part e , vol.44 , Issue.1 , pp. 124-135
    • Lee, D.-H.1    Wang, H.Q.2    Miao, L.3
  • 25
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • R. Kolisch, A. Sprecher, and A. Drexl Characterization and generation of a general class of resource-constrained project scheduling problems Management Science 41 10 1995 1693 1703
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 27
    • 29144509760 scopus 로고    scopus 로고
    • Benchmark-problem instances for static scheduling of task graphs with communication delays on homogeneous multiprocessor systems
    • T. Davidović, and T.G. Crainic Benchmark-problem instances for static scheduling of task graphs with communication delays on homogeneous multiprocessor systems Computers Operations Research 33 8 2006 2155 2177
    • (2006) Computers Operations Research , vol.33 , Issue.8 , pp. 2155-2177
    • Davidović, T.1    Crainic, T.G.2
  • 28
    • 0035521426 scopus 로고    scopus 로고
    • Generating experimental data for computational testing with machine scheduling applications
    • N.G. Hall, and M.E. Posner Generating experimental data for computational testing with machine scheduling applications Operations Research 49 6 2001 854 865
    • (2001) Operations Research , vol.49 , Issue.6 , pp. 854-865
    • Hall, N.G.1    Posner, M.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.