-
1
-
-
1842588864
-
Impact of yard organisation on the master bay planning problem
-
Ambrosino D, Sciomachen A (2003) Impact of yard organisation on the master bay planning problem. Marit Econ Logist 5(3): 285-300.
-
(2003)
Marit Econ Logist
, vol.5
, Issue.3
, pp. 285-300
-
-
Ambrosino, D.1
Sciomachen, A.2
-
2
-
-
0347653306
-
Stowing a containership: The master bay plan problem
-
Ambrosino D, Sciomachen A, Tanfani E (2004) Stowing a containership: the master bay plan problem. Transp Res A 38(2): 81-99.
-
(2004)
Transp Res A
, vol.38
, Issue.2
, pp. 81-99
-
-
Ambrosino, D.1
Sciomachen, A.2
Tanfani, E.3
-
3
-
-
0000407246
-
Exact and approximate solutions of the container ship stowage problem
-
Avriel M, Penn M (1993) Exact and approximate solutions of the container ship stowage problem. Comput Ind Eng 25(1-4): 271-274.
-
(1993)
Comput Ind Eng
, vol.25
, Issue.1-4
, pp. 271-274
-
-
Avriel, M.1
Penn, M.2
-
4
-
-
0030465854
-
Hatchcoverless container ships: Productivity gains from a new technology
-
Bendall HB, Stent AF (1996) Hatchcoverless container ships: productivity gains from a new technology. Marit Policy Manage 23(2): 187-199.
-
(1996)
Marit Policy Manage
, vol.23
, Issue.2
, pp. 187-199
-
-
Bendall, H.B.1
Stent, A.F.2
-
5
-
-
68249120807
-
A fast heuristic for quay crane scheduling with interference constraints
-
Bierwirth C, Meisel F (2009) A fast heuristic for quay crane scheduling with interference constraints. J Sched 12(4): 345-360.
-
(2009)
J Sched
, vol.12
, Issue.4
, pp. 345-360
-
-
Bierwirth, C.1
Meisel, F.2
-
6
-
-
70350568773
-
A survey of berth allocation and quay crane scheduling problems in container terminals
-
Bierwirth C, Meisel F (2010) A survey of berth allocation and quay crane scheduling problems in container terminals. Eur J Oper Res 202(3): 615-627.
-
(2010)
Eur J Oper Res
, vol.202
, Issue.3
, pp. 615-627
-
-
Bierwirth, C.1
Meisel, F.2
-
7
-
-
77953538365
-
-
Caserta M, Schwarze S, Voß S (2008) A mathematical formulation for the blocks relocation problem. Working paper, University of Hamburg.
-
-
-
-
8
-
-
0036804511
-
Aggregates cranes handling capacity of container terminals: The port of kaohsiung
-
Chu C-Y, Huang W-C (2002) Aggregates cranes handling capacity of container terminals: the port of kaohsiung. Marit Policy Manage 29(4): 341-350.
-
(2002)
Marit Policy Manage
, vol.29
, Issue.4
, pp. 341-350
-
-
Chu, C.-Y.1
Huang, W.-C.2
-
9
-
-
0024686408
-
The crane scheduling problem
-
Daganzo CF (1989) The crane scheduling problem. Transp Res B 23(3): 159-175.
-
(1989)
Transp Res B
, vol.23
, Issue.3
, pp. 159-175
-
-
Daganzo, C.F.1
-
10
-
-
33751017964
-
Double-cycling strategies for container ships and their effect on ship loading and unloading operations
-
Goodchild AV, Daganzo CF (2006) Double-cycling strategies for container ships and their effect on ship loading and unloading operations. Transp Sci 40(4): 473-483.
-
(2006)
Transp Sci
, vol.40
, Issue.4
, pp. 473-483
-
-
Goodchild, A.V.1
Daganzo, C.F.2
-
11
-
-
34250626149
-
Crane double cycling in container ports: Planning methods and evaluation
-
Goodchild AV, Daganzo CF (2007) Crane double cycling in container ports: planning methods and evaluation. Transp Res B 41(8): 875-891.
-
(2007)
Transp Res B
, vol.41
, Issue.8
, pp. 875-891
-
-
Goodchild, A.V.1
Daganzo, C.F.2
-
12
-
-
0345988754
-
The containership loading problem
-
Imai A, Nishimura E, Papadimitriou S, Sasaki K (2002) The containership loading problem. Int J Marit Econ 4(2): 126-148.
-
(2002)
Int J Marit Econ
, vol.4
, Issue.2
, pp. 126-148
-
-
Imai, A.1
Nishimura, E.2
Papadimitriou, S.3
Sasaki, K.4
-
13
-
-
28244459676
-
Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks
-
Imai A, Sasaki K, Nishimura E, Papadimitriou S (2006) Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks. Eur J Oper Res 171(2): 373-389.
