메뉴 건너뛰기




Volumn 32, Issue 3, 2010, Pages 569-591

Container sequencing for quay cranes with internal reshuffles

Author keywords

Container sequencing problem; Container terminal; Double cycling; GRASP; Internal reshuffle

Indexed keywords


EID: 77953540653     PISSN: 01716468     EISSN: 14366304     Source Type: Journal    
DOI: 10.1007/s00291-009-0191-6     Document Type: Article
Times cited : (61)

References (26)
  • 1
    • 1842588864 scopus 로고    scopus 로고
    • Impact of yard organisation on the master bay planning problem
    • Ambrosino D, Sciomachen A (2003) Impact of yard organisation on the master bay planning problem. Marit Econ Logist 5(3): 285-300.
    • (2003) Marit Econ Logist , vol.5 , Issue.3 , pp. 285-300
    • Ambrosino, D.1    Sciomachen, A.2
  • 2
    • 0347653306 scopus 로고    scopus 로고
    • Stowing a containership: The master bay plan problem
    • Ambrosino D, Sciomachen A, Tanfani E (2004) Stowing a containership: the master bay plan problem. Transp Res A 38(2): 81-99.
    • (2004) Transp Res A , vol.38 , Issue.2 , pp. 81-99
    • Ambrosino, D.1    Sciomachen, A.2    Tanfani, E.3
  • 3
    • 0000407246 scopus 로고
    • Exact and approximate solutions of the container ship stowage problem
    • Avriel M, Penn M (1993) Exact and approximate solutions of the container ship stowage problem. Comput Ind Eng 25(1-4): 271-274.
    • (1993) Comput Ind Eng , vol.25 , Issue.1-4 , pp. 271-274
    • Avriel, M.1    Penn, M.2
  • 4
    • 0030465854 scopus 로고    scopus 로고
    • Hatchcoverless container ships: Productivity gains from a new technology
    • Bendall HB, Stent AF (1996) Hatchcoverless container ships: productivity gains from a new technology. Marit Policy Manage 23(2): 187-199.
    • (1996) Marit Policy Manage , vol.23 , Issue.2 , pp. 187-199
    • Bendall, H.B.1    Stent, A.F.2
  • 5
    • 68249120807 scopus 로고    scopus 로고
    • A fast heuristic for quay crane scheduling with interference constraints
    • Bierwirth C, Meisel F (2009) A fast heuristic for quay crane scheduling with interference constraints. J Sched 12(4): 345-360.
    • (2009) J Sched , vol.12 , Issue.4 , pp. 345-360
    • Bierwirth, C.1    Meisel, F.2
  • 6
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • Bierwirth C, Meisel F (2010) A survey of berth allocation and quay crane scheduling problems in container terminals. Eur J Oper Res 202(3): 615-627.
    • (2010) Eur J Oper Res , vol.202 , Issue.3 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 7
    • 77953538365 scopus 로고    scopus 로고
    • Caserta M, Schwarze S, Voß S (2008) A mathematical formulation for the blocks relocation problem. Working paper, University of Hamburg.
  • 8
    • 0036804511 scopus 로고    scopus 로고
    • Aggregates cranes handling capacity of container terminals: The port of kaohsiung
    • Chu C-Y, Huang W-C (2002) Aggregates cranes handling capacity of container terminals: the port of kaohsiung. Marit Policy Manage 29(4): 341-350.
    • (2002) Marit Policy Manage , vol.29 , Issue.4 , pp. 341-350
    • Chu, C.-Y.1    Huang, W.-C.2
  • 9
    • 0024686408 scopus 로고
    • The crane scheduling problem
    • Daganzo CF (1989) The crane scheduling problem. Transp Res B 23(3): 159-175.
    • (1989) Transp Res B , vol.23 , Issue.3 , pp. 159-175
    • Daganzo, C.F.1
  • 10
    • 33751017964 scopus 로고    scopus 로고
    • Double-cycling strategies for container ships and their effect on ship loading and unloading operations
    • Goodchild AV, Daganzo CF (2006) Double-cycling strategies for container ships and their effect on ship loading and unloading operations. Transp Sci 40(4): 473-483.
    • (2006) Transp Sci , vol.40 , Issue.4 , pp. 473-483
    • Goodchild, A.V.1    Daganzo, C.F.2
  • 11
    • 34250626149 scopus 로고    scopus 로고
    • Crane double cycling in container ports: Planning methods and evaluation
    • Goodchild AV, Daganzo CF (2007) Crane double cycling in container ports: planning methods and evaluation. Transp Res B 41(8): 875-891.
    • (2007) Transp Res B , vol.41 , Issue.8 , pp. 875-891
    • Goodchild, A.V.1    Daganzo, C.F.2
  • 13
    • 28244459676 scopus 로고    scopus 로고
    • Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks
    • Imai A, Sasaki K, Nishimura E, Papadimitriou S (2006) Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks. Eur J Oper Res 171(2): 373-389.
    • (2006) Eur J Oper Res , vol.171 , Issue.2 , pp. 373-389
