메뉴 건너뛰기




Volumn 236, Issue 3, 2014, Pages 978-990

Modeling and solution of the joint quay crane and truck scheduling problem

Author keywords

Container terminal; Internal trucks; Joint scheduling problem; Particle swarm optimization; Quay cranes

Indexed keywords

AUTOMOBILES; CONTAINERS; LINEAR PROGRAMMING; OPTIMAL SYSTEMS; PARTICLE SWARM OPTIMIZATION (PSO); PORT TERMINALS; RAILROAD YARDS AND TERMINALS; SCHEDULING; SCHEDULING ALGORITHMS; TRUCKS;

EID: 84897915134     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2013.08.050     Document Type: Article
Times cited : (123)

References (23)
  • 1
    • 0037209478 scopus 로고    scopus 로고
    • A multiple-crane-constrained scheduling problem in a container terminal
    • E.K. Bish A multiple-crane-constrained scheduling problem in a container terminal European Journal of Operational Research 144 2003 83 107
    • (2003) European Journal of Operational Research , vol.144 , pp. 83-107
    • Bish, E.K.1
  • 3
    • 33847301458 scopus 로고    scopus 로고
    • A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
    • L. Chen, N. Bostel, P. Dejax, J. Cai, and L. Xi A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal European Journal of Operational Research 181 2007 40 58
    • (2007) European Journal of Operational Research , vol.181 , pp. 40-58
    • Chen, L.1    Bostel, N.2    Dejax, P.3    Cai, J.4    Xi, L.5
  • 7
    • 0031341487 scopus 로고    scopus 로고
    • A routing algorithm for a single transfer crane to load export containers onto a containership
    • K.Y. Kim, and K.H. Kim A routing algorithm for a single transfer crane to load export containers onto a containership Computers & Industrial Engineering 33 1997 673 676
    • (1997) Computers & Industrial Engineering , vol.33 , pp. 673-676
    • Kim, K.Y.1    Kim, K.H.2
  • 8
    • 0344210403 scopus 로고    scopus 로고
    • A routing algorithm for a single straddle carrier to load export containers onto a containership
    • K.Y. Kim, and K.H. Kim A routing algorithm for a single straddle carrier to load export containers onto a containership International Journal of Production Economics 59 1999 425 433
    • (1999) International Journal of Production Economics , vol.59 , pp. 425-433
    • Kim, K.Y.1    Kim, K.H.2
  • 10
    • 34948884022 scopus 로고    scopus 로고
    • Quay crane scheduling with non-interference constraints in port container terminals
    • D.H. Lee, H.Q. Wang, and L.X. Miao Quay crane scheduling with non-interference constraints in port container terminals Transportation Research Part E 44 2008 124 135
    • (2008) Transportation Research Part e , vol.44 , pp. 124-135
    • Lee, D.H.1    Wang, H.Q.2    Miao, L.X.3
  • 11
    • 33847609606 scopus 로고    scopus 로고
    • A discrete version of particle swarm optimization for flowshop scheduling problems
    • C.J. Liao, C.T. Tseng, and P. Luarn A discrete version of particle swarm optimization for flowshop scheduling problems Computers & Operations Research 34 2007 3099 3111
    • (2007) Computers & Operations Research , vol.34 , pp. 3099-3111
    • Liao, C.J.1    Tseng, C.T.2    Luarn, P.3
  • 12
    • 1642370757 scopus 로고    scopus 로고
    • Loading and unloading operations in container terminals
    • C.L. Li, and G.L. Vairaktarakis Loading and unloading operations in container terminals IIE Transactions 36 2004 287 297
    • (2004) IIE Transactions , vol.36 , pp. 287-297
    • Li, C.L.1    Vairaktarakis, G.L.2
  • 14
    • 33645678746 scopus 로고    scopus 로고
    • Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
    • J. Liu, Y.-w. Wan, and L. Wang Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures Naval Research Logistics 53 2006 60 74
    • (2006) Naval Research Logistics , vol.53 , pp. 60-74
    • Liu, J.1    Wang, L.2
  • 15
    • 70349299946 scopus 로고    scopus 로고
    • A hybrid multi-swarm particle swarm optimization algorithm for the probabilistic traveling salesman problem
    • Y. Marinakis, and M. Marinaki A hybrid multi-swarm particle swarm optimization algorithm for the probabilistic traveling salesman problem Computers & Operations Research 37 2010 432 442
    • (2010) Computers & Operations Research , vol.37 , pp. 432-442
    • Marinakis, Y.1    Marinaki, M.2
  • 16
    • 10444233579 scopus 로고    scopus 로고
    • Crane scheduling in container yards with inter-crane interference
    • W.C. Ng Crane scheduling in container yards with inter-crane interference European Journal of Operational Research 164 2005 64 78
    • (2005) European Journal of Operational Research , vol.164 , pp. 64-78
    • Ng, W.C.1
  • 22
    • 77954417812 scopus 로고    scopus 로고
    • An improved genetic algorithm and its blending application with neural network
    • Yan, T. (2010). An improved genetic algorithm and its blending application with neural network. In Proceeding of intelligent systems and application (pp. 1-4).
    • (2010) Proceeding of Intelligent Systems and Application , pp. 1-4
    • Yan, T.1
  • 23
    • 0036643291 scopus 로고    scopus 로고
    • Dynamic crane deployment in container storage yards
    • C.Q. Zhang, Y.-w. Wan, J. Liu, and R.J. Linn Dynamic crane deployment in container storage yards Transportation Research Part B 36 2002 537 555g
    • (2002) Transportation Research Part B , vol.36 , pp. 537-555
    • Zhang, C.Q.1    Liu, J.2    Linn, R.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.