-
(2006)
Eur J Oper Res
, vol.171
, Issue.2
, pp. 373-389
-
-
Imai, A.1
Sasaki, K.2
Nishimura, E.3
Papadimitriou, S.4
-
14
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times
-
Johnson SM (1954) Optimal two- and three-stage production schedules with setup times. Nav Res Logist Q 1(1): 61-68.
-
(1954)
Nav Res Logist Q
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
15
-
-
0036531701
-
Stowage planning in maritime container transportation
-
Kang J-G, Kim Y-D (2002) Stowage planning in maritime container transportation. J Oper Res Soc 53(4): 415-426.
-
(2002)
J Oper Res Soc
, vol.53
, Issue.4
, pp. 415-426
-
-
Kang, J.-G.1
Kim, Y.-D.2
-
16
-
-
27144527849
-
A heuristic rule for relocating blocks
-
Kim KH, Hong G-P (2006) A heuristic rule for relocating blocks. Comput Oper Res 33(4): 940-954.
-
(2006)
Comput Oper Res
, vol.33
, Issue.4
, pp. 940-954
-
-
Kim, K.H.1
Hong, G.-P.2
-
17
-
-
17444425276
-
A beam search algorithm for the load sequencing of outbound containers in port container terminals
-
Kim KH, Kang JS, Ryu KR (2004) A beam search algorithm for the load sequencing of outbound containers in port container terminals. OR Spectr 26(1): 93-116.
-
(2004)
OR Spectr
, vol.26
, Issue.1
, pp. 93-116
-
-
Kim, K.H.1
Kang, J.S.2
Ryu, K.R.3
-
18
-
-
1642618965
-
A crane scheduling method for port container terminals
-
Kim KH, Park YM (2004) A crane scheduling method for port container terminals. Eur J Oper Res 156(3): 752-768.
-
(2004)
Eur J Oper Res
, vol.156
, Issue.3
, pp. 752-768
-
-
Kim, K.H.1
Park, Y.M.2
-
19
-
-
33847695719
-
A m-parallel crane scheduling problem with a non-crossing constraint
-
Lim A, Rodrigues B, Xu Z (2007) A m-parallel crane scheduling problem with a non-crossing constraint. Nav Res Logist 54(2): 115-127.
-
(2007)
Nav Res Logist
, vol.54
, Issue.2
, pp. 115-127
-
-
Lim, A.1
Rodrigues, B.2
Xu, Z.3
-
20
-
-
33645678746
-
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
-
Liu J, Wan Y-W, Wang L (2006) Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures. Nav Res Logist 53(1): 60-74.
-
(2006)
Nav Res Logist
, vol.53
, Issue.1
, pp. 60-74
-
-
Liu, J.1
Wan, Y.-W.2
Wang, L.3
-
21
-
-
33645693040
-
A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
-
Moccia L, Cordeau J-F, Gaudioso M, Laporte G (2006) A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal. Nav Res Logist 53(1): 45-59.
-
(2006)
Nav Res Logist
, vol.53
, Issue.1
, pp. 45-59
-
-
Moccia, L.1
Cordeau, J.-F.2
Gaudioso, M.3
Laporte, G.4
-
22
-
-
77953540179
-
-
Resende MGC, Ribeiro CC (2003) Greedy randomized adaptive search procedures. In: Glover F, Kochenberger G (eds) Handbook of Metaheuristics. Kluwer, Dordrecht, pp 219-249.
-
-
-
-
23
-
-
34848836641
-
A tabu search heuristic for the quay crane scheduling problem
-
Sammarra M, Cordeau J-F, Laporte G, Monaco MF (2007) A tabu search heuristic for the quay crane scheduling problem. J Sched 10(4-5): 327-336.
-
(2007)
J Sched
, vol.10
, Issue.4-5
, pp. 327-336
-
-
Sammarra, M.1
Cordeau, J.-F.2
Laporte, G.3
Monaco, M.F.4
-
24
-
-
36248971841
-
Operations research at container terminals: A literature update
-
Stahlbock R, Voß S (2008) Operations research at container terminals: a literature update. OR Spectr 30(1): 1-52.
-
(2008)
OR Spectr
, vol.30
, Issue.1
, pp. 1-52
-
-
Stahlbock, R.1
Voß, S.2
-
25
-
-
60549109062
-
Maximizing the number of dual-cycle operations of quay cranes in container terminals
-
Zhang H, Kim KH (2009) Maximizing the number of dual-cycle operations of quay cranes in container terminals. Comput Indust Eng 56(3): 979-992.
-
(2009)
Comput Indust Eng
, vol.56
, Issue.3
, pp. 979-992
-
-
Zhang, H.1
Kim, K.H.2
-
26
-
-
33751071819
-
Crane scheduling with non-crossing constraint
-
Zhu Y, Lim A (2006) Crane scheduling with non-crossing constraint. J Oper Res Soc 57(12): 1464-1471.
-
(2006)
J Oper Res Soc
, vol.57
, Issue.12
, pp. 1464-1471
-
-
Zhu, Y.1
Lim, A.2
|