메뉴 건너뛰기




Volumn 62, Issue 1, 2012, Pages 119-128

Study on berth planning problem in a container seaport: Using an integrated programming approach

Author keywords

Berth and crane scheduling process; Mathematical programming; Optimization

Indexed keywords

BERTH ALLOCATION; BI-LEVEL PROGRAMMING; BRANCH AND BOUNDS; COMMON PROCESS; CRANE SCHEDULING; INTEGRATED PROGRAMMING; INTEGRATED SOLUTIONS; MIXED INTEGER LINEAR PROGRAM; NP-HARD; PLANNING PROBLEM;

EID: 82755171844     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2011.08.024     Document Type: Article
Times cited : (48)

References (26)
  • 1
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • C. Bierwirth, and F. Meisel A survey of berth allocation and quay crane scheduling problems in container terminals European Journal of Operational Research 202 3 2010 615 627
    • (2010) European Journal of Operational Research , vol.202 , Issue.3 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 2
    • 0037209478 scopus 로고    scopus 로고
    • A multiple-crane-constrained scheduling problem in a container terminal
    • E.K. Bish A multiple-crane-constrained scheduling problem in a container terminal European Journal of Operational Research 144 1 2003 83 107
    • (2003) European Journal of Operational Research , vol.144 , Issue.1 , pp. 83-107
    • Bish, E.K.1
  • 3
    • 28244441388 scopus 로고    scopus 로고
    • Models and tabu search heuristics for the berth-allocation problem
    • DOI 10.1287/trsc.1050.0120
    • J.F. Cordeau, G. Laporte, P. Legato, and L. Moccia Models and tabu search heuristics for the berth-allocation problem Transportation Science 39 4 2005 526 538 (Pubitemid 41706012)
    • (2005) Transportation Science , vol.39 , Issue.4 , pp. 526-538
    • Cordeau, J.-F.1    Laporte, G.2    Legato, P.3    Moccia, L.4
  • 5
    • 77957698525 scopus 로고    scopus 로고
    • A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
    • X. Han, Z. Lu, and L. Xi A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time European Journal of Operational Research 207 2010 1327 1340
    • (2010) European Journal of Operational Research , vol.207 , pp. 1327-1340
    • Han, X.1    Lu, Z.2    Xi, L.3
  • 6
    • 0031096047 scopus 로고    scopus 로고
    • Efficient planning of berth allocation for container terminals in Asia
    • A. Imai, K. Nagaiwa, and C.W. Tat Efficient planning of berth allocation for container terminals in Asia Journal of Advanced Transportation 31 1 1997 75 94 (Pubitemid 127603112)
    • (1997) Journal of Advanced Transportation , vol.31 , Issue.1 , pp. 75-94
    • Imai, A.1    Nagaiwa, K.2    Tat, C.W.3
  • 8
    • 33751395932 scopus 로고    scopus 로고
    • Berth allocation at indented berths for mega-containerships
    • DOI 10.1016/j.ejor.2006.03.034, PII S0377221706001913
    • A. Imai, E. Nishimura, M. Hattori, and S. Papadimitriou Berth allocation at intended berths for mega-containerships European Journal of Operational Research 179 2007 579 593 (Pubitemid 44821619)
    • (2007) European Journal of Operational Research , vol.179 , Issue.2 , pp. 579-593
    • Imai, A.1    Nishimura, E.2    Hattori, M.3    Papadimitriou, S.4
  • 10
    • 0035372166 scopus 로고    scopus 로고
    • Berth allocation planning in the public berth system by genetic algorithms
    • DOI 10.1016/S0377-2217(00)00128-4, PII S0377221700001284
    • A. Imai, E. Nishimura, and S. Papadimitriou Berth allocation planning in the public berth system by genetic algorithms European Journal of Operational Research 131 2001 282 292 (Pubitemid 32271744)
    • (2001) European Journal of Operational Research , vol.131 , Issue.2 , pp. 282-292
    • Nishimura, E.1    Imai, A.2    Papadimitriou, S.3
  • 11
    • 82755168190 scopus 로고    scopus 로고
