메뉴 건너뛰기




Volumn 39, Issue 12, 2012, Pages 2915-2928

A heuristic for the quay crane scheduling problem based on contiguous bay crane operations

Author keywords

Container terminal operation; Quay crane scheduling

Indexed keywords

COMPLETION TIME; CONTAINER HANDLING; CONTAINER TERMINAL; CONTAINER TERMINAL OPERATION; CRANE OPERATIONS; INTERFERENCE CONSTRAINTS; NUMERICAL EXPERIMENTS; OPTIMAL COMPLETION; OPTIMALITY; QUAY CRANE SCHEDULING; QUAY CRANES; TERMINAL PRODUCTIVITY; WORK ACTIVITIES;

EID: 84863007229     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2012.02.013     Document Type: Article
Times cited : (44)

References (20)
  • 1
    • 36248971841 scopus 로고    scopus 로고
    • Operations research at container terminals: A literature update
    • R. Stahlbock, and S. Voß Operations research at container terminals: a literature update OR Spectrum 30 1 2008 1 52
    • (2008) OR Spectrum , vol.30 , Issue.1 , pp. 1-52
    • Stahlbock, R.1    Voß, S.2
  • 2
    • 70350572638 scopus 로고    scopus 로고
    • Optimization at container terminals: Status, trends and perspectives
    • I. Vacca, M. Bierlaire, and M. Salani Optimization at container terminals: status, trends and perspectives Citeseer 2007 12 14
    • (2007) Citeseer , pp. 12-14
    • Vacca, I.1    Bierlaire, M.2    Salani, M.3
  • 3
    • 0037449049 scopus 로고    scopus 로고
    • Transshipment of containers at a container terminal: An overview
    • I.F.A. Vis, and R. de Koster Transshipment of containers at a container terminal: an overview European Journal of Operational Research 147 1 2003 1 16
    • (2003) European Journal of Operational Research , vol.147 , Issue.1 , pp. 1-16
    • Vis, I.F.A.1    De Koster, R.2
  • 4
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • C. Bierwirth, and F. Meisel A survey of berth allocation and quay crane scheduling problems in container terminals European Journal of Operational Research 202 3 2010 615 627
    • (2010) European Journal of Operational Research , vol.202 , Issue.3 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 6
    • 0025436513 scopus 로고
    • A branch and bound solution method for the crane scheduling problem
    • R.I. Peterkofsky, and C.F. Daganzo A branch and bound solution method for the crane scheduling problem Transportation Research Part B. 24 3 1990 159 172
    • (1990) Transportation Research Part B. , vol.24 , Issue.3 , pp. 159-172
    • Peterkofsky, R.I.1    Daganzo, C.F.2
  • 7
    • 17444364075 scopus 로고    scopus 로고
    • Container terminal operation and operations research - A classification and literature review
    • DOI 10.1007/s00291-003-0157-z
    • D. Steenken, S. Voß, and R. Stahlbock Container terminal operation and operations research - a classification and literature review OR Spectrum 26 1 2004 3 49 (Pubitemid 40549578)
    • (2004) OR Spectrum , vol.26 , Issue.1 , pp. 3-49
    • Steenken, D.1    Voss, S.2    Stahlbock, R.3
  • 9
    • 33847695719 scopus 로고    scopus 로고
    • A m-parallel crane scheduling problem with a non-crossing constraint
    • DOI 10.1002/nav.20189
    • A. Lim, B. Rodrigues, and Z.A. Xu M-parallel crane scheduling problem with a non-crossing constraint Naval Research Logistics 54 2 2007 115 127 (Pubitemid 46383203)
    • (2007) Naval Research Logistics , vol.54 , Issue.2 , pp. 115-127
    • Lim, A.1    Rodrigues, B.2    Xu, Z.3
  • 10
    • 38349157814 scopus 로고    scopus 로고
    • Quay crane scheduling with handling priority in port container terminals
    • D.H. Lee, H.Q. Wang, and L. Miao Quay crane scheduling with handling priority in port container terminals Engineering Optimization 40 2 2008 179 189
    • (2008) Engineering Optimization , vol.40 , Issue.2 , pp. 179-189
