-
1
-
-
68249120807
-
A fast heuristic for quay crane scheduling with interference constraints
-
C. Bierwirth, and F. Meisel A fast heuristic for quay crane scheduling with interference constraints Journal of Scheduling 12 2009 345 360
-
(2009)
Journal of Scheduling
, vol.12
, pp. 345-360
-
-
Bierwirth, C.1
Meisel, F.2
-
2
-
-
70350568773
-
A survey of berth allocation and quay crane scheduling problems in container terminals
-
C. Bierwirth, and F. Meisel A survey of berth allocation and quay crane scheduling problems in container terminals European Journal of Operational Research 202 2010 615 627
-
(2010)
European Journal of Operational Research
, vol.202
, pp. 615-627
-
-
Bierwirth, C.1
Meisel, F.2
-
3
-
-
82255192312
-
A modified genetic algorithm for quay crane scheduling operations
-
S.H. Chung, and K.L. Choy A modified genetic algorithm for quay crane scheduling operations Expert Systems with Applications 39 2012 4213 4221
-
(2012)
Expert Systems with Applications
, vol.39
, pp. 4213-4221
-
-
Chung, S.H.1
Choy, K.L.2
-
6
-
-
0025436513
-
A branch and bound solution method for the crane scheduling problem
-
R.I. Peterkofsky, and C.F. Daganzo A branch and bound solution method for the crane scheduling problem Transportation Research Part B 24 1990 159 172
-
(1990)
Transportation Research Part B
, vol.24
, pp. 159-172
-
-
Peterkofsky, R.I.1
Daganzo, C.F.2
-
7
-
-
69249230791
-
Berth scheduling by customer service differentiation- A multi-objective approach
-
M.M. Golias, M. Boile, and S. Theofanis Berth scheduling by customer service differentiation- A multi-objective approach Transportation Research Part E 45 2009 878 892
-
(2009)
Transportation Research Part e
, vol.45
, pp. 878-892
-
-
Golias, M.M.1
Boile, M.2
Theofanis, S.3
-
8
-
-
74249120918
-
A hybrid parallel genetic algorithm for yard crane scheduling
-
J. He, D. Chang, W. Mi, and W. Yan A hybrid parallel genetic algorithm for yard crane scheduling Transportation Research Part E 46 2010 136 155
-
(2010)
Transportation Research Part e
, vol.46
, pp. 136-155
-
-
He, J.1
Chang, D.2
Mi, W.3
Yan, W.4
-
10
-
-
34948884022
-
Quay crane scheduling with noninterference constraints in port container terminals
-
D.H. Lee, H.Q. Wang, and L. Miao Quay crane scheduling with noninterference constraints in port container terminals Transportation Research Part E 44 2006 124 135
-
(2006)
Transportation Research Part e
, vol.44
, pp. 124-135
-
-
Lee, D.H.1
Wang, H.Q.2
Miao, L.3
-
12
-
-
0003892288
-
-
Version 7.13.0.564 (R2011b). The MathWorks, Inc
-
Matlab Users Guide, 2011, Version 7.13.0.564 (R2011b). The MathWorks, Inc.
-
(2011)
Matlab Users Guide
-
-
-
13
-
-
77957307373
-
A unified approach for the evaluation of quay crane scheduling models and algorithms
-
F. Meisel, and C. Bierwirth A unified approach for the evaluation of quay crane scheduling models and algorithms Computers & Operations Research 38 2011 683 693
-
(2011)
Computers & Operations Research
, vol.38
, pp. 683-693
-
-
Meisel, F.1
Bierwirth, C.2
-
14
-
-
33645693040
-
A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
-
L. Moccia, J.F. Cordeau, M. Gaudioso, and G. Laporte A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal Naval Research Logistics 53 2006 45 59
-
(2006)
Naval Research Logistics
, vol.53
, pp. 45-59
-
-
Moccia, L.1
Cordeau, J.F.2
Gaudioso, M.3
Laporte, G.4
-
15
-
-
33745586759
-
Quay crane scheduling in container terminals
-
DOI 10.1080/03052150600691038, PII H575056282370719
-
W.C. Ng, and K.L. Mak Quay crane scheduling in container terminals Engineering Optimization 38 2006 723 737 (Pubitemid 43982685)
-
(2006)
Engineering Optimization
, vol.38
, Issue.6
, pp. 723-737
-
-
Ng, W.C.1
Mak, K.L.2
-
16
-
-
33845675385
-
Scheduling trucks in container terminals using a genetic algorithm
-
DOI 10.1080/03052150600917128, PII N3T243G486251744
-
W.C. Ng, K.L. Mak, and Y.X. Zhang Scheduling trucks in container terminals using a genetic algorithm Engineering Optimization 39 2007 33 47 (Pubitemid 44956294)
-
(2007)
Engineering Optimization
, vol.39
, Issue.1
, pp. 33-47
-
-
Ng, W.C.1
Mak, K.L.2
Zhang, Y.X.3
-
17
-
-
34848836641
-
A tabu search heuristic for the quay crane scheduling problem
-
DOI 10.1007/s10951-007-0029-5
-
M. Sammarra, J.F. Cordeau, G. Laporte, and M.F. Monaco A tabu search heuristic for the quay crane scheduling problem Journal of Scheduling 10 2007 327 336 (Pubitemid 47501054)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.4-5
, pp. 327-336
-
-
Sammarra, M.1
Cordeau, J.-F.2
Laporte, G.3
Monaco, M.F.4
-
18
-
-
36248971841
-
Operations research at container terminals -A literature update
-
R. Stahlbock, and S. Voß Operations research at container terminals-a literature update OR Spectrum 30 2008 1 52
-
(2008)
OR Spectrum
, vol.30
, pp. 1-52
-
-
Stahlbock, R.1
Voß, S.2
-
19
-
-
17444364075
-
Container terminal operation and operations research - A classification and literature review
-
DOI 10.1007/s00291-003-0157-z
-
D. Steenken, S. Voß, and R. Stahlbock Container terminal operation and operations research-a classification and literature review OR Spectrum 26 2004 3 49 (Pubitemid 40549578)
-
(2004)
OR Spectrum
, vol.26
, Issue.1
, pp. 3-49
-
-
Steenken, D.1
Voss, S.2
Stahlbock, R.3
-
20
-
-
59049093348
-
An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
-
R. Tavakkoli-Moghaddam, A. Makui, S. Salahi, M. Bazzazi, and F. Taheri An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports Computers & Industrial Engineering 56 2009 241 248
-
(2009)
Computers & Industrial Engineering
, vol.56
, pp. 241-248
-
-
Tavakkoli-Moghaddam, R.1
Makui, A.2
Salahi, S.3
Bazzazi, M.4
Taheri, F.5
|