    • Comments on World container and general cargo shipping
    • Institute of Shipping Economics and Logistics
    • Institute of Shipping Economics and Logistics (2008). Comments on World container and general cargo shipping. Supply and Demand in the Container Trades Report 2009.
    • (2008) Supply and Demand in the Container Trades Report 2009
  • 13
    • 1642618965 scopus 로고    scopus 로고
    • A crane scheduling method for port containers terminals
    • K.H. Kim, and Y.M. Park A crane scheduling method for port containers terminals European Journal of Operational Research 156 3 2001 752 768
    • (2001) European Journal of Operational Research , vol.156 , Issue.3 , pp. 752-768
    • Kim, K.H.1    Park, Y.M.2
  • 14
    • 60549101050 scopus 로고    scopus 로고
    • A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning
    • C. Liang, Y. Huang, and Y. Yang A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning Computers and Industrial Engineering 56 2009 1021 1028
    • (2009) Computers and Industrial Engineering , vol.56 , pp. 1021-1028
    • Liang, C.1    Huang, Y.2    Yang, Y.3
  • 16
    • 57149135986 scopus 로고    scopus 로고
    • Heuristics for the integration of crane productivity in berth allocation problem
    • F. Meisel, and C. Bierwirth Heuristics for the integration of crane productivity in berth allocation problem Transportation Research Part E 45 2009 196 209
    • (2009) Transportation Research Part e , vol.45 , pp. 196-209
    • Meisel, F.1    Bierwirth, C.2
  • 17
    • 11444266631 scopus 로고    scopus 로고
    • Yard crane scheduling in port container terminals
    • DOI 10.1016/j.apm.2004.09.009, PII S0307904X04001167
    • W.C. Ng, and K.L. Mak Yard crane scheduling in port container terminals Applied Mathematical Modelling 29 3 2005 263 276 (Pubitemid 40084089)
    • (2005) Applied Mathematical Modelling , vol.29 , Issue.3 , pp. 263-276
    • Ng, W.C.1    Mak, K.L.2
  • 18
    • 34848836641 scopus 로고    scopus 로고
    • A tabu search heuristic for the quay crane scheduling problem
    • DOI 10.1007/s10951-007-0029-5
    • M. Sammarra, J.F. Cordeau, G. Laporte, and M.F. Monaco1 A tabu search heuristic for the quay crane scheduling problem Journal of Scheduling 10 4-5 2007 327 336 (Pubitemid 47501054)
    • (2007) Journal of Scheduling , vol.10 , Issue.4-5 , pp. 327-336
    • Sammarra, M.1    Cordeau, J.-F.2    Laporte, G.3    Monaco, M.F.4
  • 19
  • 20
    • 17444364075 scopus 로고    scopus 로고
    • Container terminal operation and operations research - A classification and literature review
    • DOI 10.1007/s00291-003-0157-z
    • D. Steenken, S. Voß, and R. Stahlbock Container terminal operation and operations research - a classification and literature review OR Spectrum 26 2004 3 49 (Pubitemid 40549578)
    • (2004) OR Spectrum , vol.26 , Issue.1 , pp. 3-49
    • Steenken, D.1    Voss, S.2    Stahlbock, R.3
  • 23
    • 82755168179 scopus 로고    scopus 로고
    • Growing demand as indicated by the shipbuilding orderbook
    • Tianjin, China
    • Wang, A. (2007). Growing demand as indicated by the shipbuilding orderbook. In: World shipping summit (China), Tianjin, China.
    • (2007) World Shipping Summit (China)
    • Wang, A.1
  • 24
    • 33845684733 scopus 로고    scopus 로고
    • A stochastic beam search for the berth allocation problem
    • DOI 10.1016/j.dss.2006.06.008, PII S016792360600090X, Decision Support Systems in Emerging Economies
    • F. Wang, and A. Lim A stochastic beam search for the berth allocation problem Decision Support Systems 42 2007 2186 2196 (Pubitemid 44969944)
    • (2007) Decision Support Systems , vol.42 , Issue.4 , pp. 2186-2196
    • Wang, F.1    Lim, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.