    • Lee, D.H.1    Wang, H.Q.2    Miao, L.3
  • 11
    • 33645678746 scopus 로고    scopus 로고
    • Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
    • J. Liu, Y.W. Wan, and L. Wang Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures Naval Research Logistics 53 1 2006 60 74
    • (2006) Naval Research Logistics , vol.53 , Issue.1 , pp. 60-74
    • Liu, J.1    Wan, Y.W.2    Wang, L.3
  • 13
    • 33745586759 scopus 로고    scopus 로고
    • Quay crane scheduling in container terminals
    • DOI 10.1080/03052150600691038, PII H575056282370719
    • W.C. Ng, and K.L. Mak Quay crane scheduling in container terminals Engineering Optimization 38 6 2006 723 737 (Pubitemid 43982685)
    • (2006) Engineering Optimization , vol.38 , Issue.6 , pp. 723-737
    • Ng, W.C.1    Mak, K.L.2
  • 14
    • 68249120807 scopus 로고    scopus 로고
    • A fast heuristic for quay crane scheduling with interference constraints
    • C. Bierwirth, and F. Meisel A fast heuristic for quay crane scheduling with interference constraints Journal of Scheduling 12 4 2009 345 360
    • (2009) Journal of Scheduling , vol.12 , Issue.4 , pp. 345-360
    • Bierwirth, C.1    Meisel, F.2
  • 15
    • 1642618965 scopus 로고    scopus 로고
    • A crane scheduling method for port container terminals
    • K.H. Kim, and Y.M. Park A crane scheduling method for port container terminals European Journal of Operational Research 156 3 2004 752 768
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 752-768
    • Kim, K.H.1    Park, Y.M.2
  • 16
    • 33645693040 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    • L. Moccia, J.F. Cordeau, M. Gaudioso, and G. Laporte A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal Naval Research Logistics 53 1 2006 45 59
    • (2006) Naval Research Logistics , vol.53 , Issue.1 , pp. 45-59
    • Moccia, L.1    Cordeau, J.F.2    Gaudioso, M.3    Laporte, G.4
  • 17
    • 34848836641 scopus 로고    scopus 로고
    • A tabu search heuristic for the quay crane scheduling problem
    • DOI 10.1007/s10951-007-0029-5
    • M. Sammarra, J.F. Cordeau, G. Laporte, and M.F. Monaco A tabu search heuristic for the quay crane scheduling problem Journal of Scheduling 10 4-5 2007 327 336 (Pubitemid 47501054)
    • (2007) Journal of Scheduling , vol.10 , Issue.4-5 , pp. 327-336
    • Sammarra, M.1    Cordeau, J.-F.2    Laporte, G.3    Monaco, M.F.4
  • 18
    • 77957307373 scopus 로고    scopus 로고
    • A unified approach for the evaluation of quay crane scheduling models and algorithms
    • F. Meisel, and C. Bierwirth A unified approach for the evaluation of quay crane scheduling models and algorithms Computers & Operations Research 38 3 2011 683 693
    • (2011) Computers & Operations Research , vol.38 , Issue.3 , pp. 683-693
    • Meisel, F.1    Bierwirth, C.2
  • 19
    • 33751017964 scopus 로고    scopus 로고
    • Double-cycling strategies for container ships and their effect on ship loading and unloading operations
    • DOI 10.1287/trsc.1060.0148
    • A.V. Goodchild, and C.F. Daganzo Double-cycling strategies for container ships and their effect on ship loading and unloading operations Transportation Science 40 4 2006 473 483 (Pubitemid 44746136)
    • (2006) Transportation Science , vol.40 , Issue.4 , pp. 473-483
    • Goodchild, A.V.1    Daganzo, C.F.2
  • 20
    • 77953540653 scopus 로고    scopus 로고
    • Container sequencing for quay cranes with internal reshuffles
    • F. Meisel, and M. Wichmann Container sequencing for quay cranes with internal reshuffles OR Spectrum 32 3 2010 569 591
    • (2010) OR Spectrum , vol.32 , Issue.3 , pp. 569-591
    • Meisel, F.1    Wichmann, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.