    • Imai, A.1    Sasaki, K.2    Nishimura, E.3    Papadimitriou, S.4
  • 14
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times
    • Johnson SM (1954) Optimal two- and three-stage production schedules with setup times. Nav Res Logist Q 1(1): 61-68.
    • (1954) Nav Res Logist Q , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 15
    • 0036531701 scopus 로고    scopus 로고
    • Stowage planning in maritime container transportation
    • Kang J-G, Kim Y-D (2002) Stowage planning in maritime container transportation. J Oper Res Soc 53(4): 415-426.
    • (2002) J Oper Res Soc , vol.53 , Issue.4 , pp. 415-426
    • Kang, J.-G.1    Kim, Y.-D.2
  • 16
    • 27144527849 scopus 로고    scopus 로고
    • A heuristic rule for relocating blocks
    • Kim KH, Hong G-P (2006) A heuristic rule for relocating blocks. Comput Oper Res 33(4): 940-954.
    • (2006) Comput Oper Res , vol.33 , Issue.4 , pp. 940-954
    • Kim, K.H.1    Hong, G.-P.2
  • 17
    • 17444425276 scopus 로고    scopus 로고
    • A beam search algorithm for the load sequencing of outbound containers in port container terminals
    • Kim KH, Kang JS, Ryu KR (2004) A beam search algorithm for the load sequencing of outbound containers in port container terminals. OR Spectr 26(1): 93-116.
    • (2004) OR Spectr , vol.26 , Issue.1 , pp. 93-116
    • Kim, K.H.1    Kang, J.S.2    Ryu, K.R.3
  • 18
    • 1642618965 scopus 로고    scopus 로고
    • A crane scheduling method for port container terminals
    • Kim KH, Park YM (2004) A crane scheduling method for port container terminals. Eur J Oper Res 156(3): 752-768.
    • (2004) Eur J Oper Res , vol.156 , Issue.3 , pp. 752-768
    • Kim, K.H.1    Park, Y.M.2
  • 19
    • 33847695719 scopus 로고    scopus 로고
    • A m-parallel crane scheduling problem with a non-crossing constraint
    • Lim A, Rodrigues B, Xu Z (2007) A m-parallel crane scheduling problem with a non-crossing constraint. Nav Res Logist 54(2): 115-127.
    • (2007) Nav Res Logist , vol.54 , Issue.2 , pp. 115-127
    • Lim, A.1    Rodrigues, B.2    Xu, Z.3
  • 20
    • 33645678746 scopus 로고    scopus 로고
    • Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
    • Liu J, Wan Y-W, Wang L (2006) Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures. Nav Res Logist 53(1): 60-74.
    • (2006) Nav Res Logist , vol.53 , Issue.1 , pp. 60-74
    • Liu, J.1    Wan, Y.-W.2    Wang, L.3
  • 21
    • 33645693040 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    • Moccia L, Cordeau J-F, Gaudioso M, Laporte G (2006) A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal. Nav Res Logist 53(1): 45-59.
    • (2006) Nav Res Logist , vol.53 , Issue.1 , pp. 45-59
    • Moccia, L.1    Cordeau, J.-F.2    Gaudioso, M.3    Laporte, G.4
  • 22
    • 77953540179 scopus 로고    scopus 로고
    • Resende MGC, Ribeiro CC (2003) Greedy randomized adaptive search procedures. In: Glover F, Kochenberger G (eds) Handbook of Metaheuristics. Kluwer, Dordrecht, pp 219-249.
  • 23
    • 34848836641 scopus 로고    scopus 로고
    • A tabu search heuristic for the quay crane scheduling problem
    • Sammarra M, Cordeau J-F, Laporte G, Monaco MF (2007) A tabu search heuristic for the quay crane scheduling problem. J Sched 10(4-5): 327-336.
    • (2007) J Sched , vol.10 , Issue.4-5 , pp. 327-336
    • Sammarra, M.1    Cordeau, J.-F.2    Laporte, G.3    Monaco, M.F.4
  • 24
    • 36248971841 scopus 로고    scopus 로고
    • Operations research at container terminals: A literature update
    • Stahlbock R, Voß S (2008) Operations research at container terminals: a literature update. OR Spectr 30(1): 1-52.
    • (2008) OR Spectr , vol.30 , Issue.1 , pp. 1-52
    • Stahlbock, R.1    Voß, S.2
  • 25
    • 60549109062 scopus 로고    scopus 로고
    • Maximizing the number of dual-cycle operations of quay cranes in container terminals
    • Zhang H, Kim KH (2009) Maximizing the number of dual-cycle operations of quay cranes in container terminals. Comput Indust Eng 56(3): 979-992.
    • (2009) Comput Indust Eng , vol.56 , Issue.3 , pp. 979-992
    • Zhang, H.1    Kim, K.H.2
  • 26
    • 33751071819 scopus 로고    scopus 로고
    • Crane scheduling with non-crossing constraint
    • Zhu Y, Lim A (2006) Crane scheduling with non-crossing constraint. J Oper Res Soc 57(12): 1464-1471.
    • (2006) J Oper Res Soc , vol.57 , Issue.12 , pp. 1464-1471
    • Zhu, Y.1    Lim, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.