메뉴 건너뛰기




Volumn 9, Issue 2, 2015, Pages 403-412

Scheduling small number of quay cranes with non-interference constraint

Author keywords

Approximation algorithm; Container port; Quay crane; Scheduling

Indexed keywords

APPROXIMATION ALGORITHMS; CONTAINERS; CRANES; PORTS AND HARBORS; RAILROAD YARDS AND TERMINALS; SCHEDULING;

EID: 84922337729     PISSN: 18624472     EISSN: 18624480     Source Type: Journal    
DOI: 10.1007/s11590-014-0756-4     Document Type: Article
Times cited : (16)

References (16)
  • 1
    • 1842588864 scopus 로고    scopus 로고
    • Impact of yard organization on the master bay planning problem
    • Ambrosino, D., Sciomachen, A.: Impact of yard organization on the master bay planning problem. Mariti. Econ. Logist. 5, 285–300 (2003)
    • (2003) Mariti. Econ. Logist , vol.5 , pp. 285-300
    • Ambrosino, D.1    Sciomachen, A.2
  • 2
    • 0000407246 scopus 로고
    • Exact and approximate solutions of the container ship stowage problem
    • Avriel, M., Penn, M.: Exact and approximate solutions of the container ship stowage problem. Comput. Ind. Eng. 25, 271–274 (1993)
    • (1993) Comput. Ind. Eng , vol.25 , pp. 271-274
    • Avriel, M.1    Penn, M.2
  • 3
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • Bierwirth, C., Meisel, F.: A survey of berth allocation and quay crane scheduling problems in container terminals. Eur. J. Op. Res. 202, 615–627 (2010)
    • (2010) Eur. J. Op. Res , vol.202 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 5
    • 33751017964 scopus 로고    scopus 로고
    • Double-cycling strategies for container ships and their effect on ship loading and unloading operations
    • Goodchild, A.V., Daganzo, C.F.: Double-cycling strategies for container ships and their effect on ship loading and unloading operations. Transp. Sci. 40, 473–483 (2006)
    • (2006) Transp. Sci , vol.40 , pp. 473-483
    • Goodchild, A.V.1    Daganzo, C.F.2
  • 6
    • 28244459676 scopus 로고    scopus 로고
    • Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks
    • Imai, A., Sasaki, K., Nishimura, E., Papadimitriou, S.: Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks. Eur. J. Oper. Res. 171, 373–389 (2006)
    • (2006) Eur. J. Oper. Res , vol.171 , pp. 373-389
    • Imai, A.1    Sasaki, K.2    Nishimura, E.3    Papadimitriou, S.4
  • 7
    • 0036531701 scopus 로고    scopus 로고
    • Stowage planning in maritime container transportation
    • Kang, J.G., Kim, Y.D.: Stowage planning in maritime container transportation. J. Oper. Res. Soc. 53, 415–426 (2002)
    • (2002) J. Oper. Res. Soc , vol.53 , pp. 415-426
    • Kang, J.G.1    Kim, Y.D.2
  • 8
    • 77951130205 scopus 로고    scopus 로고
    • An improved approach for quay crane scheduling with non-crossing constraints
    • Lee, D.H., Chen, J.H.: An improved approach for quay crane scheduling with non-crossing constraints. Eng. Optim. 42, 1–15 (2010)
    • (2010) Eng. Optim , vol.42 , pp. 1-15
    • Lee, D.H.1    Chen, J.H.2
  • 9
    • 84922338343 scopus 로고    scopus 로고
    • An approximation algorithm for quay crane scheduling with non-interference constraints in port container terminals, Presented at Tristan VI, Phuket
    • Lee D.H., Wang H.Q., Miao L.: An approximation algorithm for quay crane scheduling with non-interference constraints in port container terminals, Presented at Tristan VI, Phuket, June 10–15 (2007)
    • (2007) June , pp. 10-15
    • Lee, D.H.1    Wang, H.Q.2    Miao, L.3
  • 10
    • 34948884022 scopus 로고    scopus 로고
    • Quay crane scheduling with non-interference constraints in port container terminals
    • Lee, D.H., Wang, H.Q., Miao, L.: Quay crane scheduling with non-interference constraints in port container terminals. Transp. Res. Part E 44, 124–135 (2008)
    • (2008) Transp. Res. Part E , vol.44 , pp. 124-135
    • Lee, D.H.1    Wang, H.Q.2    Miao, L.3
  • 12
    • 33847695719 scopus 로고    scopus 로고
    • A m-parallel crane scheduling problem with a non-crossing constraint
    • Lim, A., Rodrigues, B., Xu, Z.: A m-parallel crane scheduling problem with a non-crossing constraint. Nav. Res. Logist. 54, 115–127 (2007)
    • (2007) Nav. Res. Logist , vol.54 , pp. 115-127
    • Lim, A.1    Rodrigues, B.2    Xu, Z.3
  • 13
    • 77953540653 scopus 로고    scopus 로고
    • Container sequencing for quay cranes with internal reshuffles
    • Meisel, F., Wichmann, M.: Container sequencing for quay cranes with internal reshuffles. OR Spectr. 32, 569–591 (2010)
    • (2010) OR Spectr , vol.32 , pp. 569-591
    • Meisel, F.1    Wichmann, M.2
  • 14
    • 36248971841 scopus 로고    scopus 로고
    • Operations research at container terminals: a literature update
    • Stahlbock, R., Voß, S.: Operations research at container terminals: a literature update. OR Spectr. 30, 1–52 (2008)
    • (2008) OR Spectr , vol.30 , pp. 1-52
    • Stahlbock, R.1    Voß, S.2
  • 15
    • 84922339397 scopus 로고    scopus 로고
    • United Nations
    • UNCTAD, Review of maritime transport 2012, United Nations, New York and Geneva (2012)
    • (2012) New York and Geneva (2012)
  • 16
    • 60549109062 scopus 로고    scopus 로고
    • Maximizing the number of dual-cycle operations of quay cranes in container terminals
    • Zhang, H., Kim, K.H.: Maximizing the number of dual-cycle operations of quay cranes in container terminals. Comput. Ind. Eng. 56, 979–992 (2009)
    • (2009) Comput. Ind. Eng , vol.56 , pp. 979-992
    • Zhang, H.1    Kim, K.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.